PDA

View Full Version : Downtown & City of Ottawa


Pages : [1] 2 3 4 5 6 7 8

  1. The Bowery Condos [255 Bay St] | ?m | 17f | Completed
  2. 90 George | 64m | 19 fl | Completed
  3. Performance Court (150 Elgin) | 90.5m | 21 fl | Completed
  4. Shaw Centre (Ottawa Convention Centre) | 30.45m | 4-5 fl | Completed
  5. The Continental | ?m | 15 fl | Completed
  6. The Galleria | 36m | 12 fl | Completed
  7. Telus Ottawa HQ | 8 fl | Completed
  8. Wateridge Village development [Hemlock Rd, Codd's Rd] | U/C
  9. SOHO Italia [500 Preston St] | 96m | 30 fl | U/C
  10. Claridge Plaza I & II | 78m |25 fl| Completed
  11. Mondrian | 73m | 24 fl | Completed
  12. LeBreton Flats | 14 fl (Ph.1)|Completed | 13 fl (Ph.2)|Completed
  13. Hudson Park | 17 fl | Completed (Phase I)| 19 fl | Completed (Phase II)
  14. La Tiffani I&II and Riverpath Retirement| 20-25 fl Complete | 8fl U/C
  15. Les Terrasses Gabrielle | ? | 7 | Construction
  16. Hampton Hotel and Conference Center | ?m | 14 fl | Completed
  17. General Update/Rumour thread
  18. Somerset Gardens | ??m | 11 fl | Completed
  19. The Slater | 66.6 m | 22 fl | Completed
  20. Piccadilly |?m | 6fl |Completed
  21. Westboro Station | ?m | 10fl | Completed (Phase I) | Completed (Ph. 2)
  22. 180 Kent (Minto Place Phase III) | ?m |19 fl | Completed
  23. Desmarais Building | 12 fl | Completed
  24. STRATHCONA-ON-THE-PARK | 12.5 m | 4 FL. | Completed
  25. [Gatineau] Place du Parc - Park Place | ?m | 9 fl | Completed
  26. [Gatineau] Les Jardins Notre-Dame | ? m | 8 fl | Completed
  27. [Gatineau] Kevric Real Estate Corporation | 15 fl | Proposed
  28. [Gatineau] Université du Québec en Outaouais|?m|?f|U/C/Proposed (Multiple buildings
  29. eco-cite on the canal | 5 fl | u/c
  30. Parliamentary Precinct
  31. 265 Laurier | ??m | 18 fl | Proposed
  32. King Street Makeover| Proposed
  33. Canada Science & Technology Museum | Completed
  34. ByWard Parkade | 4fl | Proposed
  35. Le St. Denis | ??m | 3 fl | Completed
  36. Lofts On The Park | ??m | 4 fl | sales
  37. Merrion Square | 10fl, 8 fl, townhomes | Completed
  38. The Civic District: Imagine the Possibilities!
  39. City of Waterloo's Official Plan
  40. Amica at Westboro Park | 6 fl | Construction
  41. [Gatineau] Domaine des Trembles | 7fl | Completed
  42. Place de Ville III | 76.7m | 18 fl | Proposed
  43. Lansdowne Park Revitalization | N/A | N/A | Proposed
  44. Central (Phase 1-3) | ?m | 9 fl | Completed
  45. Concord-on-the-Canal | 34 m | 10 fl | Proposed
  46. Rethinking the Hespeler Road strip - 2005 Concept Plan
  47. Carleton University Residence (Frontenac) | 6fl | Completed
  48. 1490-1500 Merivale Rd | 5 Buildings | up to 34m | 9f-11f | Proposed
  49. Kitchener's Mixed-Use Corridor Strategy
  50. Tribeca | 84.5m | 27 fl x 2 | Completed
  51. Place des Gouverneurs | 17 buildings | U/C
  52. Carleton University Riverside Buildings | ?m | 7 fl | U/C
  53. D/T Gatineau Hotel | Proposed | 130 Rooms
  54. Downtown Advisory Committee
  55. University of Ottawa - Vanier Hall tower | 15 fl | Completed
  56. Canadian Museum of Nature |4fl | Completed
  57. Custom Google Map
  58. 424 Metcalfe/Beaver Barracks Redevelopment | Completed
  59. River Court Lofts | 3fl | U/C
  60. The Azure (929 Richmond) | 70.6m | 20fl | U/C
  61. re Residences [101 Queen St] | 17 fl | Completed
  62. 1000 Place des Gouverneurs
  63. The Galleria II | 42.5 m | 14 fl | Completed
  64. Onyx [287 Lisgar St] | 16f | Completed
  65. Ottawa college puts rare green space up for sale
  66. Z6 Urban Lofts | 15m | 5 fl | Completed
  67. Developing Downtown
  68. "G" | 15 m | 4 fl | Completed
  69. re.THINK re.INVENT re.URBANIZE - October 1, 2008
  70. Structures on Rogers TV - Tuesdays @ 12:30 PM
  71. 2nd Annual University of Waterloo Downtown smARTS Tour - September 20, 2008
  72. EDC | 78.2 m | 19 fl | Completed
  73. Laurentian High School redevelopment | Proposed
  74. Cambridge leads in its heritage plan
  75. This Old Haus: A Place in Time - Book Launch September 28, 2008 1-4pm
  76. Morrison-Draper Redevelopment: 3 towers & lowrise| 45.5-64.5 m |14-20 fl |Proposed
  77. New Regional Official Plan (ROP)
  78. University of Waterloo master plan workbook
  79. Waterloo Region Growth Strategy
  80. [Gatineau] Le Columbia| 20 fl | U/C
  81. CSIS | ?m | 5fl | Proposed
  82. Local/Laurier Community Discussion
  83. "City of Kitchener ponders growth through 2031"
  84. St. Mary's Site (Riverside/Hunt Club) | Four towers, 8 storeys each
  85. 263-267 Rochester | 22.1 m | 7 fl | Proposed
  86. The Wellington at Island Park | 18m | 6 fl | U/C
  87. One3One |131-137 Holland Ave | 24.8 m | 8 fl | U/C
  88. 101 Richmond and 111 West | 19.0 m, 24.1 m | 6 fl, 8 fl | Completed
  89. 330 Gilmour | 22.8 m | 7 fl | Approved
  90. Rideau-Sussex Redesign/Public Square | Proposed
  91. Trinity Centre [900 Albert St] | 234/203/105m | 65/56/23fl | Approved
  92. City vision op-ed
  93. Egyptian Embassy | ? m | 3 fl | Proposed
  94. 130 Daly Ave. | 13.2m | 4fl | Proposed
  95. Second Avenue West | ?m | 4fl | Proposed
  96. SOHO Parkway | 15 fl | Completed
  97. Save Kiwanis Park
  98. [Gatineau] - Place du Centre III |18 fl(?)| Proposed
  99. 800 Montreal Road Redevelopment | U/C
  100. Westboro Connection | Completed