Quilmeño89
Dec 26, 2017, 10:38 PM
Unofficial sources: http://www.goldonipropiedades.com.ar/vuoto-primo-SPE1678
http://www.skyscrapercity.com/showpost.php?p=143470504&postcount=720
http://www.skyscrapercity.com/showpost.php?p=141710550&postcount=659
Building Name: Vuoto Primo
Street Address: Brandsen & Alvear
City: Quilmes (http://skyscraperpage.com/cities/?cityID=3552)
Postal Code: B1878JWE
State/Province: Buenos Aires
Country: Argentina
• Architect: Rubén B. Gabastón (https://www.google.com/maps/@-34.7259555,-58.2519226,3a,15y,225.63h,96.67t/data=!3m6!1e1!3m4!1sscQ4OZTQDmqnIOoNf7MZ7A!2e0!7i13312!8i6656?hl=es)
Coordinates (with decimal fraction): -34.726073, -58.251982 (https://www.google.com/maps/place/34%C2%B043'33.9%22S+58%C2%B015'07.1%22W/@-34.7260719,-58.2525292,233m/data=!3m2!1e3!4b1!4m6!3m5!1s0x0:0x0!7e2!8m2!3d-34.7260735!4d-58.2519819?hl=es)
Heights--
- roof: 38 m (estimated)
Current Building Status: Under construction
Construction Dates--
- started: 2016 (Google Earth historical imagery)
- finished: 2018 (first source)
Above ground floors: 10
Structure Type(s): highrise
Building Use(s): office, parking garage
Building Style(s): modern
Building Materials: reinforced concrete, brick
Drawing preview:
https://i.imgur.com/BqR1IeO.jpg
http://www.skyscrapercity.com/showpost.php?p=143470504&postcount=720
http://www.skyscrapercity.com/showpost.php?p=141710550&postcount=659
Building Name: Vuoto Primo
Street Address: Brandsen & Alvear
City: Quilmes (http://skyscraperpage.com/cities/?cityID=3552)
Postal Code: B1878JWE
State/Province: Buenos Aires
Country: Argentina
• Architect: Rubén B. Gabastón (https://www.google.com/maps/@-34.7259555,-58.2519226,3a,15y,225.63h,96.67t/data=!3m6!1e1!3m4!1sscQ4OZTQDmqnIOoNf7MZ7A!2e0!7i13312!8i6656?hl=es)
Coordinates (with decimal fraction): -34.726073, -58.251982 (https://www.google.com/maps/place/34%C2%B043'33.9%22S+58%C2%B015'07.1%22W/@-34.7260719,-58.2525292,233m/data=!3m2!1e3!4b1!4m6!3m5!1s0x0:0x0!7e2!8m2!3d-34.7260735!4d-58.2519819?hl=es)
Heights--
- roof: 38 m (estimated)
Current Building Status: Under construction
Construction Dates--
- started: 2016 (Google Earth historical imagery)
- finished: 2018 (first source)
Above ground floors: 10
Structure Type(s): highrise
Building Use(s): office, parking garage
Building Style(s): modern
Building Materials: reinforced concrete, brick
Drawing preview:
https://i.imgur.com/BqR1IeO.jpg