I don't have a photo because I go by on the bus but they have started excavation on this lot!
|
Snapped a couple pics from my bus ride...
https://i.ibb.co/bjhhQ2g/20190813-165843.jpg https://i.ibb.co/DGbG5Jd/20190813-165844.jpg |
Drove by this today, they have (finally) started work here. The sales centre is being demolished and a construction trailer is on site.
|
So November was just them moving the sales centre - I’m fairly certain they moved it to their new site in Niagara off the QEW.
The site then went quiet for a while, but in the last week or two some more construction fencing went up and they have started to clean the site up. I think they are preparing to actually start construction this time.. |
And another few months later, a shoring rig is actually on site.
|
I quickly drove by today and saw what might be a dug out basement level with concrete and rebar visible. Looks like something is happening.
|
stopped by today. Hole looks almost done at 2-3 levels down. No crane or any concrete yet.
https://i.imgur.com/UvxHZeb.jpeg |
I guess I saw a glimpse of the future for this building. Thanks for the pic of this hidden construction site.
|
zac-22-023
Quote:
|
The building just west on Barton is 16. Why not.
|
Without having this file, a quick note that the mechanical units may be classified as an additional storey depending on the circumstances.
|
as far as I can tell, this is a 14 storey building as approved and under construction, so it would add 3 storeys.
The adjacent building is indeed 16 storeys, but it's an old building with shorter floor to ceiling heights. This one at the approved 14 storey height was likely a similar height, so the 17 storeys would make this the tallest building in the area. Not like I have any problem with that. What is interesting here is how late they are applying for the increase - a crane is due here any day with excavation largely complete. The additional units are going to need more parking, which likely means an extra level of underground parking.. So LJM if they are going to continue construction here will have to take a risk by building that extra level in advance of getting approval for the height increase. That, or the site will go on hold for a year or two until it can be worked out. |
I wonder if we'll see more of this happening, due to the rapid changes in the market demand and prices.
|
Eh this is a hard one to determine, so I'll update the thread to Proposed instead of U/C. I'm assuming approval is needed first.
[Stoney Creek] LJM Tower | ? | 17 fl | Proposed |
Quote:
|
OK, thanks for letting me know.
|
|
Barton East..around Grays???
sorry, I know there is a thread for this one but I couldnt locate...2000 something Barton E.
Anyway, crane up at this location. Always fascinating to see the very large Liebherr in action and all that goes with it. |
https://skyscraperpage.com/forum/sho...=230897&page=2
This is the thread you are looking for :) Good to see a crane is finally here. Excavation took absolutely forever. |
|