Took pops to the hockey game yesterday afternoon.
Both times we went by The Bay/ESQ 104st LRT entrances they had 2-3 people actively smoking meth and totally blocking the stairs. Single ladies were seeing this and turning away looking for another option. This continues to be FAR too regular, without consequence or reprieve and continues to push regular folks away from using LRT. |
^ Do we have recall legislation here in Edmonton?
Time to remove some of city council starting with the mayor. |
Quote:
|
Quote:
|
Quote:
Even though there are security people who are "patrolling" the LRT stations, I don't recall ever seeing them doing anything about it. I honestly can't say I blame them, considering the low pay and the recent stabbings at the library and the security guard who was recently murdered in a downtown parkade. There needs to be Peace Officers, who are professionally trained, not minimum wage private security. |
Quote:
Firstly, the mayor and city council needs to be fired. They have done not a single right thing in their term. This is the worst city council, mayor, and state of city that I’ve seen in my twenty years of living here. As a tax paying Edmontonian, I ask for only two things from city council: safety and cleanliness. They have failed very badly in two simple areas. |
Quote:
|
Quote:
This lies with Chief McFee - he can direct his officers to start cracking down on that more, Sohi and Councillors have no authority in that space. If you want to point fingers, point them at the Chief. |
^ The Mayor and council are ultimately responsible for the safely and security of the citizens of Edmonton. The police is a tool for them to enforce that responsibility.
|
City names preferred bidder for Capital Line South LRT construction
April 2, 2024 The City of Edmonton has selected its preferred bidder to design and build Phase 1 of the Capital Line South Extension from Century Park to just north of Ellerslie Road. The preferred bidder is Capital Line Design-Builders, consisting of team members Ledcor and AECOM. The City will now enter into negotiations with Capital Line Design-Builders with the goal of awarding the contract by the end of May 2024. Construction of the 4.5-kilometre extension is scheduled to begin later this year. Construction is expected to take four to five years, followed by testing and commissioning. “We’d like to thank the bidding teams for participating in our procurement. We’re confident our fair and rigorous competitive process will ensure Phase 1 of the Capital Line South Extension will result in excellent value for Edmontonians and further strengthen our mass transit network,” said Bruce Ferguson, Branch Manager of LRT Expansion and Renewal with the City of Edmonton. The City launched its Capital Line South procurement process in June 2022 and shortlisted two bidders in March 2023. Both bidders provided technical submissions, including draft designs and plans, to demonstrate their ability to meet the City’s rigorous technical requirements. Both bidders passed and were invited to submit a financial proposal. The City evaluated these proposals to ensure they met financial requirements, and the team with the highest combined technical and financial score was selected as the preferred bidder. Transformational infrastructure projects like Capital Line South play a key role in strengthening our economy and expanding sustainable travel options for Edmontonians. An economic assessment of the project estimates construction will generate $330 million in wages in Alberta and another $100 million throughout the country. The project is expected to generate 3,700 jobs in the province and another 1,700 across Canada. The $1.1-billion project has funding commitments from the Government of Canada, the Government of Alberta and the City of Edmonton. For more information: edmonton.ca/projects_plans/transit/capital-line-south Media contact: Jyllian Park Communications Advisor Integrated Infrastructure Services 780-554-9001 |
Police and peace officer presence at Churchill and Coliseum when I took transit today.
|
Quote:
Basically had commandeered any flat surface around the the SW LRT portal. Good luck anyone coming out or wanting to go down. Getting rather brazen. |
Quote:
The Edmonton Police Commission has more power in that regard than Mayor and Council. |
It is so easy to make Edmonton's LRT safe again:
Employ more train conductors accompanied by transit policemen to make more random checks on train station platforms (paid zones) as well as inside trains. Those who are caught flouting the law/rules should be locked up. This would definitely encourage many of the homeless and dangerous people to stay away. I guess our enforcement officers are pretty lazy because those on top don't care much. Honestly, for those transit commuters, how often do you see the presence of law enforcers and ticket checkers while travelling? |
^locking up fare evaders? How is that a good use of resources or public $?
How about hours and hours community service for offenders. |
Bad Designers Create Poor Design
https://www.cbc.ca/news/canada/edmon...ving-1.7168981
I'm sure everyone's seen by now the ample reporting on the abominable design provided for the downtown slow tram. Above all it's not quite astonishing that Salvador and Stevenson are each "qualified" urban planners who are equally surprised at the literal and figurative collision of train-car-bicycle-pedestrian pathways destined to dominate downtown traffic casualty statistics. "These numbers are surprising," says Coun. Anne Stevenson, who represents Ward O-day'min, where the intersection is located. No, they're not surprising. Walk around downtown and Oliver for a few hours a day. Watch the confusion created by a patchwork of four-way stops, scramble intersections, construction obstacles, cyclists on the sidewalks, motorists hurrying through construction zones at unsafe speeds, random crosswalk barricades, and what have you. Does *anybody* on City Council or in the planning department live downtown? I still get an askance chuckle when I ask random passersby what they think of a slow-rolling tramway straight down the middle of 104 Avenue. "You're an idiot if you think they'd ever do that," proclaimed one senior as she glared at me from behind the controls of a walker. I simply shrugged and grinned like an idiot. |
^ha.
It's a bit of a mess, but really comes down to a lack of attention by drivers. |
Quote:
|
Quote:
|
Stony Plain Road Bridge Update - mBertan on SRC
https://cdn.skyrisecities.com/forum/...0-jpeg.557843/ https://edmonton.skyrisecities.com/f...24534/page-468 |
All times are GMT. The time now is 7:45 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.