Recent content by johnfowler

  1. J

    Confederation Line (Stage 1) | In Service 1.0

    Looking at a timetable from 2012, seems like the 95 was scheduled to take about 20 to 27 minutes from Tunney's to Blair, depending on the day and the time. If anyone was curious, the schedule for the Confederation Line as published on the site was 2 minutes between every station, with the...
  2. J

    OC Transpo

    Exactly; here is an article from The Citizen in 1985: https://www.newspapers.com/clip/23459955/battle_looms_on_transitways_crucial/
  3. J

    OC Transpo

    Correct, the dashed line on the '84, '85' and '86 maps is showing the at-grade Albert Street bus mall that was part of the original Transitway plan adopted in 1980. It was supposed to have two bus lanes and a single one-way lane for access to businesses.
  4. J

    Rural Commuter Rail

    The rubber strips are a form of displaceable enclosed flangeway gap fillers and remain in place if a train needed to cross the bridge. Here's a photo from the Transportation Safety Board of Canada's website:
  5. J

    Confederation Line (Stage 1) | In Service 1.0

    There will definitely be some sort of "trial" period based on the presentations that have been made by ward counsellors for the bus service changes. They all reference the following implementation schedule: Before opening: Some bus routes modified to connect with the O-Train Opening: Bus...
  6. J

    Greyhound bus

    Tickets for trips inside Canada need to be bought on greyhound.ca — the previous US site would display a message when you tried to buy such a ticket, but the new fancier one left that feature out. I am hoping though that we get the fancier website (and the bus tracker) eventually.
  7. J

    OC Transpo

    Effective June 19th, route 21 will be eliminated. The Casino has decided to end its subsidy of the route, given most people are using the more-frequent service at the nearby Rapibus station now.
  8. J

    General STO News and Rapibus System

    John Manconi answered a question in the Stage 2 LRT information session about the transfers from the LRT to the STO and said: The main transfer point from Gatineau into Ottawa will be at Lyon station. It is that sized to handle a lot of transfers. There will also be some continuous service of...
  9. J

    General STO News and Rapibus System

    Phase II is Labrosse-Lorrain; Phase III is Lorrain–Aéroport.
  10. J

    Confederation Line (Stage 1) | In Service 1.0

    The two reused stairwells will actually be completely walled-off and used only for maintenance, because the lower level will be inside of the paid area, the middle level will go nowhere as you noticed, and the upper level will be outside the paid area. I agree it is sort of a odd architectural...