Phoenix | Central Station Towers 1 & 2 | 372 FT | 32 Floors & 230 FT | 22 Floors
Central Station renderings: Construction currently in progress.
Link to Downtown ASU Cam (will update this link if a full construction cam is provided): https://view.asu.edu/downtown https://i.imgur.com/AvksKWT.jpg https://i.imgur.com/ESbrPSg.jpg https://i.imgur.com/0J6a0Vd.jpg https://i.imgur.com/uQSjROD.jpg https://i.imgur.com/BWtzAws.jpg |
Quote:
They mention over 600 residents, but in reality, they are proposing over 500 units, so there would likely be more like 800 new residents or more downtown. This increases demand for everything. |
Central Station could really be a tipping point and catalyst for a lot of other additions like a grocery store, other retail, and then more residential living.
|
Does this really need its own thread yet?
Don't get me wrong, I have full (or fool) trust in Smithfield (the developer and contractor). They have been a top notch company since they arrived in the valley. They recently completed Domus in Arcadia, and are currently building another midrise west of the 51 north of Camelback. They have also done projects of similar scale to this one back in Chicago, where they are from. So I don't think there is any trepidation about this being a legit proposal. (here is their website for whomever wants to see what they have done: http://www.smith-field.com/) However we know how big projects like these can go. Can we wait until it at least gets through the city before we start subdividing it into its own group? |
There's been a couple newspieces on it lately, it seems to be going through cause of the GPLET and as you said the reputable developer, and we've created threads for much lesser projects. Moreover, it's good to start these early so for the retrospect we can see the articles that were posted about its early days up until it actually gets built, so I don't see any reason to lock this thread.
|
I'll bet by the time it finally gets built. Hopefuly around June 2021 will get a 15 story stump!
|
Please pardon me for bumping the thread without any updated news. Does anyone know if Central Station is in the planning stages or permitting process? There hasn't been any news, that I know of, in several months.
Please forgive me for the thread bump - I basically just wanted to know if the project is still alive? Thank you! |
The project is still alive.
I wish there were additional renderings and more details on the site plan. The plans have changed significantly in terms of the commercial space, and I'm very interested in how the southern 3/4 of the block will look, as the tower only occupies the northern 1/4. According to the following link: 1) commercial space has been increased from 4,500 sq ft to 30,000 sq ft 2) commercial space will be located on the ground level of the parking structure 3) SmithGroup has the option of splitting the tower in two and phasing construction https://www.phoenix.gov/publictransi...T%20110614.pdf Timeline: 18 months to commence construction (from November 2014, if I am reading correctly) 30 months to complete construction |
Th increase in commercial space is significant and great news!!!!
|
Quote:
But, I hope the 30,000 isn't a mistake and that it does include retail. I know I'm high on retail but this is our transit center; if that can't support some fast food dining options, we're screwed. Plus, you have the hotel across Central, Civic Space right there, and 500 new apartments on top! Come on. |
I agree. Talk about a built in client base!!!!
|
where is the most recent rendering, Jjs5056?
|
Here is an article from AZCentral that also mentions 30,000 sq ft of commercial...
http://www.azcentral.com/story/news/...lest/17177161/ |
Quote:
It contains the only renderings and site plan I have seen thus far. The site plan makes it seem as though 3/4 of the block will be a garage, which would be really lame. But, 30k sq feet of commercial can't possibly be on the ground level only, so I am hoping it's wrapped on at least some of its sides by office space. |
Does anyone know if Central Station is active and moving along with all the required permits etc.? Is construction still scheduled to start this upcoming summer? There has been very limited information about the project so I was hoping someone with hopefully more information could please clarify and share it with us? Thank you very much!
|
The listed start time is AUGUST of 2015. FINGERS CROSSED!!!!!! :)
|
Quote:
|
Here's hoping the design is radically modified prior to August.
|
Quote:
Hey but at least its an Oval, we don't have any Oval buildings. |
Quote:
I actually don't mind the design of the tower... if it were being built next to the YMCA, it'd be fantastic. But, in its current state - only frontage is on to a private driveway with blank walls facing Central and 1st Ave, its orientation will cast terrible shadows over the park and destroy the city views - it's really frustrating. And, there's the fact that the tower takes up less than 1/4 of the entire lot, with the rest of the site being dedicated to a massive garage with a blank wall/ramp facing Van Buren in an area that should be a connection between EVB and WVB. On 75% of one of the best sites in downtown, we are getting a huge garage, with 1 office on the ground level facing 1st Ave and 1 incubator space facing Central. This would've been an awesome location for the DeSoto market...opening onto 3 of the busiest downtown blocks, and connected to the park... sigh. |
All times are GMT. The time now is 9:17 PM. |
Powered by vBulletin® Version 3.8.7