Lots of activity here in April 2025, they've surrounded this with mast climbers, big cutouts into the building envelope, gutting the inside...
|
Out of Ottawa Magazine. Thanks to Pat from Rail Fans for stumbling upon this. Looks like a tear down and rebuild, but the podium seems inspired by the brutalist architecture of the current building.
https://i.postimg.cc/gkW87SM0/Screen...-13-111108.png |
All those Ottawa Magazine rendering seem to come out of no where. Not sure its very accurate
|
Quote:
|
Thanks guys! Not helpful at all. :haha:
|
I went and took a look at lunch after reading the latest posts here and I would be very surprised if this was still a conversion... Demolition Plus seems to be going pretty hard on it
Not in the industry so just basing this off some of the other conversions/reclads I've watched down here which seemed to have a much tamer approach |
Quote:
https://cdn.skyrisecities.com/forum/...15-jpg.646685/ https://ottawa.skyrisecities.com/for...s.38130/page-3 |
Groupe Mach's website shows this as a repositioning project to create new office space. Just thought i would add to the confusion.
https://www.groupemach.com/propriete...or-ottawa.html |
|
So was it ever confirmed somewhere that this was a full demolition and not just an office to residential conversion where the skeleton of the building would stay intact?
|
June 10 2025
Sides are popping off now https://i.imgur.com/mDwHT9Dh.jpeg https://i.imgur.com/mDwHT9D.jpeg Slowly chipping the roof of the mech penthouse https://i.imgur.com/7EDVzJdh.jpeg https://i.imgur.com/7EDVzJd.jpeg |
Looks like the mechanical penthouse has started full demo. Won't be convinced whether this is a conversion or demo until we see what they do with the mains structure.
|
man oh man, once again DemoPlus being right on the edge of safety. Those guys standing on a fully extended scissor lift, chipping at a two or three storey loose block wall from the 60's... You wouldn't catch me up there with a 10 foot pole. All it would take is one small area of old-ass block coming loose, to push the entire lift over the edge of the roof.
|
Quote:
I feel an overwhelming urge to send that photo and the one of all that damned debris on top of Releve to the City of Ottawa. I swear to god everyone who works in construction is a knuckle dragging moron when it comes to safety. Guy I used to work with told me a story about how he flipped a cast iron bathtub out of his trailer while turning left in an intersection and hes laughing about it. Like.. what is wrong with you? You ever see the back of a pickup truck with like 5 levels of scaffold and all its planks and polls and there is a single little yellow rope on one corner? I hate all these people. |
Quote:
https://www.facebook.com/demolitionplus/ https://i.imgur.com/08UADJl.png |
Well thats interesting! So this is no longer an office to residential conversion but a completely new project. This image posted in a magazine earlier might be more accurate then we first thought then. I would not be mad
https://i.postimg.cc/gkW87SM0/Screen...-13-111108.png |
Quote:
|
Six more of the pre-cast panels were removed this morning.
https://i.postimg.cc/d1tBx2yf/110-OC...emolishion.jpg I noticed that this is right beside the parkade that had the issue this past spring. Maybe Demolition-Plus will get a ‘2-fer’. |