DATABASE CORRECTIONS: Boston, MA
http://skyscraperpage.com/cities/?buildingID=131228
--/Note: The project description via the City of Boston has been updated for this project. The corrections below pertain to the same building proposal and only indicate fields that now have additional information that was previously missing. /-- Official sources: http://www.bostonplans.org/projects/...chester-avenue https://caughtinsouthie.com/living/s...orchester-ave/ Building Name: 323-365 Dorchester Avenue – West Residential Building Street Address: 323-365 Dorchester Avenue • Architect: COOKFOX Architects • Floor to floor height: 3.59M Coordinates (with decimal fraction): 42.336081934165385, -71.05872581817528 Heights-- - roof: 88.4M (source: BPDA [Boston Planning & Development Agency] - https://bpda.app.box.com/s/98c7g8vks...up3nomo0eu7zjp - page 55) - top floor: 75.1M (source: BPDA [Boston Planning & Development Agency] - https://bpda.app.box.com/s/98c7g8vks...up3nomo0eu7zjp - page 55) Current Building Status: Proposed Construction Dates-- - anticipated completion: 2026 Above ground floors: 20 Gross Floor area: 19,649m2 Unit count: 130 Building Use(s): Residential, retail, parking garage Building Style(s): Modern Building Materials: Brick, glass, metal, steel, concrete ----------------------------------------------------- https://skyscraperpage.com/cities/?buildingID=132036 Official sources: https://archboston.com/community/thr...rt.6335/page-3 Current Building Status: Under Construction Construction Dates-- - started: 2021 - will finish: 2024 Building Style(s): Modern Building Materials: Glass, steel, metal, concrete ----------------------------------------------------- https://skyscraperpage.com/cities/?buildingID=122228 Official sources: https://www.bldup.com/posts/interior...eaport-offices http://www.bostonplans.org/getattach...6-5a1966c25d1c • Floor to floor height: 3.96M Heights-- - roof: 75.9M (measured via source: BPDA [Boston Planning & Development Agency] - http://www.bostonplans.org/getattach...6-5a1966c25d1c - page 11) Current Building Status: Built Construction Dates-- - started: 2019 - finished: 2021 Above ground floors: 17 Underground floors: 3 Building Materials: Glass, aluminum, steel, concrete |
All times are GMT. The time now is 4:03 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.