WINNIPEG | 300 Main Street | 142 M/466 FT | 42 FLOORS
40-storey apartment tower planned for Portage and Main
Official announcement expected as early as next month Quote:
- Aprx: 400 Residential Units - New Build 300 Main St.(Phase II) | Re-Clad 360 Main St. - Cost: Aprx: $140M / Reclad $24M - 3 Floors Commercial space/4 storey podium - Office/Retail - Start: February 2017 | Completion 2019 April 7.2016 First Render Release: http://www.metronews.ca/news/winnipe...nd-graham.html I've edited the photo and scaled it to a smaller size. Feel free to use it in other discussions and posts. https://farm2.staticflickr.com/1644/...b6c0fd0b_z.jpg Other Conceptual Renders From: Artis REIT * Note: All images edited/hosted by me. Please add Artis link source + This note if using on site: Thx. 300 Main St. https://farm2.staticflickr.com/1541/...27dac831_c.jpg Looking South on Main St. https://farm2.staticflickr.com/1595/...6b30c2e4_c.jpg https://farm2.staticflickr.com/1588/...5b96b760_c.jpg https://farm2.staticflickr.com/1531/...f3fa5994_c.jpg Image Sources: http://www.artisreit.com/360-main-bu...-announcement/ |
This is in it's early stages. This proposal by Artis REIT could potentially range from 40 to 44 floors to even taller in height. New announcement with conceptual renders....Wait and see...
|
So I take it this is proposed for the unbuilt Winnipeg Square II site? Looks good!
|
^ That's the site, Phase II almost 4 decades later !
|
So this is two 500' proposals for Winnipeg?
|
Quote:
|
added a drawing for this building
|
Quote:
>> http://skyscraperpage.com/diagrams/?buildingID=108830 I guess the biggest question was floor count. At this point media/video releases from Artis say 40 floors with a potential to go higher. The first conceptual renders come in at 44 flrs. contrary to what their media releases have said...40. Could be 44flrs ? but it could be less. Let's hope for more..:tup: |
Quote:
But to be clear, this proposal is discussing a new ~500' tower, at 300 Main St. The tower beside it is a re-clad and has existed for 27 years at 360 Main St. The other proposal, relatively new to Winnipeg, is SkyCity, coming in at 575', now in the pre-construction/pre-sale phase.:) |
Manitoba/Sask. Forum Discussion Thread:
http://forum.skyscraperpage.com/showthread.php?t=221811 Data Base Building Page: http://skyscraperpage.com/cities/?buildingID=108830 |
https://c2.staticflickr.com/8/7103/2...5c316a98_b.jpg
SSP Forumer Photo Credit: 1ajs Re-Clad of the the decades old 360 Main St tower begins. First phase, of the ArtisReit pad site that will also be home to their new tower @ 300 main, Construction to begin in Feb.2017. |
Winnipeg | 300 Main Street | 42 FLOORS
Location: 300 Main Street
Developers: Artis REIT https://300main.ca/ Architect: Raymond SC Wan Architects http://raymondscwanarchitect.com/300-main/ Floors: 42 Height: 465’ Quote:
https://i.imgur.com/1Dw9s3w.jpg https://i.imgur.com/Fevttcu.jpg https://i.imgur.com/pq2JVAH.jpg https://i.imgur.com/vHvqw8d.jpg https://i.imgur.com/wheKh9g.jpg https://www.artisreit.com/files/2017...4-1024x605.jpg https://i.imgur.com/2yQoZfu.jpg https://i.imgur.com/4Z6ZICC.jpg https://i.imgur.com/tnyOeGE.jpg https://i.imgur.com/og9GDiW.jpg https://static.seekingalpha.com/uplo...jpg?1497634888 https://pbs.twimg.com/media/DpuU30nU4AAlayj.jpg https://twitter.com/arianneyuson/sta...98635173765120 https://pbs.twimg.com/media/D19JlQAXcAEF8cL.png:large https://i.imgur.com/zCs7fuj.jpg https://www.instagram.com/p/BxS79BigKWA/ |
The foundation for the site was build 40 years ago for phase two of a tower development that never materialised. Today the pad site is the roof of an underground mall. The building should rise quick as there is no foundation to dig here:
Quote:
https://i.imgur.com/xhpTbuK.jpg https://i.cbc.ca/1.3510872.145927292...al-drawing.jpg A drawing shows the original plan for Winnipeg Square at the corner of Portage Avenue and Main Street. The structure on the left, at the south end of the development, was never built. (Courtesy of Winnipeg Architecture Foundation) Marwest Development and Construction sign is up https://instagram.fybz2-1.fna.fbcdn....78775296_n.jpg https://instagram.fybz2-1.fna.fbcdn....78775296_n.jpg kevin (@garnettttt) on Instagram Quote:
Quote:
|
merged with the existing thread
|
Quote:
|
Update
Quote:
|
https://pbs.twimg.com/media/Dhiqc_KX0AAX6S2.jpg:medium
https://pbs.twimg.com/media/Dhiqc_KX0AAX6S2.jpg:large @Paul_Hesse Twitter Work continues at the site of the future residential tower at 300 Main Street. |
|
|
Update
Quote:
|
All times are GMT. The time now is 9:49 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.