Axelmuno
Jan 22, 2020, 5:12 AM
BUILDING REQUEST FORM
-----------------------------------
Official sources: https://hausleon.mx/arquitectos/
Unofficial sources: https://www.skyscrapercity.com/showthread.php?t=2034224
Building Name: Torre Haus Corporativa
Native Name: Haus Corporativo
Other Names:
Street Address: Bulevar Campestre
City: León
Postal Code: 37150
State/Province: Guanajuato
Country: México
Official Building Website URL: https://hausleon.mx/arquitectos/
Wikipedia.org URL:
Skyscrapers.com (Emporis.com) URL: https://www.skyscrapercity.com/showthread.php?t=2034224
CTBUH.org URL :
Structurae.de URL:
• Architect:
• Floor to floor height: 4.0 meters
Interesting Facts/Records (in own words): It has 2 commercial levels, amenities for workers and esplanade.
•
•
Coordinates (with decimal fraction):
Heights--
Reminder: (Use Meters)
- antenna:
- spire:
- roof:
- top floor:
- other heights: 60 meters estimated
Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Under construction
Construction Dates--
- started: 2020
- finished: 2021
- destroyed:
Above ground floors:
Underground floors:
Gross Floor area:
Unit count: 15
Structure Type(s): Highrise
Building Use(s): Corporative
Building Style(s):
Building Materials: Reinforced iron rods with concrete and reinforced facade.
-----------------------------------
Official sources: https://hausleon.mx/arquitectos/
Unofficial sources: https://www.skyscrapercity.com/showthread.php?t=2034224
Building Name: Torre Haus Corporativa
Native Name: Haus Corporativo
Other Names:
Street Address: Bulevar Campestre
City: León
Postal Code: 37150
State/Province: Guanajuato
Country: México
Official Building Website URL: https://hausleon.mx/arquitectos/
Wikipedia.org URL:
Skyscrapers.com (Emporis.com) URL: https://www.skyscrapercity.com/showthread.php?t=2034224
CTBUH.org URL :
Structurae.de URL:
• Architect:
• Floor to floor height: 4.0 meters
Interesting Facts/Records (in own words): It has 2 commercial levels, amenities for workers and esplanade.
•
•
Coordinates (with decimal fraction):
Heights--
Reminder: (Use Meters)
- antenna:
- spire:
- roof:
- top floor:
- other heights: 60 meters estimated
Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Under construction
Construction Dates--
- started: 2020
- finished: 2021
- destroyed:
Above ground floors:
Underground floors:
Gross Floor area:
Unit count: 15
Structure Type(s): Highrise
Building Use(s): Corporative
Building Style(s):
Building Materials: Reinforced iron rods with concrete and reinforced facade.