PDA

View Full Version : Mumbai,India , 1 Building


jinka sreekanth
Oct 16, 2017, 1:32 PM
http://www.jssl.in/uploads/project/gallery/zoom/pic-metal-box-artesia-132.jpg

https://s26.postimg.org/nn0e0eynt/IMG_20170902_064119.jpg

Official sources:http://www.krahejacorp.com/Artesia-Mumbai.html
Unofficial sources: https://www.99acres.com/k-raheja-artesia-hanuman-nagar-mumbai-south-npxid-r276977
http://www.jssl.in/real-estate/metal-box-artesia-56
https://rbrealty.in/properties/raheja-artesia/

Building Name:Raheja Artesia
Native Name:
Other Names:
Street Address: Babulrao Pendarkar Marg, Worli
City: Mumbai
Postal Code:400025
State/Province: Maharashtra
Country: India
Official Building Website URL:http://www.krahejacorp.com/Artesia-Mumbai.html
Wikipedia.org URL:
Skyscrapers.com (Emporis.com) URL:
CTBUH.org URL :
Structurae.de URL: Sterling Engineering Consultancy Services
• Architect: RSP Design architects
Interesting Facts/Records (in own words):


• Floor-to-floor height:3.90Meters
Coordinates (with decimal fraction):19.007369, 72.822229

Reminder: (Use Meters)
- antenna:
- spire:
- roof: 232 source (https://maharerait.mahaonline.gov.in/PrintPreview/PrintPreview/UHJvamVjdElEPTE1NzYmRGl2aXNpb249NiZVc2VySUQ9MTg4NzkmUm9sZUlEPTEmQXBwSUQ9MTk3NjAmQWN0aW9uPVNFQVJDSA%3D%3D)
- top floor:
- other heights:

Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Under Construction

Construction Dates--
- started: 2013
- finished: 2019
- destroyed:

Above ground floors: 60
Basement floors: 2
Gross Floor area:
Unit count:

Structure Type(s): Concrete and glass
Building Use(s): Residential
Building Style(s): Modern
Building Materials:

jinka sreekanth
Oct 17, 2017, 3:59 AM
Height source (https://maharerait.mahaonline.gov.in/PrintPreview/PrintPreview/UHJvamVjdElEPTE1NzYmRGl2aXNpb249NiZVc2VySUQ9MTg4NzkmUm9sZUlEPTEmQXBwSUQ9MTk3NjAmQWN0aW9uPVNFQVJDSA%3D%3D)

https://s1.postimg.org/8welk7fkun/artesia_height.png

LMich
Oct 17, 2017, 5:10 AM
Revised Proposed Date of Completion
31/12/2022

Possession Date (As per RERA) : 2022-12-31

Possession
Under Construction
Dec 2022

jinka sreekanth
Oct 17, 2017, 7:09 AM
Already structure is above 50 floors.It will be topped out by march 2018.