Correction - Two buildings in Montreal
Hi,
There is a building called "The Duke" that is shown as U/C in the Montreal diagram. The design as shown by the diagram is one of a project which has not been heard of for more than a year. There was probably confusion with another project called "Le Duke" on the same street which has been U/C for a while. Also, the project (of which I am currently making the diagram) called "2025 Peel" is now U/C instead of proposed. For reference, I am now talking about these two projects: https://i.postimg.cc/HL8hHHVr/Captur...a-13-29-08.png |
so what we should correct?
|
Quote:
|
All times are GMT. The time now is 7:59 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.