Northern New-Brunswick Construction Thread


New mine, new bombs, new Tim’s, we are on a roll!!!!!

Now, add the torpedo plant, the navy forward base and lets gooo economic development in the north!!!!

There is of course a few hurdles to go through but hopefully this all comes to fruition


Up to 1000 jobs at full operation...above the spin off jobs. This will bring nothern NB back to the days of mill and mines.
 
Apparently ~ a $2B investment and up to 1000 jobs..

And, there are still rumblings about a torpedo facility as part of the order for 12 German/Norwegian submarines.

Belledune is on a roll.
 
Happy to see this moving forward. While I'd prefer we didn't need to build munitions at such scale, the world has gotten a lot less peaceful over the last 5 years, and you have to be prepared for that. This is also great because it's economic diversification. It isn't tied to the success or struggle of our traditional forestry, fishing, or mining industries. It could also be an opportunity to increase our non-US exports by shipping munitions to Europe and elsewhere.
 
Update on the new siding in Grand Falls. Google maps had updated and you can see the progress.

wc9Gk2S.jpg
 
Work on the Wild Wing Roadhouse at Bathurst Mall has slowed down. A crew was in and demolished the interior of the units and has been quiet now for over a week. I wonder what gives?
 
From Retail Talk NB "Bathurst- The Sacred Heart Cathedral in downtown Bathurst is being closed due to over 2 million dollars in critical repairs to make the building safe.
The last mass will be in October and then after the plan is to demolish the building. The Cathedral will see its new home at Our Lady of the Holy Rosary Catholic Church."

This saddens me, its one of the most dominant structures in the entire downtown core. You can see this church from any point in the downtown area.
 
:previous:

This is insane. Have they explored the idea of a community wide fundraising effort to fund the necessary repairs? If the building is iconic, then I think regardless of religious denomination, people would contribute. Look at how people in France rallied to save Notre Dame Cathedral after the fire!
 
:previous:

This is insane. Have they explored the idea of a community wide fundraising effort to fund the necessary repairs? If the building is iconic, then I think regardless of religious denomination, people would contribute. Look at how people in France rallied to save Notre Dame Cathedral after the fire!

There are just so many churches across the country with dwindling congretations and thus a decreasing ability to maintain these massive buildings.

We'll probably end up decades from now with a select few more prominent churches saved for historical and architectural reasons like Notre-Dame-de-Paris, and especially in larger centres where alternative usages can be found, but smaller towns and cities like Bathurst may have a hard time to come up with enough financial community support to save them all. Unfortunately, probably more to come.
 
CCD Canada has a 47.8 millions dollars project card called Bathurst Smurfit Stone redevelopment, this would be a substantial investment but have no details since i’m not a subscriber. This could change the downtown dynamics and put much needed life in the downtown core.
 
CCD Canada has a 47.8 millions dollars project card called Bathurst Smurfit Stone redevelopment, this would be a substantial investment but have no details since i’m not a subscriber. This could change the downtown dynamics and put much needed life in the downtown core.

Would that be for the continued infrastructure? They added water this year but haven't done waste water or electrical yet
 
Two listings on CCD Canada today for Miramichi!

MIXED-USE RESIDENTIAL BUILDING, MIRAMICHI - MIRAMICHI, NB
NEW MIXED-USE RESIDENTIAL BUILDING

Starting Date (estimated): N/A
Location: MIRAMICHI (NB)
Size: $11,960,000.00
Stage: 3-Planning or drawing
Published: 2026-10-14
Last Update: 2026-10-14

Work type: New construction
Sector: Private
Category: 4-Residential
Subcategorie: 4B-Residential Development
Disciplines: Architecture, Civil, Electricity, Equipment, HVAC, Building mechanic, Structural, Other

DESCRIPTION:
NEW MIXED-USE RESIDENTIAL BUILDING

Located in Miramichi, Tupsi Dr., this project estimated at $11 960 000 is in the planning stage. Based on a surface spread over 5 floors, works concern the construction of a building housing dwelling units and providing space for commercial use.

Consultant: INFORMATION AVAILABLE TO SUBSCRIBERS

TRU HOTEL BY HILTON, MIRAMICHI - MIRAMICHI, NB
NEW HOTEL BUILDING

Starting Date (estimated): N/A
Location: MIRAMICHI (NB)
Size: $11,260,000.00
Stage: 3-Planning or drawing
Published: 2026-10-14
Last Update: 2026-10-14

Work type: New construction
Sector: Private
Category: 2-Commercial
Subcategorie: 2E-Hotel & Lodging
Disciplines: Architecture, Electricity, Equipment, HVAC, Building mechanic, Structural, Other

DESCRIPTION:
NEW HOTEL BUILDING

Located in Miramichi, Tupsi Dr., this project (Tru Hotel by Hilton*) estimated at $11 260 000 is in the planning stage. Works concern the construction of a lodging building providing over 98 suites.

Consultant: INFORMATION AVAILABLE TO SUBSCRIBERS

I believe these projects will be part of the same development as the nearly completed multipurpose recreational centre.
 
Miramichi Transit will be replaced by Flexgo in the new year. According to surveys, the current model did not suit the needs of Miramichi and they will be part of the flexgo program along with Edmundston, Bathurst, Grand Falls… soon to follow, Campbellton and Belle-Baie.
 
Jiffy Lube has confirmed they are the banner opening up besides Nissan in Bathurst, they have opened a Facebook page confirming the same.
 


Back
Top