However those BRT lines will be designed with a hierarchy on which corridors need high frequency and ridership and are worth the investment upgrade. Goes back to smart fiscal and operational planning for successful transit network building.
Agreed, but depending on other factors such as travel...
Busways aren't automated either. So what is the logic of including that in this conversation? However frequency is a good thing depending on the corridor. If the corridor is congested with very poor on-time reliability then a bus every 5 minutes is not better than a rail operating every 15, if...
Anything can sap money if it is not planned, built and operated wisely and frugally.
A perfect example in LA with the Orange Line BRT. The corridor runs on a wide abandoned railroad right of way that connects the Metro Red Line subway with the heart of the San Fernando Valley. Now after less...
Streetcars as a mode I think are good pragmatic public transit in a dense corridor as well as future development investment.
IMO, the Broadway Streetcar project as currently designed does neither. Along most of Broadway, the transformational changes are happening without the streetcar, they're...
I know what I will do under some organizations that I work with to get this revised, reworked and made better. Even your own letter to your City Councilmember will make a difference.
But based on that logic with the Rental Car facility and the need for a remote check shouldn't the most logical place to put all that is in the same area at CONRAC? Think about it, if you're a visitor to LA and you rent a car what are you going to do ride the APM to stop at the ITF station, to...
Exactly which is why this 'LAX Connect' idea is very silly to me because they will need to do these things at the CONRAC at Manchester Square which is directly across the street from Century/Aviation could do all of these pieces without the need to build a costly spur that essentially duplicates...
http://media.metro.net/board/Items/2014/01_january/20140123rbmitem67.pdf. In attachment D you'll see that there will need more funding for some of the projects that you have listed. In addition that $7-10B over the life of the sales tax may need to factor in cost escalation of materials and...
No West Hollywood is not getting screwed again because there's been no formal environmental report on how the Crenshaw corridor will travel northward. It could go up La Brea, Fairfax. La Cienega or San Vicente. For the Move LA map purposes Fairfax was pick to visually explain the purpose and...
The only project(s) that were fully funded under Measure R are;
Orange Line Chatsworth Extension
Foothill Gold Line to Azusa
Under Measure R approximate amount of funds allocated to project:
Expo Phase 2 ($925M)
Crenshaw/LAX ($1.3 B)
Purple Line to VA ($4.0 B)
Regional Connector ($160M)...
After Newsom robs CA tax payers blind with Transbay Terminal connected with this. All this smells like is someone who is itching to run for Governor potentially.
Victory will probably be the easiest to run the an Orange Line Detour service while the conversion takes place. And if dedicated bus lanes are introduced as a stop gap measure as part of a "complete street implementation" then that would essentially mimic the travel pattern of the Orange Line...
I wonder what is the funding structures between the cities you refer to because that will give you an idea as to why and how some cities/regions are doing better than others on Transit? How high/low are the fares in the regions in question?
For example some regions like San Diego, the LRT...