    Millennium/Expo Line Service Link

    The physical link between the two lines came along with OMC6 as a package deal. You would have had another spur coming off the route I drew connecting the two lines. So yes, the spur was built to specifically connect the two lines, because the switch to the OMC would have come from the middle...
  2. F

    Millennium/Expo Line Service Link

    I wonder how OMC4 changes the equation for this link. On the one hand, the Millennium Line now needs it LESS, because even if you fully severed the physical junction at Columbia, the Millennium Line can now operate fully independently with its own full service OMC4. On the other hand for the...
  3. F

    Millennium/Expo Line Service Link

    It's a surprisingly and remarkably short connection, only 450 meters.
  4. F

    Millennium/Expo Line Service Link

    The spur just west of VCC Clark was built in case a need ever arose to physically connect the Expo Line with the Millennium Line. A single track line would be built through the rail yard, connecting with a future switch junction somewhere along Terminal Avenue. This connection would likely...
  5. F

    Best Looking SkyTrain Generation

    If you look very closely, that was just black paint.
  6. F

    Best Looking SkyTrain Generation

    MK I prototypes were better (and more serious) looking: Credit: SFU Urban https://sfuurban.wordpress.com/wp-content/uploads/2012/07/main-st-stn_perspective-5-photography-design-on-august-7-1983.jpg
  7. F

    Best Looking SkyTrain Generation

    I still think that the original design of the Mark II was the best looking: Image credit Rapid Transit Project Office 2000 https://www.llbc.leg.bc.ca/public/Pub...rainReview.pdf Then followed by the new Mark V.
  8. F

    Heavy Rail, Commuter Rail, & Intercity Transportation

    The sad thing is, if the WCE was not implemented back in the day, it would never have been implemented today.
  9. F

    Expo Line - Surrey Langley Extension: Planning & Pre-Construction

    Will they be building a wye just after King George station for a possible future SkyTrain extension south towards White Rock to keep LRT from EVER coming back to the table???
  10. F

    Metro Vancouver Transit Discussion

    It would take 18 months down time to put in a junction with switches in an elevated guideway.
  11. F

    Metro Vancouver Transit Discussion

    I think he's referring to the basket weave that was not followed through on when they built the Evergreen Line out of cost cutting. It would have allowed for the current platform configuration without wrong-railing and no crossover switching at Burquitlam.
  12. F

    Metro Vancouver Transit Discussion

    Regarding the theoretical maximum speed of our Bombardier LIM SkyTrain and whether it can be made to go faster; the Beijing Airport Express (purely made up of 4-car MK II trains) operates at 110 km/h.
  13. F

    Millennium Line - Evergreen Extension | Completed

    I was the first to predict December 3rd. See my post #9154 on page 458.
  14. F

    Millennium Line - Evergreen Extension | Completed

    Nope. In fact I vividly remember someone getting pulled off the train for no fare at Production Way by Transit police on opening day.
  15. F

    Millennium Line - Evergreen Extension | Completed

    I predict a Saturday December 3rd opening.