[Moncton] Vision Lands | Dense Mixed Use Neighbourhood | up to 16 storeys | Proposed


the moncton industrial park purchased 145 acres north of the tch between mapleton and mclaughlan, at one point i was shown a plan but can't seem to find it, but the plan included a new industrial park that will connect Queensway to Granite. That would alleviate some of the pressure for the elmwood exit if it ever gets built

You're right! I forgot about that.

I'm sure MID considers this a land bank however. It is land being held for future development, decades in the future.

Right now, they have just opened the Harrisville Logistics Park for development. There is a major expansion planned for the MID West Industrial Park. These alone will likely require 20 years or so to build out. It will be a long, long time before we see any MID activity north of the TCH.
 
I didn't post on this earlier, but city council held a public hearing regarding the Vision Lands secondary plan last week and subsequently gave final approval to the plan.

What does this mean for the Vision Lands project?

In the short term - diddly squat.

The plan remains largely aspirational and large sums of money will need to be marshalled (with federal and provincial support) before basic infrastructure is built which would allow the development of the Vision Lands to proceed.
 
Driving the length of the "arterial":

53bb54ab9044b415c4718daec4ce3aa0.gif


Giving Larry Uteck vibes.
 
The city has this document of their road infrastructure budget for The Vision Lands in the public notice this month



Link: https://www5.moncton.ca/docs/pac/PAC/Nov_25_2026/6a_Development_Charge_By_Law.pdf

Very interesting.

The city seems to be very serious about development of the Vision Lands. For the last 20 years, the interest has only been aspirational. Npw they are getting down to brass tacks and developing a framework for calculating area development charges. These charges will be applied to major required infrastructure including arterial streets.

Required infrastructure:

• Halls Creek North Branch Bridge
• Road over Halls Creek North Branch Bridge
• Trail Connections
• Roundabouts• East-West Arterial (Crowley roundabout toWheeler)

Total capital cost: $47.56M (to be recovered through ADC)

Required infrastructure: (Vision Lands West)

• Collector Road (Louis-J.-Robichaud to HallsCreek Western Roundabout)
• East-West arterial (from Halls Creek toCrowley Farm Roundabout)
• Collector urban street in downtown• Louis-J.-Robichaud Bridge
• Roundabouts, bus stops and other minorinfrastructure•

Total capital cost: $59.62M (to berecovered through ADC)

Required infrastructure (Vision Lands East)

:• Collector Road (Léopold-F.-Belliveauto Crowley Farm Roundabout
)• Roundabouts

Total capital cost: $8.41M (to berecovered through ADC)

Total required infrastructure cost ~ $110M
 
Last edited:
The city has this document of their road infrastructure budget for The Vision Lands in the public notice this month



Link: https://www5.moncton.ca/docs/pac/PAC/Nov_25_2026/6a_Development_Charge_By_Law.pdf
This is awesome!

but....From what I understand, a large number of homeless people are living in the area where the Vision Lands development is planned. I wonder how the city plans to address this?

It could be a tough sell in the early stages if the homeless encampments in that area haven't been addressed. I've heard the number of people living there has reached over 500 at times.

Imagine being one of the first residents to move into the area, only to find yourself constantly dealing with petty crime and other issues. That's certainly not going to help attract new residents.
 


Back
Top