DALLAS | The Tower at Hall Arts | 50 FLOORS
Went ahead and created the thread for this building because the 1st face (KPMG Plaza) is complete. According to the developer the next phase will be announced this fall:
Exclusive: Developer Craig Hall planning next phase of Hall Arts in Dallas Quote:
Quote:
http://wpc.12437.edgecastcdn.net/001...elopmentmc.jpg http://hallarts.com/development/ These are the latest renderings we have. Estimated 45-50 stories tall: https://s-media-cache-ak0.pinimg.com...4d7de9b06d.jpg |
That looks great!!!!
|
Sassy
|
Keep in mind that rendering around five years old.
|
According to today's announcement on the Residential (Phase 2), this tower is now proposed at 50 stories.
Quote:
|
The article says 50-story office tower. Assuming that's not a typo or error, that has some significant height implications. A 50-story office tower in today's standards is going to be 800+ ft.
|
Preliminary model of this building is shown at top left corner, behind the featured Phase 2 buiildings. Courtesy of Sic'EmBears.
http://i628.photobucket.com/albums/u...11.16%20AM.png http://www.bizjournals.com/dallas/ne...-addition.html |
Judging from that it looks like it's maybe around 600 feet or so. The Chase Tower is 596 feet to that 2nd setback from the top.
|
Now the hard part is trying to find tenants or a significant enough lead tenant to get this big boy underway. It'll take some hefty sway to pull the enticement of Collin County, Frisco and Plano's Legacy West, away and bring em to DTD. Then you have the smaller buildings and larger ones like McKinney & Olive in Uptown, Harwood, and the eventual development in the Design District.
|
Isn’t this tower currently under construction??
|
Quote:
|
All times are GMT. The time now is 3:29 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.