AUSTIN | Transportation Updates


Project Connect is not limited in scope. Project Connect does not end at 35th street. Project Connect is the perpetual expansion of urban rail whose 1st phase goes from Oltorf/35th to 71. While that phase is in construction, prep work will begin on the extensions. No great urban rail system was built all at once at the same time.

The current plan goal is Slaughter in the South and Tech Ridge in the north.

I'm aware of the overall plan along with the priority extensions. However I think they made a huge mistake in not pushing the northern terminus of the initial segment up to at least Crestview. I understand that NLTC would have required state/TXDOT cooperation, so they can be forgiven for not going that far.

Even when construction begins, they can't just tack the priority extensions on the end even if funding was available. Those portions weren't included on the EIS, so they still need to go through NEPA.

Assuming we manage to get through the lawsuits and also get federal funding, we'll still need to pass bonds to complete the priority extensions. There's some hope that the airport will be able to find money to at least partially construct the airport segment - this seems a little optimistic but that still leaves a bond to fund the segment to Crestview (and to grade separate the Red Line). That probably means a bond election a minimum of 4 to 6 years from now. Then after that there's a 2 year NEPA process. Then we beg and wait for federal funding.

I'm an extreme transit optimist and regular rider, but even I am not expecting to see service to the extensions for a very long time. That's why I'm referring to the 38th street stop as the terminus. It's possible my anger about this decision is coloring my word choices. It's a stupid place for the end of the line as something like 30-40% of the land within a half mile radius is effectively useless due to being under state control. The Austin State Hospital is not a big trip generator and even if it was, it's now very far from the proposed stop. Most of the remaining land is low density, single family housing. Hyde Park Station is not among the most useful stops on the 801.
 
Assuming we manage to get through the lawsuits and also get federal funding, we'll still need to pass bonds to complete the priority extensions. There's some hope that the airport will be able to find money to at least partially construct the airport segment - this seems a little optimistic but that still leaves a bond to fund the segment to Crestview (and to grade separate the Red Line). That probably means a bond election a minimum of 4 to 6 years from now. Then after that there's a 2 year NEPA process. Then we beg and wait for federal funding.
Incorrect, no bond election is needed. ATP can issue bonds backed by it's taxing authority without needing an election. That is the issue at the very heart of the lawsuit.
 
how many times can the ATP do that though? or is the window for this mechanism time or project based?

The voters approved the creation of ATP, which is a permanent entity. There's no expiration. It was designed to allow Austin to build a world-class passenger rail system, which is going to take generations. It does not need any more elections. It can issue bonds, which will be paid back by the taxes it collects. This taxing authority also does not expire. We have the tools to really do something fantastic in Austin, but unfortunately there are those trying to overturn the will of the people.
 
The voters approved the creation of ATP, which is a permanent entity. There's no expiration. It was designed to allow Austin to build a world-class passenger rail system, which is going to take generations. It does not need any more elections. It can issue bonds, which will be paid back by the taxes it collects. This taxing authority also does not expire. We have the tools to really do something fantastic in Austin, but unfortunately there are those trying to overturn the will of the people.

That's good to know. Do we have any idea roughly as to when ATP would be in a position to issue a bond for the extensions?
 
Last edited:
I'm aware of the overall plan along with the priority extensions. However I think they made a huge mistake in not pushing the northern terminus of the initial segment up to at least Crestview. I understand that NLTC would have required state/TXDOT cooperation, so they can be forgiven for not going that far.

Even when construction begins, they can't just tack the priority extensions on the end even if funding was available. Those portions weren't included on the EIS, so they still need to go through NEPA.

Assuming we manage to get through the lawsuits and also get federal funding, we'll still need to pass bonds to complete the priority extensions. There's some hope that the airport will be able to find money to at least partially construct the airport segment - this seems a little optimistic but that still leaves a bond to fund the segment to Crestview (and to grade separate the Red Line). That probably means a bond election a minimum of 4 to 6 years from now. Then after that there's a 2 year NEPA process. Then we beg and wait for federal funding.

I'm an extreme transit optimist and regular rider, but even I am not expecting to see service to the extensions for a very long time. That's why I'm referring to the 38th street stop as the terminus. It's possible my anger about this decision is coloring my word choices. It's a stupid place for the end of the line as something like 30-40% of the land within a half mile radius is effectively useless due to being under state control. The Austin State Hospital is not a big trip generator and even if it was, it's now very far from the proposed stop. Most of the remaining land is low density, single family housing. Hyde Park Station is not among the most useful stops on the 801.


It's not an issue of "pushing". It's an issue of money. The trade off for getting LRT up to NLTC is that you lose the SOCO segment which I think is a great destination spot for people using the line and impacts the geo politics of the line and you lose riverside east of Pleasant Valley. The billion dollar (literally) question then is where do you find 70 acres for a train yard? The current spot along 71 next to the airport is already sprawl industrial so you aren't taking up valuable space that is better suited for residential, retail and office. Also, I think the airport connection is overrated but it's obviously a lot more feasible when the track ends at Riverside and 71 (like it will when the initial phase opens) as opposed to Riverside and Pleasant Valley.


And as Lobo explained, they can just keep the extensions going. As long as they start NEPA by 2031, they can be ready to building the extensions by the time the line opens. If they get a larger chunk from the feds, FAA or they use less than the 30% contingency then they can use local funds for the extensions and not go through NEPA at all.

The great thing about the extensions is it won't require a new train yard and all the other big overhead items. It's all just the cost of rebuilding the roads. Still, I think there needs to be a healthy debate about trading geographic reach in the extensions for grade separation / speed but that's not something we have to worry about now.
 

Austin's light rail system takes first step toward 3-mile airport connection​


The Austin Transit Partnership is kicking off planning for an extension of Austin Light Rail to Austin-Bergstrom International Airport.

The airport connection would represent a shift from current plans for the rail system, which label the extension as a future project, and the continuing Journey With AUS airport expansion program.

“This is such an exciting opportunity, not just for light rail but for Austin," said Lindsay Wood, ATP executive vice president of design and construction. "It's so important for us as a region to be continually planning how we are providing mobility capacity and choices and reliability into and out of our airport that is critical, not only for the transportation of our region, but for our economy."

Austin Light Rail is a signature piece of the multibillion-dollar Project Connect transit initiative approved by city voters with a permanent property tax increase in 2020. After cost increases resulted in scaled-down plans in 2023—including the removal of an anticipated airport connection—the rail network is now expected to connect Central, South and East Austin over 9.8 miles of track with 15 stations.

Through years of initial planning, the airport extension was viewed as a future addition on an undetermined timeline. But with rail system construction set to begin next year, ATP officials announced Nov. 10 that the transit entity is now considering service to ABIA.

Mayor Kirk Watson, who serves on the ATP board, said the update comes after Austin Light Rail cleared several notable progress markers and can complement Journey With AUS.

The Nov. 10 announcement from ATP officials said the roughly 3-mile extension from the Yellow Jacket station will be a "mostly elevated structure" ending at a station at the expanded ABIA. According to ATP, the new round of planning will take up to a year and involve:

  • Coordinating with the airport to integrate the proposed rail line and station with the Journey With AUS expansion program, including a new arrivals and departures hall, for a "seamless and convenient" passenger experience
  • Starting a new National Environmental Policy Act, or NEPA, process for the extension with the FTA, which has agreed to a streamlined review
  • Assessing the extension's costs and timing in relation to existing Austin Light Rail projects and revenue, and investigating other funding options including federal support
The extension planning is moving forward with the airport, Texas Department of Transportation and Federal Transit Administration, the agency responsible for key project approvals and billions of dollars in anticipated system funding.

In a statement, the airport confirmed it's working closely with ATP to ensure its long-range plans can accommodate potential future rail service.
 
I've dialed down expectations for a while on this rail vision. I would be happy if it (the initial project, without extensions) manages to deliver on-time in 2033. And if we're lucky, extension to AUS in-progress by 2033.

ATP had said they aimed to publicize timelines for construction start by the end of this year, I haven't seen anything yet.

AUS new arrival/departure hall will deliver in the early 2030s and I guess any airport rail station by the parking garages wouldn't deliver until at least when A/D hall, new pickup area and connectivity to the garage is finished.
 
I've dialed down expectations for a while on this rail vision. I would be happy if it (the initial project, without extensions) manages to deliver on-time in 2033. And if we're lucky, extension to AUS in-progress by 2033.

ATP had said they aimed to publicize timelines for construction start by the end of this year, I haven't seen anything yet.

AUS new arrival/departure hall will deliver in the early 2030s and I guess any airport rail station by the parking garages wouldn't deliver until at least when A/D hall, new pickup area and connectivity to the garage is finished.
They have the construction contacts going out next fall. So we know when construction is starting but not the sequencing. We are still waiting on permits to be filed but those will get priority review by the city.
 
Last edited:
Great news! This will be huge once the convention center is up and running.

Viewed a video about the Redline recently. The ridership numbers were not very good and it was reported that only 4 train sets out of the 10 in the fleet were currently operational. Said sourcing parts had become difficult and expensive.
Can you post a link to the video?
 