Don't recall if this was posted before but I see whatever B.C. calls their transportation department is conducting a customer satisfaction survey.
https://survey.th.gov.bc.ca//TakeSur...veyID=css2019# |
|
Good to hear, especially with the median barrier, but I wish they would upgrade the West Shore Parkway intersection to an interchange.
If done, that would kind of compete the #1 as a freeway through greater Victoria. |
I didn't end up driving along Hwy 1 between the border and Sicamous this year...were there any improvements/4-laning projects being done this construction season?
|
Quote:
|
|
That really is going to suck. I hope they upgrade that stop sign in radium.
|
Quote:
|
Are there plans released yet for the new route that will be built?
|
Quote:
But the drive through there is still going to suck. I think for the next four years the yellowhead will be my primary drive to the coast and interior. |
Crowsnest Highway will also see more traffic in the meantime.
|
Quote:
|
Quote:
Quote:
eg. I know these people: https://www.homathkoriver.com/ And these people: http://www.pasturetoplate.ca/kinikin...taurant-store/ And these people: http://tatlalakemotel.com/ etc. |
deleted. sorry responded to an old question
|
Quote:
My Ontarian mindset’s kicking in: If BC really wants, it can just take out the properties too close to the highway to build interchanges. It’s what it is. |
Quote:
This is pretty exciting. |
“The improvements must be built with a view to safety, cost-effectiveness and as little disruption as possible to highway users and the community.”
LOL |
I had assumed they would be closing it for weeks at a time, but it sounds like they will be mostly limiting the length of closures to less than 24hrs except for outside of the peak seasons.
|
Quote:
Awesome, thanks! That is a pretty good looking design overall. If the Federal government was smart (.....) they would plan to do significant upgrades to the two-lane sections in Yoho National Park during the same periods of lane closure. At the very least, they could complete a lot of the preparatory work required to finish 4-laning to the border. |
The Sea to Sky, which cost 600 million to rebuild, costs the same as this 4 km section. WTF? The Sea to Sky rebuild isn't even 10 years old.
|