DetroitMan May 30, 2011 4:00 AM

KALAMAZOO | The Exchange (155 W Michigan Ave) | 182 FT | 15 Floors
 
This project definitely came out of left field. It will certainly be a nice addition to the Kalamazoo downtown urban fabric. Plus its being built on a surface lot.
Developer picks prime downtown Kalamazoo locale to erect 8-story mixed-use complex

Quote:

The $24 million eight-story building that is planned for downtown Kalamazoo featuring, among other elements, a bank as the anchor retail tenant and about 50 "upscale" apartments will be rising on what is prime real-estate but currently a private parking lot in the city's central business district.

The project to be located at Michigan Avenue and Rose Street is that of Kalamazoo developer, Phoenix Properties, and designed by architects TowerPinkster. The project was announced Thursday as a "skyline-changing" addition to downtown.

View a video of the planned project here.

The 200,000-square-foot building, set for completion in late 2012 or early 2013, will also feature ground-level retail, upper-floor office space and internal parking. Groundbreaking is expected to begin later this year.
http://www.mlive.com/news/kalamazoo/..._downtown.html

Here's some renderings from the developers blog.
http://3.bp.blogspot.com/-PzMeFmY4xJ...600/scene9.jpg


http://1.bp.blogspot.com/-E_edg2X5_i...600/scene3.jpg

http://4.bp.blogspot.com/-PYMvvrFLSB...600/scene1.jpg

DetroitMan May 30, 2011 5:25 AM

If this project breaks ground, it would certainly add to the momentum of development along Michigan Avenue in DT Kalamazoo. Another project that got underway last December is the Metropolitan Center. It involves the redevelopment of four buildings at 105, 113, 119, 123 and 127 East Michigan Avenue. Plans call for 30,000 square feet of space to be turned into a mixed-use development. The final project will have retail on the ground level, 28 residential units on the 2nd and 3rd floors. It will be complete in 2012.

Here's some photos of the progress from the developers facebook page.
http://a4.sphotos.ak.fbcdn.net/hphot..._6945640_n.jpg

http://a5.sphotos.ak.fbcdn.net/hphot..._3986656_n.jpg

http://kalamazoometropolitancenter.com/

animatedmartian May 17, 2016 2:51 PM

This project has been upgraded to 12 stories.
Quote:

The Exchange building grows into $35 million, 12-story project
By Emily Monacelli. MLive. May 17, 2016.

http://i577.photobucket.com/albums/s...pst5uhnw6w.png


The Exchange building, a commercial and residential project planned for the southeast corner of Rose Street and Michigan Avenue, is now a $35 million, 12-story project. It will offer 140 one-and two-bedroom market-rate apartments, covered parking and commercial space.

First announced in May 2011, the Exchange building had been billed as a $28 million, nine-story building with one story below ground, which would offer 50 market-rate apartments, covered parking and commercial space.

Developer Gregory Taylor of Phoenix Properties has teamed up with Plazacorp for the bigger project. It is expected to break ground this fall.

....
http://www.mlive.com/news/kalamazoo/..._exchange.html

The project was previously stalled due to financing issues.

deja vu Mar 19, 2017 2:39 PM

FYI, I have included this proposed high-rise in the project rundown for the new KALAMAZOO / PORTAGE Development Thread that was recently started. You can link to that here.

I don't know the current status of this project but it still seems held up. The site signage was changed relatively recently, with the previous project rendering image removed. Now PlazaCorps's website shows this proposed project as a 15-story, 335,000 SF mixed-use tower, and states that Chemical Bank would anchor the property with a new 2-story, 14,000 SF suite. The proposed building will feature about 60,000 square feet of commercial space, internal parking, and luxury apartments.

Anyone have more information on this?

https://tb26ha.sn.files.1drv.com/y4m...&cropmode=none
Image: Rendering of The Exchange
Image Source: PlazaCorp

the urban politician Mar 20, 2017 1:42 AM

Wow, it just got uglier and uglier as the years passed. Yay.

Keep the damn parking lot

Rizzo Mar 20, 2017 5:23 AM

Oof wow that is bad. The previous tower pinkster version was fine, why did it get changed to this mess?

deja vu Mar 21, 2017 3:32 AM

Granted, it is a sketchy rendering, but the form just seems...dated. Maybe they were trying to reference some of the curved tower architecture happening across the street at the Radisson.

I have a feeling this is still not what the final design will be, if ever built. The fact that the imagery on the site signage is completely gone is some indicator that this is still in flux.

It seems like there's been a changing of the guard, because Tower's name is gone from the site signage, but Byce & Associates is now listed, and if you go to their website, it's the first thing featured.

deja vu Mar 21, 2017 4:01 AM

Update - I just did a little more research. On Byce's website, it states that the project is 'in design' and construction is scheduled to commence in 'early 2017' with occupancy by mid-2018. I won't hold my breath.

There are also some floor plans:

First / Ground Floor Plan:
https://uy8gmw.sn.files.1drv.com/y4m...&cropmode=none

Upper (Ninth) Floor Plan:
https://vi8gmw.sn.files.1drv.com/y4m...&cropmode=none
Images Source: Byce Website

Also, this MBiz article says that all of the state approvals and incentives the development team was looking for to move forward were received back in December, including a $6.4 million Michigan Community Revitalization Program (CRP) loan towards the now estimated $52.7 million project. It puts the construction timeline at 20 months long, from groundbreaking to completion.

deja vu Apr 14, 2017 3:52 AM

Site Prep is Underway at The Exchange Site
 
I did a double-take this morning as I was driving in to work and saw site barriers and fencing being installed around the Exchange site, at the southeast corner of Michigan Avenue and Rose Street. The far right lanes on both Michigan and Rose are now blocked to traffic. By all appearances, this project is now moving forward, and initial site prep is underway.

Here are some photos that I took later in the day - not much to see here yet, but you can get a sense of the area.

https://6zeqsw-sn3301.files.1drv.com...&cropmode=none

https://6deqsw-sn3301.files.1drv.com...&cropmode=none

https://6teqsw-sn3301.files.1drv.com...&cropmode=none

https://3zeqsw-sn3301.files.1drv.com...&cropmode=none

https://5jgppg-sn3301.files.1drv.com...&cropmode=none

https://5zgppg-sn3301.files.1drv.com...&cropmode=none

https://5dgppg-sn3301.files.1drv.com...&cropmode=none

https://5tgppg-sn3301.files.1drv.com...&cropmode=none

https://3jeqsw-sn3301.files.1drv.com...&cropmode=none

At 15 stories, this is a considerable size building for the city, and it will be the largest development happening in the city once it breaks ground, which could be very soon, by the looks of it. I hope we see updated / improved renderings soon.

PS - Is there any way to change / update the thread title? Since we know a bit more info about the project now?

deja vu Apr 15, 2017 7:52 PM

New Rendering is up
 
Quote:

I hope we see updated / improved renderings soon.
Well, ask, and you shall receive I guess. A new rendering is up...not much difference, except some changes to the treatment of the parking deck levels.

https://6dfgna-sn3301.files.1drv.com...&cropmode=none
Image Source: MLive

deja vu Apr 26, 2017 12:23 AM

Excavation progress is underway at the site of the planned 15-story Exchange building. Work is moving quickly at the moment - Some photos from today.

https://plp0dq-sn3301.files.1drv.com...&cropmode=none

https://87p0dq-sn3301.files.1drv.com...&cropmode=none

https://pbp0dq-sn3301.files.1drv.com...&cropmode=none

https://8rp0dq-sn3301.files.1drv.com...&cropmode=none

deja vu Apr 26, 2017 6:00 PM

I found some plans of a few more of the floor levels, in a brochure on PlazaCorp's website.

https://pl8zmq-sn3301.files.1drv.com...&cropmode=none

https://pb8zmq-sn3301.files.1drv.com...&cropmode=none

The penthouse floor plan shows the potential for three possible suites to be built-out, along with four separate roof terraces. While the idea of a penthouse level restaurant / lounge would be neat, I'm surprised that this floor isn't planned to be all residential instead.

deja vu Apr 29, 2017 2:43 PM

A bit of history uncovered during Kalamazoo construction
by Mike Krafcik, WWMT
April 25, 2017

WWMT did a short story about some old brick arches that were unearthed during excavations for the new Exchange tower. If you like history, you might find it interesting. Here's a link to the video; I couldn't figure out how to embed it directly: http://wwmt.com/news/local/a-bit-of-...o-construction

Quote:

KALAMAZOO, Mich. (NEWSCHANNEL 3) – A bit of history has been uncovered in downtown Kalamazoo as construction crews unearthed arches that date back decades. The discovery was made under a parking lot at the corner of Rose Street and Michigan Avenue, where construction of the new 15-story Exchange Building is underway. Kalamazoo’s Public Works Director says it’s not surprising that the vaults were uncovered, it was once an important part of older, brick buildings.
It would be neat if some of that old brick could be incorporated into the new work. Kinda makes you wonder what is buried under the many other surface lots in the city. Here's some screenshots from the news story.

https://879pgg-sn3301.files.1drv.com...&cropmode=none
The Arches

https://pl9pgg-sn3301.files.1drv.com...&cropmode=none
JR Jones & Sons Department Store, of which the brick arches are suspected to be a part of.

deja vu May 14, 2017 5:58 PM

Official groundbreaking for The Exchange was on Friday, although site prep and foundation work is already underway. Opening is now set for spring of 2019. At 15 stories tall, this is about as good as it gets for Kalamazoo.

Work begins on long-awaited Exchange Building in Kzoo

deja vu Jun 3, 2017 8:48 PM

Construction update photos, taken 6/2 and 6/3, by me. The foundations are well underway for the eastern portion of the building (Lobby 'A' elevator core) and electrical utility work is occurring in the alley behind.

https://uutkaa-sn3301.files.1drv.com...&cropmode=none

https://uktkaa-sn3301.files.1drv.com...&cropmode=none

https://xetkaa-sn3301.files.1drv.com...&cropmode=none

https://hrsidw-sn3301.files.1drv.com...&cropmode=none

https://hbsidw-sn3301.files.1drv.com...&cropmode=none

https://ghsidw-sn3301.files.1drv.com...&cropmode=none

https://ibsidw-sn3301.files.1drv.com...&cropmode=none

https://gxsidw-sn3301.files.1drv.com...&cropmode=none

CastleScott Jun 3, 2017 10:02 PM

^ Nice pics and this should climb fast since they're not going down very far.

deja vu Jun 4, 2017 2:19 AM

Quote:

Originally Posted by CastleScott (Post 7824092)
^ Nice pics and this should climb fast since they're not going down very far.

I hope you're right about it rising fast. And I was surprised to see no floor level below grade to speak of. Unless there will be some underground space on the other half of the site (but I don't think so). With the site bordered by Rose Street, Michigan Avenue, and The Kalamazoo Building, I suppose it would have been cost-prohibitive / technically infeasible to try to get any of the parking levels underground.

deja vu Jun 9, 2017 7:38 PM

A couple of pics from lunch today. Two excavators and a bulldozer on site. Crews are quickly removing all of the excavated earth that was piled up on the western half of the site and carting it somewhere else. I expect it's only a matter of days until they begin excavation on that half of the site for the rest of the foundation work.

https://gazlyg-sn3301.files.1drv.com...&cropmode=none

https://g6zlyg-sn3301.files.1drv.com...&cropmode=none

https://gqzlyg-sn3301.files.1drv.com...&cropmode=none

And just for fun, here's a few photos from Lunchtime Live!, in nearby Bronson Park (live music and food trucks every Friday through the summer):

https://f6zlyg-sn3301.files.1drv.com...&cropmode=none

https://gkzlyg-sn3301.files.1drv.com...&cropmode=none

https://hazlyg-sn3301.files.1drv.com...&cropmode=none

https://hqzlyg-sn3301.files.1drv.com...&cropmode=none

deja vu Jun 19, 2017 12:35 AM

Construction progress photos from Friday, 6/16, taken by me. The foundation work continues to march westward across the site at a rapid clip:

https://uqsnpq-sn3301.files.1drv.com...&cropmode=none

https://uasnpq-sn3301.files.1drv.com...&cropmode=none

https://uqqmyq-sn3301.files.1drv.com...&cropmode=none

https://vgsnpq-sn3301.files.1drv.com...&cropmode=none

https://vwsnpq-sn3301.files.1drv.com...&cropmode=none

https://vqsnpq-sn3301.files.1drv.com...&cropmode=none

deja vu Jun 19, 2017 12:40 AM

Another look at the site today, Sunday 6/18. Crews already removed the forms from the fresh concrete foundations poured on Friday, 6/16:

https://vasnpq-sn3301.files.1drv.com...&cropmode=none

https://sgsnpq-sn3301.files.1drv.com...&cropmode=none

https://swsnpq-sn3301.files.1drv.com...&cropmode=none

https://ugqmyq-sn3301.files.1drv.com...&cropmode=none

https://uaqmyq-sn3301.files.1drv.com...&cropmode=none

https://uwqmyq-sn3301.files.1drv.com...&cropmode=none

deja vu Jun 29, 2017 11:54 PM

Updates from today, 6/29/17. Several pours have occured in the past week and a half:

https://uy9rbq-sn3301.files.1drv.com...&cropmode=none

https://tyqqpa-sn3301.files.1drv.com...&cropmode=none

https://r49rbq-sn3301.files.1drv.com...&cropmode=none

https://uo9rbq-sn3301.files.1drv.com...&cropmode=none

https://si9rbq-sn3301.files.1drv.com...&cropmode=none

https://uiqqpa-sn3301.files.1drv.com...&cropmode=none

https://t4qqpa-sn3301.files.1drv.com...&cropmode=none

LMich Jun 30, 2017 12:31 AM

Do we think the office portion above the garage will be built with structural steel, or probably more of this reinforced concrete?

deja vu Jun 30, 2017 12:18 PM

Quote:

Originally Posted by LMich (Post 7850373)
Do we think the office portion above the garage will be built with structural steel, or probably more of this reinforced concrete?

My guess is that they will transition to steel once they are above the parking levels. I do not know this for sure though.

deja vu Jul 15, 2017 9:49 PM

Quote:

Originally Posted by deja vu (Post 7850713)
My guess is that they will transition to steel once they are above the parking levels. I do not know this for sure though.

I confirmed with the Architect that the 15th finish floor level will be at 161’ above grade, and the highest structure point at 182’-2” above grade. The building structure is to be all post-tensioned, cast in place concrete (no steel structure). It's beautiful outside today, sunny and upper 70s - perfect time for a walk and another photo update. I tried to explore some different vantage points today, that will become more useful as this thing rises.

These first two views are from the top deck of the Kalamazoo Center parking garage that connects to the Radisson (north-west of the site):
https://rkjpdw-sn3301.files.1drv.com...&cropmode=none

https://tejpdw-sn3301.files.1drv.com...&cropmode=none

And this view is from the Epic Center ramp, located south of the site. You can see the crane supporting the large foundation hole borer in the distance:
https://r0jpdw-sn3301.files.1drv.com...&cropmode=none

A closer look. Once the tower rises, I think it will completely fill the space between the 9-story Comerica Bank tower (left, black metal) and the 8-story Kalamazoo Building (right, red brick):
https://skjpdw-sn3301.files.1drv.com...&cropmode=none

Here's a crude rendering to depict that:
https://tujpdw-sn3301.files.1drv.com...&cropmode=none

At ground level now - looking east across S Rose St:
https://s0jpdw-sn3301.files.1drv.com...&cropmode=none

Consumer's Energy was there, doing some work down a manhole in the alley. Don't know if it was related to The Exchange or not:
https://qujpdw-sn3301.files.1drv.com...&cropmode=none

The western half of the building is not as far along:
https://qejpdw-sn3301.files.1drv.com...&cropmode=none

https://sei6bq-sn3301.files.1drv.com...&cropmode=none

https://sui6bq-sn3301.files.1drv.com...&cropmode=none

deja vu Aug 9, 2017 11:51 AM

Construction update photos, from Monday, August 7:

https://gdrpya-sn3301.files.1drv.com...&cropmode=none

https://fnrpya-sn3301.files.1drv.com...&cropmode=none

https://gtrpya-sn3301.files.1drv.com...&cropmode=none

https://f9rpya-sn3301.files.1drv.com...&cropmode=none

https://gnrpya-sn3301.files.1drv.com...&cropmode=none

https://ddrpya-sn3301.files.1drv.com...&cropmode=none

https://dtrpya-sn3301.files.1drv.com...&cropmode=none

https://5jhtyq-sn3301.files.1drv.com...&cropmode=none

deja vu Sep 13, 2017 8:45 PM

Much progress has been made in the past 5 weeks at The Exchange site. The weather was great yesterday and I took some photos.

On the eastern half (closer to The Kalamazoo Building), the core has grown a bit taller, probably about 30 feet high now. This will house two elevator shafts and a stairwell). The beginnings of the parking ramp entrance off of Michigan Ave can also be seen. Lots of electrical utility work is happening on the back side. The alley has been closed off again. Workers have begun laying down moisture barriers for the ground floor slab.

On the western half of the site (closer to Rose St), construction has ramped up. Excavation is mostly done, and foundations are now well underway. Forms and re-steel are starting to go up for the perimeter foundations and columns on the western half of the building - I would expect some big pours happening soon. You can now make out the foundation 'pad' for the west core, which will be smaller and will include a single elevator and another stairwell.

1. View from nearby parking deck:
https://3jf1hq-dm2305.files.1drv.com...&cropmode=none

2. A closer look from above. Can see the start of the parking ramp at the extreme left of the site:
https://3zf1hq-dm2305.files.1drv.com...&cropmode=none

3. Looking south, across Michigan Ave:
https://5dhaea-dm2305.files.1drv.com...&cropmode=none

4. Looking east, across Rose St:
https://5zhaea-dm2305.files.1drv.com...&cropmode=none

5. Looking northeast, along the alley:
https://5jhaea-dm2305.files.1drv.com...&cropmode=none

6. Foundation re-steel and forms along the western edge of the building (paralleling Rose St):
https://6jhaea-dm2305.files.1drv.com...&cropmode=none

7. Foundation pad for the west core:
https://5thaea-dm2305.files.1drv.com...&cropmode=none

8. Looking northeast, at what will be the main ground floor retail area:
https://6zhaea-dm2305.files.1drv.com...&cropmode=none

9. Re-steel silhouette:
https://6thaea-dm2305.files.1drv.com...&cropmode=none

10. Looking north, at what will be the main ground floor retail area:
https://6dhaea-dm2305.files.1drv.com...&cropmode=none

11. The east core:
https://3jhaea-dm2305.files.1drv.com...&cropmode=none

12. Electric Utility:
https://3zhaea-dm2305.files.1drv.com...&cropmode=none

13. Looking west along the alley:
https://5jh7ja-dm2305.files.1drv.com...&cropmode=none

14. Color contrast:
https://5zh7ja-dm2305.files.1drv.com...&cropmode=none

deja vu Oct 10, 2017 11:46 PM

The crane is going up at The Exchange site! :boogy:

I wasn't the only one trying to snap some photos during my lunch break today - a large crane in Kalamazoo is something of a novelty. The best I can figure, the last time a crane of this proportion graced Kzoo's skyline was in the early 1980s, when Skyrise Apartments was under construction. Reagan was president, the internet was coming into existence, the first mobile cell phone call was being made, and CDs were being experimented with.

https://9rptdq-sn3301.files.1drv.com...&cropmode=none

https://pbptdq-sn3301.files.1drv.com...&cropmode=none

https://97ptdq-sn3301.files.1drv.com...&cropmode=none

https://7bptdq-sn3301.files.1drv.com...&cropmode=none

https://9lq4ma-sn3301.files.1drv.com...&cropmode=none

https://7lptdq-sn3301.files.1drv.com...&cropmode=none

https://9bq4ma-sn3301.files.1drv.com...&cropmode=none

https://8rq4ma-sn3301.files.1drv.com...&cropmode=none

https://87q4ma-sn3301.files.1drv.com...&cropmode=none

https://plq4ma-sn3301.files.1drv.com...&cropmode=none

deja vu Oct 19, 2017 1:55 PM

10/18/17 Dusk shots:

https://8rqj9g-sn3301.files.1drv.com...&cropmode=none

https://87qj9g-sn3301.files.1drv.com...&cropmode=none

https://plqj9g-sn3301.files.1drv.com...&cropmode=none

https://97qj9g-sn3301.files.1drv.com...&cropmode=none

https://pbqj9g-sn3301.files.1drv.com...&cropmode=none

https://9rqj9g-sn3301.files.1drv.com...&cropmode=none

https://7bqj9g-sn3301.files.1drv.com...&cropmode=none

https://7lqj9g-sn3301.files.1drv.com...&cropmode=none

deja vu Nov 2, 2017 4:42 PM

Here's a video taken from the top of The Exchange crane, showing the Kalamazoo skyline from 230 feet up:

Video Link

Posted by the City of Kalamazoo

And another by Kent Companies, which is doing the concrete work, shows a mini time-lapse, aerial views, and crane construction:
Video Link


I found both of these on a recent MLive article.

deja vu Nov 2, 2017 4:47 PM

Another recent article provides more detail about the construction process and schedule. The crane can be expected to remain up for at least the next year. Final completion is scheduled for April-June 2019. The article title is a bit of a 'no-duh' - still an interesting read though for those not too familiar with the project.

Quote:

15-story Exchange Building project will proceed floor by floor
By Al Jones | MLive
October 23, 2017

...About two years of work -- in total -- will be necessary to make the mixed-use commercial and residential project a reality, said Gregory A. Taylor, principal of Phoenix Properties LLC. "We're scheduled to complete the project in April to June of 2019," said Taylor, who provided an update on the project to members of the Kalamazoo Rotary Club at noon Monday in downtown Kalamazoo...

deja vu Nov 21, 2017 4:13 AM

Took some photos near dusk today. Construction crews were just starting to place the first few forms for the third floor, while a few others were placing re-steel cages for some of the columns that will span from the second to third floors. It looks like about half the second floor is poured, and the remainder of that floor is soon to be poured.

https://wkve3a-dm2305.files.1drv.com...&cropmode=none

https://wuve3a-dm2305.files.1drv.com...&cropmode=none

https://v0ve3a-dm2305.files.1drv.com...&cropmode=none

https://weve3a-dm2305.files.1drv.com...&cropmode=none

There goes the sun!
https://uku9ya-dm2305.files.1drv.com...&cropmode=none

deja vu Dec 2, 2017 11:26 PM

12/02/2017:

https://ghtwbq-dm2305.files.1drv.com...&cropmode=none

https://gxtwbq-dm2305.files.1drv.com...&cropmode=none

https://ibtwbq-dm2305.files.1drv.com...&cropmode=none

https://hhtwbq-dm2305.files.1drv.com...&cropmode=none

https://irtwbq-dm2305.files.1drv.com...&cropmode=none

https://hxtwbq-dm2305.files.1drv.com...&cropmode=none

https://fbtwbq-dm2305.files.1drv.com...&cropmode=none

https://frtwbq-dm2305.files.1drv.com...&cropmode=none

https://hbsnyw-dm2305.files.1drv.com...&cropmode=none

https://hrsnyw-dm2305.files.1drv.com...&cropmode=none

deja vu Dec 17, 2017 3:59 PM

I was thinking about all the parallels between The Exchange tower and the Warner Building in Grand Rapids. There are a lot of similarities, here's a few I thought of quickly:
  • Both are being built by the same Construction Manager (Orion Construction)
  • Both are 15 stories
  • Both are post-pensioned concrete structures
  • Both have 6 or 7 floors of parking deck topped by Class A office space (The Exchange also has a housing component)
  • Both are approximately 300,000 SF total (290,000 - Warner vs. 335,000 SF - The Exchange)
  • Both broke ground in 2017, within a few months of each other
  • Both will have Chemical Bank as an anchor tenant and both have the potential for restaurant space
  • Both are positioned on tight, corner lots in highly-trafficked pedestrian areas
  • Both are being built on land that served as a surface parking lot for about 50 years
  • Both received Brownfield Redevelopment Tax Credits and numerous other community revitalization grants / incentives
  • Both are the tallest commercial structures currently under construction in their respective cities

Some of this isn't surprising, given that it's the same CM and similar geographic location, but the coincidences are still interesting. Obviously there are differences too - the biggest being that The Exchange has market-rate apartments, and the Warner has a separate 12 story hotel planned for the site directly next door.

Anyway, it should be neat to watch these two rise in tandem.

Warner (taller of the two, in background):
https://sipadw-sn3302.files.1drv.com...&cropmode=none
Image Source: Fox17 News Online

The Exchange:
https://6dfgna.sn2.livefilestore.com...&cropmode=none
Image Source: MLive

deja vu Dec 19, 2017 3:44 AM

I was trying to find if there was a construction cam for this job and instead I found a new website for The Exchange that is up and running but still under construction. This looks like the new official site and I'm guessing they will change the url once the content is further along.

http://1738.bfhosting1.com/

There are some short time lapse videos, but only through July of this year. There's a handy little directory of all the floor plans, and additional exterior renderings that I had not yet seen. Also, it indicates that pricing for the 133 apartment units will be released in summer 2018.

https://u4prpq-dm2305.files.1drv.com...&cropmode=none

https://viprpq-dm2305.files.1drv.com...&cropmode=none

https://uoprpq-dm2305.files.1drv.com...&cropmode=none

https://r4prpq-dm2305.files.1drv.com...&cropmode=none

https://siprpq-dm2305.files.1drv.com...&cropmode=none

https://uyprpq-dm2305.files.1drv.com...&cropmode=none


Source: The Exchange Site

deja vu Jan 11, 2018 3:10 PM

Just a quick one from this morning, taken while I was driving to work. About a foot of snow melted overnight and there is a lot of activity once again. It looks like they are getting relatively close to begin pouring for the third floor:

https://tejnha-dm2305.files.1drv.com...&cropmode=none

deja vu Jan 27, 2018 11:42 PM

Photos from yesterday, 1/26/18. The third floor deck is poured, and a portion of the fourth. You can see the difference in floor-to-floor height between the first two floors and the third, which is the first of the all-parking deck floors:

https://skgp4a-dm2305.files.1drv.com...&cropmode=none

https://suh0aw-dm2305.files.1drv.com...&cropmode=none

https://s0gp4a-dm2305.files.1drv.com...&cropmode=none

https://qegp4a-dm2305.files.1drv.com...&cropmode=none

https://qugp4a-dm2305.files.1drv.com...&cropmode=none

https://seh0aw-dm2305.files.1drv.com...&cropmode=none

https://rkh0aw-dm2305.files.1drv.com...&cropmode=none

https://teh0aw-dm2305.files.1drv.com...&cropmode=none

https://r0h0aw-dm2305.files.1drv.com...&cropmode=none

https://tuh0aw-dm2305.files.1drv.com...&cropmode=none

https://skh0aw-dm2305.files.1drv.com...&cropmode=none

https://s0h0aw-dm2305.files.1drv.com...&cropmode=none

deja vu Mar 1, 2018 1:48 PM

February 27, 2018 - hovering around 60F -
https://sr1fhq-dm2305.files.1drv.com...&cropmode=none

vs. one month ago -
https://seh0aw-dm2305.files.1drv.com...&cropmode=none

deja vu Mar 14, 2018 6:46 PM

Lots of activity on The Exchange site today, with a large concrete pour happening. This will be the fifth level of the building (parking deck). There is also cold-form steel framing going in on the ground floor. Some photos -

https://ul22gg.dm.files.1drv.com/y4m...&cropmode=none

https://t722gg.dm.files.1drv.com/y4m...&cropmode=none

https://tb22gg.dm.files.1drv.com/y4m...&cropmode=none

https://tr22gg.dm.files.1drv.com/y4m...&cropmode=none

https://q722gg.dm.files.1drv.com/y4m...&cropmode=none

https://rl22gg.dm.files.1drv.com/y4m...&cropmode=none

https://s70bdg.dm.files.1drv.com/y4m...&cropmode=none

deja vu Apr 1, 2018 4:29 AM

Took a peek around The Exchange site today, at ground level. No activity on site. Cold and very windy. Forms are being set for what will be the sixth floor (and final parking deck level). We will be reaching the apartment level floors (7 - 15) a little later this Spring.

https://7bprgg.dm.files.1drv.com/y4m...&cropmode=none

CMU going up along the back / south side -
https://9l9i4a.dm.files.1drv.com/y4m...&cropmode=none

https://9b9i4a.dm.files.1drv.com/y4m...&cropmode=none

https://879i4a.dm.files.1drv.com/y4m...&cropmode=none

Glazing is going in window framing on the first and second floors -
https://8r9i4a.dm.files.1drv.com/y4m...&cropmode=none

The mass of this building is becoming more prominent each week -
https://pl9i4a.dm.files.1drv.com/y4m...&cropmode=none

https://pb9i4a.dm.files.1drv.com/y4m...&cropmode=none

deja vu May 7, 2018 9:13 PM

Some updates from yesterday. Partway done with the 7th floor pour. This is where the building transitions from parking ramp to residential.

From the top of the Epic Center ramp -
https://frsgyw.dm.files.1drv.com/y4m...&cropmode=none

From the Haymarket District parking lot - just barely visible peaking above the surrounding buildings, soon to be much more visible -
https://hbtrvg.dm.files.1drv.com/y4m...&cropmode=none

https://hrtrvg.dm.files.1drv.com/y4m...&cropmode=none

https://ghtrvg.dm.files.1drv.com/y4m...&cropmode=none

deja vu May 9, 2018 3:39 PM

edit (deleted - accidentally posted this in the wrong section)

deja vu May 9, 2018 3:50 PM

edit (deleted - accidentally posted this in the wrong section)

deja vu May 26, 2018 12:02 AM

Here is a different view of The Exchange from about 1 week ago. I took this screen shot from the below news story. The video footage is from the top of Peregrine Tower, which is a higher perspective than I can get.

https://gabkxw.dm.files.1drv.com/y4m...&cropmode=none
Source: WWMT

deja vu Jul 3, 2018 11:42 PM

Took this over the weekend. At the moment they are on the 8th / 9th floor. The 8th floor is the first residential floor, and it involves a bit of a transition from the parking deck levels below. It is about 50% total height now.
https://sej8bq.dm.files.1drv.com/y4m...&cropmode=none

deja vu Jul 31, 2018 11:33 PM

I forgot to post these, from July 25 - up to the tenth floor now -

https://gtrgpq.dm.files.1drv.com/y4m...&cropmode=none

https://f9rgpq.dm.files.1drv.com/y4m...&cropmode=none

https://gnrgpq.dm.files.1drv.com/y4m...&cropmode=none

https://dtrgpq.dm.files.1drv.com/y4m...&cropmode=none

https://fdsrya.dm.files.1drv.com/y4m...&cropmode=none

deja vu Aug 25, 2018 7:06 PM

Working on the 12th floor now. Photos from yesterday, 8/24/18.

https://plqhfw.dm.files.1drv.com/y4m...&cropmode=none

https://9rqhfw.dm.files.1drv.com/y4m...&cropmode=none

https://pbqhfw.dm.files.1drv.com/y4m...&cropmode=none

https://97qhfw.dm.files.1drv.com/y4m...&cropmode=none

https://7lqhfw.dm.files.1drv.com/y4m...&cropmode=none

https://7bqhfw.dm.files.1drv.com/y4m...&cropmode=none

https://9l8scw.dm.files.1drv.com/y4m...&cropmode=none

https://9b8scw.dm.files.1drv.com/y4m...&cropmode=none

https://pl8scw.dm.files.1drv.com/y4m...&cropmode=none

https://8r8scw.dm.files.1drv.com/y4m...&cropmode=none

https://878scw.dm.files.1drv.com/y4m...&cropmode=none

Boisebro Aug 25, 2018 7:39 PM

Looking good!

deja vu Aug 26, 2018 1:05 PM

Quote:

Originally Posted by Boisebro (Post 8293755)
Looking good!

Having another tower of this scale does a lot for downtown Kalamazoo's small skyline. I think its position and height make downtown feel far more dense. I only hope we don't have to wait another quarter-century for the next one of similar size.

Boisebro Aug 27, 2018 7:45 PM

Quote:

Originally Posted by deja vu (Post 8294169)
Having another tower of this scale does a lot for downtown Kalamazoo's small skyline. I think its position and height make downtown feel far more dense. I only hope we don't have to wait another quarter-century for the next one of similar size.

agreed -- it's a nice addition and makes a good impact.

I love seeing these projects in smaller cities. even relatively modest projects can make a huge difference.

same is happening in Boise with a ton of infill that would get lost in most larger cities.

deja vu Sep 11, 2018 12:55 PM

From yesterday, 9/10/18 - The Exchange in the distance, 180 E Water St site work in the foreground.