The tunnel entrance is taking shape in the heart of Quebec City. Starting in mid-November, work on the René-Lévesque portal will reach a new milestone. This key piece of infrastructure will allow the tramway to transition from its surface-level route into the tunnel. The work will take place at the existing construction site on Boulevard René-Lévesque Est, between Avenue Turnbull and Rue de l’Amérique-Française.
The decision about where LRT needs to be above ground vs under ground is often ass backwards in Canada. When PT is the priority, you put it above ground in the city centre where passengers can see the places they want to go and pedestrians can see a train coming. On low density stroads with far less of interest, you tunnel. That so many Canadian municipalities do the opposite speaks to how car centric the culture still is. They design LRT with cars being the priority. Build it so cars can have the most space possible.
This car centric Doug Ford mindset is frustrating in a country trying to urbanize and build walkable people first cities: building rail to free up more space for cars instead of building rail to get people OUT of their cars. Toronto did the same dumb thing with the Eglinton Crosstown. Building LRT projects where quick easy car commutes shouldn't be the rationale.
Chapter 13: Concluding thoughts
22:43 So the ION LRT is definitely not perfect. I didn’t expect it to be. But it is genuinely frustrating how much better it is than the LRTs in Toronto,
22:52 Nevermind the crappy BRTs that have been built all over Ontario. Cities across Canada need to pay attention to what’s happening KW.
23:00 They should look at this LRT, And the great improvements around it, And they should say, let’s build something exactly like that.