![]() |
Quote:
https://www.reddit.com/r/sandiego/co...bay_this_past/ |
Update from Riverwalk:
https://riverwalksd.com/riverwalk-sa...ress-update-2/ The groundbreaking was supposed to happen early 2022. Then it got pushed to April 2022. Now it's pushed to July 2022. Frustrating, but at least it's something good, a TOD with no parking minimums and required unbundled parking! Now SANDAG please oh please forget about subsidizing free transit and save up that money to instead increase Green Line frequencies as soon as possible. Otherwise everyone at Riverwalk will drive for short trips within Mission Valley because no one's waiting 15 minutes for a 10-15 minute Trolley ride. |
Quote:
|
Does anyone know what's up with the scrapped lot on the backside of Grocery Outlet?
Will O' Wisp any info on East Village Green? Funding was announced a long time ago and wasn't it supposed to be finished by this year :shrug: |
Quote:
|
Tijuana Construction
TIJUANA: Construction starts on $66M, 33-story medical building in Tijuana
Phillip Molnar May 5, 2022 https://www.sandiegouniontribune.com./business/story/2022-05-05/first-look-construction-starts-on-66m-33-story-medical-building-in-tijuana https://ca-times.brightspotcdn.com/d...xterior-01.png Quote:
Quote:
|
found a picture of the "RADD' IQHQ model
Incredibly underwhelming. I mean the buildings. https://twitter.com/FuscoeFCT/status...vVIbLt4p02YyCw https://pbs.twimg.com/media/FQvIpKDU...jpg&name=small |
Quote:
|
Quote:
Has the SF been downgraded from the original? This looks smaller? |
Quote:
I'm curious which will be more true to final product, the 3D model or the marketing material. I don't find either disappointing, especially considering what could have been if they built the original Manchester Pacific Gateway designs. |
Yeah I was definitely getting UTC vibes from the new designs, but I think the massing hasn't changed from what was originally proposed. I definitely dislike the building directly in front of the Navy HQ. The one to the left isn't great either, but at least it has height. They are both incredibly awkward looking. Why not give them an undulating, but modern, wavy facade to match its waterfront location?
|
Will it finally get built?
Stage Nearly Set for Construction on Chula Vista Bayfront's Billion-Dollar Resort https://www.nbcsandiego.com/news/loc...oject/2943723/ https://pbs.twimg.com/media/FSgeV2dV...pg&name=medium |
Just in time for the economic collapse that is finally starting. I guess they will say "well we will build it during this depression and by the time it finally opens we will be coming out of it".
Obviously tech is getting hammered how do you guys think the Horton Plaza project will be affected by this? Will they get tenants :shrug: |
Quote:
|
Quote:
https://www.geekwire.com/2022/amazon...nia-tech-hubs/ I think they'll find tenants for the Horton offices, especially given its prime location. |
Quote:
|
Quote:
Of course I thought the pan-panic, of the last two years, would have the same effect. And boy was I wrong about that. |
East Village Green, downtown San Diego’s long-promised park, now costs $80M and comes with fewer features
Jennifer Van Grove May 17, 2022 https://www.sandiegouniontribune.com...fewer-features https://ca-times.brightspotcdn.com/d...andiego-01.jpg Quote:
|
I saw this one pop up on a Vintage San Diego facebook group (they were very upset, with the feeling reflected in the second image). But I really like it. Located at 301 Spruce Street, it's 162 units with ground-level commercial. 17-stories, 180+ feet
https://i.imgur.com/bJe8DXg.jpg https://i.imgur.com/X8lbaAe.jpg |
I don't have any problems with the project itself but I think it would be better if there were a higher % of affordable units allocated.
|
All times are GMT. The time now is 6:11 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.