Winnipeg Construction XI


I suspect there is less genuine interest in what is happening in other cities/provinces than there is in slagging off someone else's home town/province with derogatory comments. Second only to the petty sniping is the "look how smart I am for leaving that place" boast by ex-residents. Sorry for the negative comments, but I've seen so much of that malarkey I currently stick to looking at posts about my home town.
 
On another topic, I'm looking for information related to accessibility standards. Specifically for schools or school divisions.

The school div refers to the AMA. The AMA refers to the building code. The building code is very large and not 100% clear, or not easy to find clear answers.

Is there a resource, cheat sheet, or something else to help with that? I'm looking for information on things like "what must the school do to meet accessibility regulations". "what is the max gradient for areas to meet accessibility standards", etc. Of all the resources, links, etc that are available it is very generic and hard to find actually information on what needs to be done.

For context, my kids school has done some things that are against what it means to be accommodating for people with accessibility needs. Ie: they put in a temp classroom right in front of the access gate to the school yard, where my kid goes to lineup, etc. The slope is so steep my kid goes skiing everyday with his walker. it's bloody ridiculous. The accessible parking spaces might as well be on the moon. So we just struggle along with all the other kids.

Got my assistant to put together a pdf to help you with specifics of what part of the code to reference etc.

Available below at a temp files hare site (expires in 3 days):
https://temp.sh/lgbYD/Manitoba_School_Accessibility_Guide.pdf
 
Wow that is fantastic cheswick. Thank you so much!

I'll need to spend some time (later tonight when off work i guess haha) to dig in.

I'll admit I need to use AI type systems more than I do. I'm assuming your assistant used co pilot or some other ai software to get that pulled together so quickly! either way, great work! kudos to both of you, thanks again.
 
WINNIPEG sign set to get a glow up
Letters to be temporarily removed at the end of November for refurbishment
November 18, 2026

IMG-CSC-Winnipeg-Sign-Dawn-808x454.jpg


After being the backdrop of countless selfies, tourist photos, and memorable moments, the WINNIPEG sign is getting a makeover.

The massive 53-foot-wide sign at the Forks will be removed at the end of the month for refurbishment.

Installed nearly 10 years ago as a legacy piece of the Canada Summer Games, the sign has since become a proud symbol of our city.

A refreshed look
Each of the eight-foot-tall letters will be sandblasted and repainted. They will also get an anti-graffiti protective treatment.

When the sign is reinstalled, it will also shine brighter with new LED lighting.

The work is expected to take a few months. It’s anticipated the sign will be back and camera-ready before summer.

Don’t wait to snap your photos
You have until November 30 to get a photo with the sign before it goes into winter hibernation.

We know the community appreciates when the sign is lit up for meaningful days and special occasions.

While the sign is away, organizations can continue submitting their lighting requests for us to illuminate the Esplanade Riel.
City of Winnipeg
 
In terms of accessibility standards like slopes, etc what I have seen is Canada is far behind the USA. I think part of that is there accessibility laws are in part driven by accommodating their military veterans and almost makes accessibility a pseudo extension of the military. The Americans with Disabilities Act (ADA) and its supporting documents may be something you need to reference and then adapt with local building codes here. The good news is Manitoba now has a Minister of Accessibility.
 
In terms of the the plan to add 2000+ units to end homelessness and help battle addictions. I like the intent but seriously wonder if the current plan to concentrate these units around Portage and Memorial has been thought through. Hopefully I am wrong but this could have a permanent cooling effect on overall downtown development.
 

Sea Bears teaming up with Winnipeg School Division on plan for new home court, rec facilities in West End​

New community facility with six indoor courts, and additional connected venue with a roughly 5,000-seat capacity proposed facilities would be located on six hectares owned by the Winnipeg School Division near Technical Vocational High School (TVHS), along Wall Street and extending to Wellington Avenue

https://www.cbc.ca/news/canada/manitoba/sea-bears-home-court-proposal-9.7426783
 

Sea Bears teaming up with Winnipeg School Division on plan for new home court, rec facilities in West End​

New community facility with six indoor courts, and additional connected venue with a roughly 5,000-seat capacity proposed facilities would be located on six hectares owned by the Winnipeg School Division near Technical Vocational High School (TVHS), along Wall Street and extending to Wellington Avenue

https://www.cbc.ca/news/canada/manitoba/sea-bears-home-court-proposal-9.7426783
The mayor's comment made me chukle, it's nice to dream but really, how are you going to pay for it?

In a statement to CBC News, Winnipeg Mayor Scott Gillingham called the project a "really interesting concept."

"I look forward to learning more about the proposed details, timelines and financing from Mr. Asper and the Winnipeg School Division," his statement said.

I hope they succeeded!
 
Another thing I noticed with the update is session persistence, basically if you open a thread it takes you back to where you left off.. no more putting you on page one. Little quality of life things like that are a welcome addition to this site.
 
Bird recently completed a three-level, 112,000 sq. ft. precast concrete parkade for the Reh-Fit Centre, adding 300 parking stalls to support the Centre's potential expansion while keeping operations running for members throughout construction.

Delivered by our Winnipeg district, the project involved the installation of 234 precast concrete pieces and brought together expertise in self-perform concrete, BIM/VDC coordination, and multidisciplinary planning. Features include accessible parking, an elevator, enclosed stair towers, emergency call stations, and integrated security infrastructure.

QUIKBfS.jpeg


roSlLD2.jpeg


hxdRFDl.jpeg


fN8adL8.jpeg

Bird Construction
 
You're half right. We've been down the road numerous times, you're wrong about the consensus, its always been majority yes.

​

Aug 2010 60% in favour of separation:​

http://forum.skyscraperpage.com/showthread.php?t=184481​

​

Mar 2013 58% in favour of some form of separation:​

http://forum.skyscraperpage.com/showthread.php?t=204407​

​

Jan 2016 57% in favour of separation:​

http://forum.skyscraperpage.com/showthread.php?t=220735​


Oct 2018 82% in favour of seperate Winnipeg section
https://skyscraperpage.com/forum/threads/winnipeg-sub-thread.236366/
Ah, you're right.

I guess my bias is showing. Most likely at one point, I may have said yes back in the day. 🤷‍♂️
 
Sea Bears games are great downtown, not a fan of moving them at all.

I tend to agree - but CLC has a ton of events as it is, and getting a new more appropriate sized venue is an opportunity that should be pursued.

This is a type of facility that has far more community benefits (for both pro and amateur sports) as compared to keeping a minor pro level basketball team playing in a facility that is probably 3x bigger than their needs.
 
Transcona development proposes grocery store, indoor amusement space near Costco
Joyanne Pursaga
Thursday, Nov. 19, 2026

4732047_web1_Phase-2-Elevations-3.jpg

SHINDICO RENDERING

Renderings of the proposed Peguis Promenade in Transcona include a new grocery store and an indoor family amusement centre.


A new development aims to add nearly 74,000 square feet of commercial space at Reenders Drive in Transcona, including a large grocery with an indoor amusement area.

The second phase of Shindico Realty’s Peguis Promenade development would be built near Kildonan Place mall and a Costco warehouse, with a 12,000-square-foot “family amusement space” operated by a 36,000-square-foot grocery store.

“These things… are desperately needed and this, I’m sure, would be a nice amenity for the neighbourhood,” said Justin Zarnowski, general counsel for Shindico, during an East Kildonan-Transcona community committee meeting Wednesday.

Locating a grocery store quite close to a popular, big box store that also sells food is a better fit than some shoppers might immediately realize, he said.

“A lot of people say, ‘Why would you put a grocery store right next to the Costco?’ It actually is a really appealing thing for them to (go there). Not everybody needs four litres of mayonnaise, so this is a really good cross-use and our proposed tenant here is really excited,” said Zarnowski.

The names of businesses that could go into the property at the northwest corner of Reenders Drive and Peguis Street were not disclosed because agreements have not been finalized.

The first phase of the broader development is already underway, which will add a strip mall.

If all city approvals are granted, construction on the Phase 2 commercial space could start next spring, Zarnowski said.

The proposal also calls for six restaurants.

The community committee cast a final vote in favour of the plan Wednesday, though city officials must also consider a variance related to the project for it to move forward.

In a third phase, Shindico plans to propose a multi-family residential development for the west side of the property.

“We do think it’s the right fit. It fits in the malls and corridors (plan) that the mayor has been supporting,” said Zarnowski.

Mayor Scott Gillingham has sought ways to attract more housing construction near malls and major transportation corridors over the past few years.

The developer told city councillors some residents raised concerns the development could increase traffic.

However, Shindico already widened and extended a section of Reenders in 2015 to proactively help alleviate the development’s impact, he said.

The company planned to transform the site for many years, with an earlier proposal to add big-box stores eventually ruled out.

“We did make an effort here to make sure that the commercial traffic was off of the residential roads, that we were having a commercial space here that’s appropriate for the neighbourhood, which is a regional shopping centre,” said Zarnowski.

An active transportation path at the site should also encourage walking and biking, he said.

Transcona Coun. Lora Meseman said some residents have expressed traffic concerns about the busy area.

She thanked the developer for expanding Reenders but plans to ask public works staff to explore additional steps to reduce congestion and increase safety.

“We’ve got so many new homes in that community, which is great, but it just causes extra backlog of traffic,” said Meseman.

She would like city staff to confirm a new traffic light will be installed at Reenders Drive and Rougeau Road, noting other improvements may be needed to address traffic issues that aren’t related to Shindico’s development.

“There’s probably more that can be done. So, I think, overall, I just would like to look at this (area). What makes sense to make this a little bit more efficient?” said Meseman.

She expects the development will add some welcome amenities for residents, including a grocery store within walking distance of many homes.

winnipegfreepress.com
 
They've been doing utility works recently. Interesting concept about a grocery store operating a kid city type place. Not sure we need another kid jungle gym lol but seems there is quite the market apparently.
 


Back
Top