NEW YORK | 41 West 57th Street | 1,100 FT | 63 FLOORS

I can't wait for news about the new or modified design.

Sedesco is clearly moving forward, but Soloviev appears to be doing nothing across the street. He's not even tearing down 24 W 57th.

In any event, although a tenant was signed to the former Rifelessi space, I hope that its facade is changed to match the new tower's facade.

172106232.pposeMeg.41w5712b.png
 
Not much change. I really want to see what's working with this one.



MARCH 28, 2026


176201166.TYQkWhwp.IMG_8770.JPG




176201167.tKuDKWmE.IMG_8771.JPG




176201168.T4QGwo8Y.IMG_8772.JPG




176201170.rxQVT9bX.IMG_8773.JPG




176201171.QYCsswRb.IMG_8774.JPG




176201172.WpP3gNck.IMG_8775.JPG




176201173.z8oeNp03.IMG_8776.JPG




176201174.o397zsl9.IMG_8777.JPG
 
I hope that this site is combined with the Vornado/LeFrak site. I suspect that Soloviev’s site will be empty for decades, as will the Jeffries-Morris site. Further, if Sedesco's site is not combined with the Vornado/LeFrak site, the latter also will sit vacant for several extra decades.
 
Last edited:
https://www.thecityreporter.nyc/2026/06/30/elevator-subway-midtown-developer-build-mta/

First Subway Elevators Fully Funded by Developer to Open in Midtown
The pair of lifts were created in a program where companies pick up the tab for accessibility upgrades in exchange for permission to construct larger buildings.



062926_M_Train_Elevator_57th_St-scaled.jpg



BY JOSE MARTINEZ
JUNE 30, 2026


Even before another “Billionaires’ Row” tower pierces the Manhattan skyline, the developer of the planned skyscraper is leaving a mark underground.

Two new subway elevators at the 57th Street stop beneath Sixth Avenue are fully funded by the real estate firm Sedesco, which plans to build a high-rise at 41 W. 57th St., a long-empty plot between Fifth and Sixth avenues. The project is part of an initiative in which companies pick up the tab for Americans with Disabilities Act transit improvements while being granted permission by the city to construct larger buildings.

The station along the M line is the first to become fully accessible on a developer’s dollars under Zoning for Accessibility, a city and MTA program which provides real estate companies with bonuses to pay for the construction and maintenance of elevators in or near the transit system.

Zoning for Accessibility is a way of us accelerating this tremendous commitment that we’ve made to making as many of our stations accessible as possible as quickly as possible,” Jamie Torres-Springer, president of MTA Construction & Development, told The City Reporter. “And in a city as frenetic and real-estate driven as New York, a great opportunity for us to do that is to leverage the power of public-private partnership.”

Approved by the City Council in 2021, the initiative is seen by the transportation authority as a way to help fast-track its federal court-mandated goal of making 95% of the nearly 500 subway and Staten Island Railway stations accessible to people with disabilities by 2055.

The MTA last week announced that the 50th Street station along the No. 1 line will get elevators and other improvements through a deal with the real estate giant Extell, which will build a more than 1,000-foot Manhattan tower at 871 Seventh Ave.

Sedesco was the first company to sign on with the 2021 zoning-law change in exchange for upgrades to the station closest to its planned hotel-and-residential development. The development firm received a 20% bonus of buildable space on its project. It will be built on the stretch where luxury high-rises labeled “supertalls” have altered the skyline along what’s known as Billionaires’ Row.

“We’ve been working on completing this work on the [57th Street] station before we’ve even put a shovel in the ground on our development,” said Derek Gilchrist, partner and general counsel at the firm.

The development at one point was projected to be a 63-story, 1,100-foot-high tower, according to city records, though those plans are still in flux.

Meanwhile, the work continued underground.

In addition to the two new elevators, Sedesco paid for other ADA upgrades such as new fare gates and eight nearby curb cuts at street level.

The deal calls for the company to cover the costs of eventually replacing both elevators. One links the street level with the station mezzanine, while the other moves riders between the platform and mezzanine.

The MTA has hopes of expanding Zoning for Accessibility and has additionally secured eight easements — a legal right of way through private space — at developments where elevators connecting to the transit system could eventually be paid for by companies erecting buildings near or on top of the transit system.
 
This is the only project on 57th Street between 5th and 6th Avenues that I have any faith in. Soloviev is sitting on a goldmine, yet I suspect that it will pull a Vornado (i.e., Alexanders, Rizzoli, Hotel Penn....) and that its site will be empty for many years.

Jeffries Morris' site will outlast even Vornado.
 
Last edited:
July 23, 2026


176447606.WdIodSgj.IMG_6181.JPG




176447607.yVMw39B8.IMG_6182.JPG






Placeholder as shown in the Wellington Tower (871 7th) wind tunnel test...



176442643.ZOk6M3gt.d4.jpg
 
I wonder if this will become an office tower too.

It has been a year since the story about the possible 36 CPS redevelopment, which might obscure park views from part of Sedesco’s site.

Lastly, it remains to be seen if the Sedesco and Vornado sites will be combined. Soloviev owns the beautiful townhouse that separates them.
.
 
I wonder if this will become an office tower too.

It has been a year since the story about the possible 36 CPS redevelopment, which might obscure park views from part of Sedesco’s site.

Lastly, it remains to be seen if the Sedesco and Vornado sites will be combined. Soloviev owns the beautiful townhouse that separates them.
.

Doubtful. The only commercial space considered in the environmental review was for the hotel space. They could always go back to get approval for that though.
 
Doubtful. The only commercial space considered in the environmental review was for the hotel space. They could always go back to get approval for that though.

That’s good. A residential tower here should be very substantial.
 
It’s extremely frustrating not to have updates about this. While I have no faith in Soloviev, I’m sure that Sedesco is forging ahead.
 
The original design for this was cool, the conceptual one not so much.

I'm surprised this may not going ahead given its proximity to Central Park. I guess the current towers saturated the market.
 
Zappy,

You seem like a nice guy, but you have no clue about New York or our projects.

images


P.S.: I applaud your removal of the "kitty" avatar.
 
The original design for this was cool, the conceptual one not so much.

I'm surprised this may not going ahead given its proximity to Central Park. I guess the current towers saturated the market.

This tower has gone back to the planning stage more than once, with the expanded footprint. They have to commit to what they’re building before they build anything.
 
Zappy,
You seem like a nice guy, but you have no clue about New York or our projects.

I don't pretend to be an expert and appreciate your expertise, and while I understand these types of developments take a long time the sheer lack of movement of most NYC proposals (save a few) over the past few years is disheartening.

270 Park was a win and hopefully 350 will be too but a lot of others seem like a pipe dream at this point.
 

One of NYC’s final Gilded Age buildings sells for $42M — but is set for heartbreaking demolition​


By Emily Fu
Nov. 4, 2026


The historic Schieffelin-Bowne House at 35 W. 57th St., a five-story Beaux-Arts mansion dating to 1891, has been sold to New York-based developer Sedesco, giving the firm essentially the final piece of a yearslong assemblage for a soaring luxury skyscraper on Billionaires’ Row.
The acquisition represents essentially the final property needed to complete Sedesco’s sprawling development site, according to a source familiar with the project. With the land now largely assembled, the developer is expected to unveil updated plans in the coming months, the source added.
 