Anders Franzén
Mar 9, 2020, 6:32 PM
GOLDEN DRAGON CENTRE
Official sources: https://bmis1.buildingmgt.gov.hk/bd_hadbiex/content/searchbuilding/building_search.jsf (search for the building)
Unofficial sources: http://www.primeoffice.com.hk/hong-kong-office/7207/golden-dragon-centre
Building Name: Golden Dragon Centre
Native Name: 金龍中心
Other Names:
Street Address: 38-40 Cameron Road, Tsim Sha Tsui
City: Hong Kong
Postal Code:
State/Province: Hong Kong
Country: China
Official Building Website URL:
Wikipedia.org URL:
Emporis.com URL:
CTBUH.org URL:
Structurae.de URL:
Architect:
Interesting Facts/Records (in own words):
Coordinates (with decimal fraction): 22.299017, 114.174689
Heights--
- antenna:
- spire:
- roof: 70 m (Estimated/Google Earth)
- top floor:
- other heights:
Current Building Status: Built
Construction Dates--
- started:
- finished: 1992
- destroyed:
Above ground floors: 19
Basement floors:
Gross Floor area:
Unit count:
Structure Type: Highrise
Building Use: Office, Restaurant
Building Style:
Building Materials:
Official sources: https://bmis1.buildingmgt.gov.hk/bd_hadbiex/content/searchbuilding/building_search.jsf (search for the building)
Unofficial sources: http://www.primeoffice.com.hk/hong-kong-office/7207/golden-dragon-centre
Building Name: Golden Dragon Centre
Native Name: 金龍中心
Other Names:
Street Address: 38-40 Cameron Road, Tsim Sha Tsui
City: Hong Kong
Postal Code:
State/Province: Hong Kong
Country: China
Official Building Website URL:
Wikipedia.org URL:
Emporis.com URL:
CTBUH.org URL:
Structurae.de URL:
Architect:
Interesting Facts/Records (in own words):
Coordinates (with decimal fraction): 22.299017, 114.174689
Heights--
- antenna:
- spire:
- roof: 70 m (Estimated/Google Earth)
- top floor:
- other heights:
Current Building Status: Built
Construction Dates--
- started:
- finished: 1992
- destroyed:
Above ground floors: 19
Basement floors:
Gross Floor area:
Unit count:
Structure Type: Highrise
Building Use: Office, Restaurant
Building Style:
Building Materials: