So good to see that vacant lot gone. Hopefully the Cousins and Selig properties are next.
|
A few pics from this morning
https://i.postimg.cc/jjYz9ZS2/temp-Imagej-QVRik.avif https://i.postimg.cc/qqDs5rNH/temp-Imageob-BZn-V.avif This GA Tech housing is kinda looking like it may be a 5 over 1 (6 over 2). https://i.postimg.cc/qMYcckf8/temp-Image-ZEqpuu.avif I post this about every year and well.......why can't the city take this over and just open up the street, especially before World Cup? Also want the "Gulch" entrance be needed or used by Centennial Yards. https://i.postimg.cc/bNdH2Z5y/temp-Image-HTBn-R7.avif |
Quote:
|
What is this going to be on Spring St? Hope it is not a mid-rise or 5 over 1. Seems this should be too valuable property for that.
https://i.postimg.cc/tJpq5G93/temp-Imagea-JAi4-I.avif Peachtree and 6th https://i.postimg.cc/XNk7vqgQ/temp-Imagez9-MFj1.avif Peachtree and 4th https://i.postimg.cc/g0hGb2Jy/temp-Image-V1v-USa.avif https://i.postimg.cc/QCmXYYMR/temp-Image-Azd6-Qf.avif https://i.postimg.cc/TwXfdvLz/temp-Image-Yozq-HY.avif |
Quote:
|
Quote:
|
Quote:
https://i.postimg.cc/HLyrVd63/temp-Image-Mmjd-UP.avif |
Watershed at work.
https://i.postimg.cc/9QS4mrYr/temp-Image4aw-Uc-H.avif Seems like they should have started this in December. Football is just a ¼ away and it looks.........well.......... https://i.postimg.cc/zvtzxcdV/temp-Image-QHt-FDA.avif Not sure if related to 3ed St Ped but more work. https://i.postimg.cc/L4N84JH2/temp-Image-E2-Pn8l.avif https://i.postimg.cc/nzxhr7jc/temp-Image-TRXm-HM.avif |
Quote:
This project would be a multi-modal connection that extends 15th Street from its current end point at West Peachtree Street two blocks west to Williams Street. The entire extension would be implemented on GDOT right-of-way, eliminating the need for costly and time-consuming land acquisition. The proposed roadway design between West Peachtree Street and Spring Street would include a three-lane section consisting of one through lane in each direction and dedicated left-turn lanes approaching Spring Street and West Peachtree Street. The proposed lane section west of Spring Street would consist of a single through lane in each direction. Travel lanes are proposed to be 11-feet wide. Additionally, the new cross-section would consist of 5-foot tree planting/furniture zones, 5-foot sidewalk-level bicycle lanes, and 10-foot sidewalks on both sides of the street. The bicycle lanes would provide a direct connection to the Arts Center MARTA Station and existing and proposed developments as well as other bicycle routes. The construction contract was awarded to the low bidder Reeves Young, LLC on December 8, 2023. NTP was issued on March 18, 2024 with an 18-month contract duration for construction to be substantially complete by September 9, 2025. |
15th St extension is scheduled to begin work this month.
|
Wow! They aren't playing to get projects done for the World Cup. That extension is going to be nice.
|
Quote:
https://i.postimg.cc/htFH41Gp/temp-Image-IYR9-IA.avif |
|
Modera Parkside update by Build Atlanta
|
They are going to have to mine right through a rock outcropping to get it the last block to Williams. I wonder if the people planning this even know— or if their decision would change if they did. It's huge. Could build a mini-park around it instead. And the cost for mining it has to be enormous.
https://uploads.disquscdn.com/images...a20971fc36.jpg https://uploads.disquscdn.com/images...756b7d1185.jpg |
Do they plan to extend it all the way down? I don't see a need unless they were capping the interstate.
|