![]() |
Site plan has been submitted. Anyone know how sales are going for this?
|
odd. They filed a site plan last year as well, and appear to have just filed a new application for some reason (?). Wonder what the storey is there.
I was hoping this would be starting construction in the next few months to be honest, not looking like that if they are just filing a new site plan application. |
With this one at 26 floors at the top of a high point of main street does anyone know how high it will peak on the skyline ? Probably as tall or taller than platinum
|
Quote:
Like most projects downtown, they are all scraping the escarpment height limit. Because of the hill here, that just means 23 storeys instead of 30 storeys closer to Gore Park. A few projects will peak out above the limit - 75 James and Television City are both about 50 feet above the limit. |
Hard to see, and I don't know if this is a change but it's been so long since there's been movement. There is a work trailer on site. Has this been posted about before? Apologies for the trash photo.
https://i.imgur.com/yh3KjSEh.jpeg |
Been there for months
|
Quote:
|
Still no permits here either so I'm not expecting any movement soon. We'll have to see.
|
We drove by here yesterday, and a couple white hats were on site looking over things. Part of the big Apex hoarding is actually a gate and it was wide open. I saw lots of equipment on site and a temporary construction office trailer and what looked like some crane pieces and materials. Not sure if this is all for this site or if it's being used as a staging area for another site?
|
They've got some fresh advertising at York and Park Street in place of that Judy Marsales Sold on Hamilton billboard.
|
| All times are GMT. The time now is 4:41 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.