![]() |
It's interesting, that of the 3 residential supertalls Extell is moving forward with, this seems to be the first that would get out of the ground (both 655 and 871 Madison are Non-ULURP), but the Columbus Avenue supertlall is as-of-right. Hard to say what moves first, even with financing.
https://a4.pbase.com/o12/06/102706/1...02WVVeN.d4.jpg https://a4.pbase.com/o12/06/102706/1...xPsFXLk.d5.jpg https://a4.pbase.com/o12/06/102706/1...SRidRpK.d6.jpg https://a4.pbase.com/o12/06/102706/1...MpX2Cq.d6b.jpg https://a4.pbase.com/o12/06/102706/1...vSlbGJO.d1.jpg https://a4.pbase.com/o12/06/102706/1...1qixxO1.d2.jpg https://a4.pbase.com/o12/06/102706/1...DyRWqxP.d3.jpg |
First filings for the expanded tower, with only about 64,000 sf accounted for. The result is a lowrise structure, that will be updated as filings go to give us the full scope of the planned tower.
https://a4.pbase.com/o12/06/102706/1...kQ9cItf.d2.jpg However, the footprint matches what will eventually be the full tower. https://a4.pbase.com/o12/06/102706/1...rRFl2KC.d1.jpg https://a4.pbase.com/o12/06/102706/1...28sSq9p.d8.jpg |
|
The Capital of the World!!!
|
| All times are GMT. The time now is 2:42 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.