NEW YORK | 11 Hoyt Street (217 Livingston St) | 664 FT | 51 FLOORS
Plans For Downtown Brooklyn Macy’s Redevelopment By Leeser Architecture And Ismael Leyva
http://www.yimbynews.com/wp-content/...8.17.36-AM.png http://www.yimbynews.com/wp-content/...6.19.14-AM.png Quote:
What it will replace: http://www.yimbynews.com/wp-content/...wzEyq6TJ2.webp http://www.yimbynews.com/wp-content/...lRdwMi-Lr.webp ============================= http://www.yimbynews.com/2015/06/vis...ael-leyva.html |
I was gonna say, it's been at least 2 weeks since a (near) supertall was proposed in NYC, I think we're overdue for another :D
#SpoiledNewYorkers |
I agree. If Leeser Architecture wins the design, its one step closer for Brooklyn to breach the 1000 foot mark. Design wise, its not bad.
Overdue, yes! In such an age, its an essential. At 1.2 million sq-ft, either way, it will big. |
Finally some concrete plans for this site. This is one of the biggest sites on Fulton street mall that needs to be redeveloped. Both proposals are looking good for this location as well.
|
The second one looks kinda like a scaled up version of Philly's East market
The "what it will replace" in the OP doesn't show up for me, but maybe that's for the better.:) Part of this project involves tearing down a real butt-cheese parking garage which unfortunately involves multiple ownerships AFAIK.... As soon as I get my Flickr account back in order I'll try to post pics of the area when I was in Brooklyn a while back.... |
This whole thing pretty much started when Macy's decided thay wanted a whole new downtown store built from the ground up to replace the building it inherited from Abraham and Straus (history of the A&S store here)
Macy first proposed a long overdue remodel, then they dropped it for bigger ideas.... Racked article from last July: http://ny.racked.com/2014/7/16/75864...ntown-brooklyn Quote:
http://www.yimbynews.com/2015/01/fir...-brooklyn.html http://www.yimbynews.com/wp-content/...2511749563.jpg The old 450-458 Fulton Street and possible plan for the building, image by Beyer Blinder Belle/Brookfield http://www.yimbynews.com/wp-content/...I4b9uTOx6w.jpg 217 Livingston Street,image by Beyer Blinder Belle/Brookfield Quote:
|
I worked at that Macy's in Brooklyn years ago.
Quote:
Careful with those fighting words. For the past few years, every new "Brooklyn's tallest" has been topped by something else. And with the two towers on Flatbush being potentially higher, a battle could be ignited for the final crown. |
Rename: NEW YORK | 11 Hoyt St (217 Livingston St) | FT | FLOORS
A recap: The nine-story 422 Fulton Street will be expanded by five stories. The first four levels will be the Macy's. Upper 10 levels are offices. Tishman plans to redevelop the five-story parking garage at 11 Hoyt Street/217 Livingston Street. It's not known if 450-458 Fulton Street is going to be purchased/incorporated. It also doesn't appear Macy's is requiring new space in this part of the redevelopment. Macy's will spend $100 million making over outdated downtown Brooklyn store http://www.crainsnewyork.com/apps/pb...creen&maxw=770 By Adrianne Pasquarelli August 12, 2015 Quote:
The parking garage: Quote:
|
I just hope they end up preserving the Art Deco glass elevator shaft somehow. Really nothing like that anymore....
|
Developers Look to Foreign Investors to Fund Brooklyn Projects
https://cdn0.vox-cdn.com/thumbor/ub-....23_20AM.0.png Quote:
CBNY http://www.wsj.com/articles/u-s-immi...984601?tesla=y |
Details, renderings of Macy’s DoBro overhaul unveiled
http://therealdeal.com/wp-content/up...Macys-FRCH.jpg http://therealdeal.com/wp-content/up...H-interior.jpg Quote:
|
|
So, Tishman Speyer still thinks to build the 910 foot tower above the garage site?
|
I have doubts on this tower or the one in the OP. It's been quiet for too long.
|
https://www.6sqft.com/revealed-leese...yn-macys-site/
LEESER Architecture Dreams Up an 80-Story Supertall for Downtown Brooklyn Macy’s Site AUGUST 18, 2016 BY DANA SCHULZ Quote:
https://imgs.6sqft.com/wp-content/up...n-Macys-1.jpeg |
Its a shame that the existing structure has work on it all the way up to 2018. I wish they could just build something here already, while the markets hot.
|
https://therealdeal.com/issues_artic...rs-heavy-lift/
Rob Speyer’s heavy lift The Tishman Speyer CEO has supersized his family’s company, but can he shoulder all the weight? April 01, 2017 By Katherine Clarke Quote:
|
https://bklyner.com/creative-hub-hea...town-brooklyn/
A Creative Hub, Health Center, & Mixed-Use Building Coming To Downtown Brooklyn By Pamela Wong April 3, 2017 Quote:
|
This intrigues me, because I once worked on those upper floors at Macy's on Fulton.
https://www.nytimes.com/2017/04/04/r...eyer.html?_r=0 Downtown Brooklyn’s Dearth of Office Space Beckons Tishman Speyer https://static01.nyt.com/images/2017...-master675.jpg By JULIE SATOW APRIL 4, 2017 Quote:
|