Sept. 18 Pictures:
^^^^ Glass going onto the 18th floor
^^^^ Glass also going onto the condo ground floor.
^^^^ New curb work going in. It looks like they have removed a bunch on angle parking spots for a driveway in front of the hotel door. On the right side of the photo can been seen some of the brick work. Further down on the front of the hotel (just to the upper right of the white sign) can be seen huge electrical and gas service infrastructure. Facing the street. It looks terrible. Hopefully it will be hidden by landscaping or something.
I can't tell if the second floor has been poured or not... The second floorplate is quite small as there are double height lobbies. The black siding on the hotel looks fantastic in person.