AirZeus
Apr 24, 2017, 6:24 PM
http://skyscraperpage.com/cities/?buildingID=113052
I posted some Charlotte updates and mistakenly labeled it "600" instead of 620.
At any rate, the 620 S Tyron building needs its status updated from proposed to under construction (sources are in original thread that was moved to 'completed').
Also, the Kimpton Hotel needs to be updated from UC to built.
I posted some Charlotte updates and mistakenly labeled it "600" instead of 620.
At any rate, the 620 S Tyron building needs its status updated from proposed to under construction (sources are in original thread that was moved to 'completed').
Also, the Kimpton Hotel needs to be updated from UC to built.