Winnipeg | Perimeter Highway


He zoomed in on the wrong rail crossing though. It wasn't the CP Keewatin line (which goes under the Perimeter). It was the CN line just north of the 15/115. That was the level crossing where he had to wait.

Ouch. Of note with all the relocation talk, does the plan cover the yards? I think that if the plan fails to relocate the yards, then there's little to no point in relocating the main lines.
 
What would it realistically cost to upgrade Wilkes and Rosser with these extended ramps? $20 mil?

These a low hanging fruit projects that should have been lumped into the upgrades to the service roads when they eliminated access points.

Massive low hanging fruit.
 
Ouch. Of note with all the relocation talk, does the plan cover the yards? I think that if the plan fails to relocate the yards, then there's little to no point in relocating the main lines.

No. There would still be a crossing of the Perimeter in all these cases. The current study first shiny thingy is the southern rail bypass for through trains. Which still would need a yard somewhere to stop.
 
Like this?

AP1GczNORb42R-gBP83v4gPkpevLW5-vvPPabPfgM8622R07I1v92_ArHN68n8Qowpm9-uPVoQJkFW3-SMZNFibabNv3ImKwqtqEoKorKOh2Jf3YNvw_MaNBaFA0PEQ0XJjS65VMVymgEyCeWKGMx78T8m47=w1242-h881-s-no-gm

I wonder what’s taking them so long to connect that service road over the tracks. It just dead ends at Wilkes and the road on the other side get ends before the track… pretty sure it’s what’s keeping open the Caron road access to the perimeter.
 
I was by the McGilivray site and they were driving piles for the new bridge. Lots of them. Also can clearly see the new road alignment as there's lots of gravel been placed. Moving along decently.
 
I was by the McGilivray site and they were driving piles for the new bridge. Lots of them. Also can clearly see the new road alignment as there's lots of gravel been placed. Moving along decently.

The railway is so fussy.

That is so exciting. I can’t wait until this new interchange gets built. I’m assuming they’re going to build the structure right through the winter.

St Anne’s rd interchange needs to start soon it’s desperately needed.
 
I wonder if it includes realignment of the highway at the curve near Murdoch Rd. and the general widening scenarios outlined in the functional design.

Is this on merx or to prequals only?
 
Last edited:
The Government of Manitoba, as represented by the Minister of Transportation and Infrastructure issues this Request for Services (“RFS”) to Pre-Qualified Suppliers for a Detailed Design Study for Reconstruction of PTH 100, from East of PTH 59S (Lagimodiere Blvd) to South of PTH 1E (Fermor Ave) and North Service Road, from Symington Rd to Murdock Rd, the “the Project”.

Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
 
I havent really paid attention before. But for pre-qual suppliers i didnt think they released the documents publically. So I;'d expect nothing to come to merx even though it says so.
 