The warm weather let several projects catch up on paving. I just learned another thing about my photo editor. When switching from the internal format to a websafe format the photos get darker in the conversion. I've noticed before that they look darker than when I was editing them. Another thing to figure out how to fix. Also a time limit for post edits in this new forum software otherwise I would have added that photo editor comment to my previous post.
Explore Regina SK Construction’s 11,446 photos on Flickr!
www.flickr.com
Coopertown paving finished. Last of the sidewalks poured and covered with insulated tarps. Street light poles getting installed. Some yellow gas pipe rolled out. Still 2 short roads to be built on either side of the first small park next year.
Moving lots of dirt around. Started digging out dirt from where the first large park will go.
Rosewood paving was mostly done Friday, just a final layer to do on Mapleford which they might do today.
Old stormwater pond filled in over the past few weeks. On FB someone mentioned Broadstreet is building apartments there.
Crestview building starting to go up.
McDonalds nearly done.
Temporary Eastgate bridge gone. Walls were stacked further over on Eastgate Drive.
Piles for the Value Village. Making a big pile of base for roads / building pads.
Did a little more paving at the Costco. Yesterday poured the first concrete under the gas station canopy. They removed a bunch of road base from the area beside the gas station. Maybe it would get rutted up without pavement. I think the entire floor inside has been poured. 3 big heaters behind the building.
Two 3 storey 18 unit Avana projects started in Westerra. And the second Metis building.
Grasslands project moving fast.
Working on 5th floor of LTC. Just need to move the forms up one more time to do the roof.
Ongoing pile work at the Aquatic Centre.
New cattle barn covered. It doesn't look like they'll use it this year. They made an aisle passing through it to the old building from the parking lot corral. The old building was also insulated when they extended it.
Just over a week ago the Grand Coulee truckstop was paved except for the A&W drive through and parking lot beside the building. It was far too windy to be flying that day. Flying back the drone could only do 2 km/h.
Work finished on new outlet into the lake.
Some first floor concrete poured at Douglas Park project.