PITTSBURGH | Pitt Victory Heights, Sports Performance & Recreation and Wellness Cntr
The University of Pittsburgh is currently constructing the three complexes simultaneously. All three are built into a steep hillside overlooking the main campus. Pitt ensured connectivity between the upper and lower campus by creating pedestrian friendly pathways through all three structures. The Arena is topped with a green roof complete with meandering pathways connecting all three structures. This complex is build next to the University of Pittsburgh Peterson Events Center.
https://pittsburghpanthers.com/feature/victory-heights https://www.reccenter.pitt.edu/ |
The recreation and wellness center sits at the base of the hillside (pictured). The arena structure is partially imbedded into the steep hillside and topped with a green roof. The Sports Performance Center will sit above the green roof the arena. All three structures will connect with interior and exterior pedestrian pathways.
[IMG]http://[url=https://flic.kr/p/2p8rBiD]https://live.staticflickr.com/65535/...3cf6ff63_b.jpg[/url]Pittsburgh Construction Update by William Pipkins, on Flickr[/IMG] |
[IMG]http://[url=https://flic.kr/p/2p8sCM5]https://live.staticflickr.com/65535/...a0fc7c2e_b.jpg[/url]Pittsburgh Construction Update by William Pipkins, on Flickr[/IMG]
[IMG]http://[url=https://flic.kr/p/2p8rzZw]https://live.staticflickr.com/65535/...8a23ebfd_b.jpg[/url]Pittsburgh Construction Update by William Pipkins, on Flickr[/IMG] [IMG]http://[url=https://flic.kr/p/2p8rBme]https://live.staticflickr.com/65535/...7f5173a1_b.jpg[/url]Pittsburgh Construction Update by William Pipkins, on Flickr[/IMG] The UPMC tower crane (red) rises on the adjacent lot. [IMG]http://[url=https://flic.kr/p/2p8qGaX]https://live.staticflickr.com/65535/...7c802bd6_b.jpg[/url]Pittsburgh Construction Update by William Pipkins, on Flickr[/IMG] |
All times are GMT. The time now is 8:12 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.