HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #8721  
Old Posted Apr 26, 2024, 1:29 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
Salt Lake City & MSA/CSA Rundown

Remodeled Delta Center and other downtown developments envisioned with NHL team


Ben Winslow Reporting for FOX13 - Full Article @ https://www.fox13now.com/sports/nhl-...-with-nhl-team

SALT LAKE CITY — With the arrival of the new professional hockey team in Utah, city leaders are working quickly to enact plans for the downtown entertainment district surrounding them...

...So far, team owners Ryan and Ashley Smith have signaled a desire to remodel the Delta Center to host both the Utah Jazz and the team formerly known as the Arizona Coyotes. Ryan Smith suggested as much in a recent interview with FOX 13 Sports following the announcement of the team's move to Utah.

"For the community and for Salt Lake, we have a chance to really re-imagine what downtown Salt Lake looks like and both Ash and I and our partners are on board making that kind of impact. Any time you've got over 80 to 100 nights of guaranteed major league sports downtown, there's a lot you can do with that," he told FOX 13's Jeff Rhineer.

But there will be development beyond that. The legislature's special entertainment district stretches blocks surrounding the Delta Center.

"There is all kinds of opportunity in that immediate area," said Dee Brewer, the executive director of the Downtown Alliance, an organization within the Salt Lake Chamber that serves to advance downtown Salt Lake City interests.

He said he envisions more restaurants, bars and hotels. Negotiations are currently under way between Salt Lake City, Salt Lake County (which owns
the Salt Palace and Abravanel Hall) and other downtown stakeholders...


.

Last edited by delts145; Apr 27, 2024 at 1:31 AM.
Reply With Quote
     
     
  #8722  
Old Posted Apr 27, 2024, 12:27 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
More details of Utah NHL arena vision revealed

Ryan Smith says Delta Center will be remodeled to seat about 17,000 fans without compromising basketball experience




By Alixel Cabrera - For The Utah Dispatch - Full Article @ https://utahnewsdispatch.com/2024/04...sion-revealed/
Hours after the National Hockey League announced that the Arizona Coyotes would move to downtown Salt Lake City under a new name and logo, the Delta Center sold over 22,000 season ticket deposits for the new hockey team.

A sign that — according to NHL commissioner Gary Bettman along with Ryan and Ashley Smith, who own the Smith Entertainment Group — demonstrates the state’s enthusiasm to bring professional hockey.

Going forward, the arena that until now had hosted the Utah Jazz is set to undergo a major makeover to also accommodate an ice rink. That, instead of building a new arena as SB272, or Capital City Revitalization Zone, originally proposed to the Utah Legislature during this year’s general session...


The hockey rink at the Delta Center is seen with the “NHL in Utah” logos appearing on the signage on April 19, 2024 in Salt Lake City, Utah. The NHL has allowed the sale of the Arizona Coyotes and the team will relocate to Salt Lake City, Utah. (Photo by Chris Gardner/Getty Images) @ https://utahnewsdispatch.com/2024/04...sion-revealed/

...The Delta Center, which Smith described as having “great bones,” will be remodeled to host both hockey and basketball. The Smiths’ current plans entail a reduction of seats, from 20,000 to about 17,000. It wouldn’t compromise the NBA experience, Smith said. About 12,000 of those will have perfect views.

The hope, he said, is to create a more vibrant downtown, with families visiting for afternoon games and hanging out until midnight. “Another 40 nights a year helps that.”

Smith also expects the redevelopment to benefit the surrounding area to the Delta Center and include more housing around the facility.

The company had plans to move the Utah Jazz to an arena in Draper, where there was “a blank piece of land,” that could have included 100 acres and 5,000 housing units. But elected officials stopped that effort in the middle of the process, Smith said, arguing that the Jazz should stay downtown...



..."Salt Lake City can’t wait to welcome the world back and we are going to sign that contract on July 24 for the 2034 Winter Olympics to come back here," Mayor Mendenhall said. “And I think all of these things combined are symbolic of the spirit of Salt Lakers.” ...



.

Last edited by delts145; Apr 28, 2024 at 2:01 PM.
Reply With Quote
     
     
  #8723  
Old Posted Apr 28, 2024, 12:39 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
Southern Metro Updates - Utah City breaks ground on a very ambitious TOD


A new transit-oriented development in Utah is planned with the density and amenities of a big city downtown.


By Robert Steuteville, F-CNU, Editor of Public Square: A CNU Journal and senior communications adviser for the Congress for the New Urbanism.
Full article @ https://www.cnu.org/publicsquare/aut...rt-steuteville


Utah City is the biggest and most ambitious transit-oriented development (TOD) that I have ever seen. Surprisingly, it is breaking ground not in New York, DC, or LA, but on a windswept, barren site near Provo, Utah.

“Located on the east shore of Utah Lake, this will be Utah County’s (Southern MSA portion of the greater CSA) largest sustainable, walkable, transit-oriented, mixed-use community. Utah City is being designed and developed to be the urban core of the county,” the Daily Herald newspaper reported this week...


Prelimenary Conceptual Rendering


This 300-acre development is being built on the remediated site of the former Geneva Steel Works. A commuter rail station opened for the proposed urban center on the FrontRunner line, which runs 88 miles on the Wasatch front, connecting Provo to Ogden by way of Salt Lake City.

Utah City is planned to hold more than 20 million square feet of new buildings of every use, according to Jeff Speck, the chief project planner since 2019. Its ultimate build-out will be similar to that of Daybreak (an important new urbanist development about 10 miles away as the crow flies), but on less than one-tenth of the land area, he calculates...


Phase I urban design: Some streets have been built and construction has begun on this phase, which connects the transit station to the main square. Picturesque geometries include a view of the first planned church(meeting house). A protocol for mid-block pedestrian passages is established. Source: Jeff Speck.


Planned for up to 17,000 residential units on under a half square mile of land, the development would achieve the density of a major big city downtown. The current master plan came out of a charrette run by DPZ CoDesign, brought in through Speck’s recommendation in early 2020. Nelsen Partners is the architectural designer, and OJB and Dig Studio are working on the landscape design—including 47 acres of parks.

The Flagship Companies and Woodbury Corporation are developing Utah City. “Ground was turned last week on 450 units of multi-family dwellings, signaling the start of the project. The Huntsman Cancer Institute will break ground early next year,” according to the Daily Herald, which covers the Provo-Orem area.


Utah City is a big deal on the fast-growing Wasatch Front, warranting a ribbon-cutting speech from Gov. Spencer Cox. He described the project as “Density done the right way … it is healthy, it’s good, it’s positive,” adding that “we can’t keep adding lanes to I-15.”

Anchors already include the station, which opened in August 2022, and the cancer research center that will provide over 150 patient beds and is expected to bring thousands of high-paying jobs to the county, reports the Daily Herald. The site is located in Vineyard, Utah, currently an automobile-oriented place, with typical sprawl development. But the town is embracing TOD.

“This incredible site marks one of the greatest developments in Utah history, one that is shaping the future of Utah’s upcoming development, and one that will drive Utah’s economy for many decades to come,” Vineyard Mayor Julie Fullmer says.


Annotated plan shows civic sites in blue, including meeting houses, a performing arts center, a library, a fire station, a school,
and a variety of parks. The planned higher education, adjacent to Utah City, is on the other side of the FrontRunner tracks. Source: DPZ CoDesign.


The design team is committed to include almost every aspect of daily life within walking distance, Speck explains. In addition to housing, offices, and retail stores, plans are moving forward for churches, a supermarket, a performing arts center, and a large school. The whole site will be within a 15-minute walk or five minute bike ride of commuter rail. A university campus is growing adjacent to the site, and is also accessible to the rail station. “People living in [Utah City] will rarely find themselves having to leave, and when they do, they can hop a train to Salt Lake City or Provo,” he says.

The first streets have been built. The plans are fully approved, a form-based code (FBC) is adopted, and several hundred million dollars have been raised to support the effort, Speck notes.

Utah City advances CNU best practices for the public realm, Speck says. Driving lanes are narrow, cycling facilities are ubiquitous, and parking is hidden. Architecture is contemporary but with traditional proportions. Street trees are everywhere. “The oversized Utah block is used to create a secondary pedestrian network that breaks each superblock into multiple blocks accessible only by foot,” he told CNU...

Typical street sections: All streets carrying significant traffic are designed to accommodate bicycles,
either within slow-speed, shared-space cart paths or protected beyond parked cars. Source: DPZCoDesign



The 300-acre development is divided into three zones: The Town Center, including the train station and Market Street, the Mixed-Use Promenade, which will enhance the connection between the train station and the lakefront, and the Mixed-Use Village, connected to both the Promenade and Town Center, including a mix of residential and village commercial uses.

Green spaces include two waterfront parks, a central promenade, and a large collection of sports fields. The plan incorporates about four million square feet of office space and a million square feet of retail. The living spaces include rowhouses, condominiums, and apartments in a wide variety of configurations.

When Speck was hired, a plan and code were already in place, but they failed to meet some Charter of the New Urbanism principles. For example, an entire section was single-use office space, located a distance from the transit station, and some streets were automobile-oriented. “The design team was tasked with dramatically modifying almost every aspect of an already approved plan and code without voiding its permits,” he explains. The original rudimentary FBC was modified for the current plan. The developer and the city cooperated on modifications, avoiding significant red tape.

The development could have just been another park-and-ride stop along the route from Provo to Ogden. A much better plan came about, CNU was told, because “enlightened developers and a progressive municipality … wanted something different.”

Editor's note: This article addresses CNU’s Strategic Plan goal of working to change codes and regulations blocking walkable urbanism.




PHASE I UPDATE - January/February 2024


Quote:
“Wellness and innovation will always be a top priority throughout the development of Utah City, and Huntsman Cancer Institute is a leader in both of those fronts.” - Jeff Woodbury, Sr. Vice president of development and acquisitions for Woodbury Corporation
Utah City developers make $20M land donation to the Huntsman Cancer Institute

Huntsman Cancer Institute at the University of Utah (the U) has received a $20 million land donation from the developers of Utah City, a new walkable mixed-use city center. This significant contribution from Woodbury Corporation and Flagship Companies, in partnership with the City of Vineyard, will pave the way for the establishment of the state-of-the-art Huntsman Cancer Institute campus in Utah County. Huntsman Cancer Institute is the National Cancer Institute-designated Comprehensive Cancer Center for Utah, Idaho, Nevada, Wyoming and Montana.

Situated on a 48-acre plot of land just north of Vineyard Station, the new 20-acre campus will provide patients and their families breathtaking views of Utah Lake and the majestic mountains. Strategically located near FrontRunner, I-15, and Provo Municipal Airport, the campus will also significantly decrease travel time for people from Southern Utah and surrounding states. This convenient site tackles a major health care disparity, allowing Huntsman Cancer Institute to extend its reach and provide outstanding care to more patients across the region.



Preliminary Rendering of the new Huntsman Cancer Institute, Vineyard Campus


Upcoming Huntsman Cancer Institute development site.


Huntsman Cancer Institute's state-of-the-art Vineyard campus will be built on this land just north of Vineyard Station in Utah County
https://healthcare.utah.edu/huntsman...-county-campus



Huntsman Cancer Institute envisions this location as one that will create a healing and tranquil environment for patients. Nestled among the beauty of Utah Lake and Mount Timpanogos, the campus will be designed as a walkable community with multi-mode transit options. This will allow patients and their loved ones to effortlessly navigate a serene and peaceful atmosphere.


Map with the perspective of the 'Huntsman Cancer Institutes' location within the greater 'Utah City' development

https://healthcare.utah.edu/huntsman...-county-campus





Updated Progress Report For April 2024

Southern Metro Update - Block 4 of Utah City - Vineyard District - https://www.kpf.com/project/utah-city


A KPF Design - https://www.kpf.com/current - KPF in the context of urban design stands for Kohn Pedersen Fox Associates. KPF is an architectural firm that has been refining its design process for over 40 years. Their KPF Urban Interface (KPFui) leverages urban data analytics to inform decision-making in building and city design, aiming for more livable, profitable, equitable, and resilient cities.

One of multiple phases of Utah City’s plan, Block 4 enhances the guiding principles of the development with a focus on mixed-use programming and walkability. The plan is bordered to the west by Utah Lake and celebrates the surrounding nature in its design, integrating parks and plazas throughout. Block 4 occupies a central location in the southern portion of the plan, facing the main pedestrian promenade to the north and existing single-family homes to the south. In addition to a focus on walkability, users have access to the newly constructed Vineyard Station frontrunner and Bay A bus station, as well as vehicular infrastructure.

Block 4’s layout is comprised of four parcels, with three buildings, a parking lot, and a central plaza with integrated pathways and green space. The variety of uses in each building contributes to the activity, diverse tenant makeup, and business offerings of Utah City. The first parcel slated for development on the block includes a 40,000 square foot grocer, disguised with townhomes and boutique retail around its perimeter to activate all four sides of the building. The parcel also includes amenity space for the community. The other parcels on the block include a 23-story residential building with an expansive mixed-use parking podium, followed by a 12-story office building above a retail podium.

Currently designed as a temporary surface lot with over 200 parking spaces, the final parcel in the plan is designated as a future residential development site that will aid in Utah City’s growth, with the potential to add a multi-story parking structure.










Sandwiched between the FrontRunner Vineyard train station and Utah Lake is Vineyard Station. The specific phase of the project is 478,217 sq. ft. and has 453 units. Several parking lots are paved, and subcontractors are working on site. Rimrock is the designated general contractor.



Vineyard Announces New 40,000 Square Foot Grocery Store in Utah City


The Daily Herald - Full Article @ https://utahcity.com/2023/09/08/vine...-in-utah-city/

...It has been announced that Vineyard will be getting a grocery store.

Utah City development, Vineyard and Lee’s Marketplace announced a joint effort to form “Bella’s Market” a 40,000-square-foot custom concept store.

It will be located at 800 North near the FrontRunner station and the Huntsman Cancer Institute inside the Utah City development.

“We’ve partnered with Lee’s Marketplace because they run clean and respected stores with excellent customer service. They understand the needs of Utah families and share our ambition to create a unique experience that caters to the needs of the community and aligns with the vision of Utah City,” said Abel Porter, director of retail operations for Bella’s Market.

Bella’s Market will be one of the first amenities added to the new mixed-use Utah City development. The operating partnership will be with Lee’s, but Bella’s Market will be a custom store offering local products and essential staples, set within a store that is designed for gathering...

...“Our goal is to create a bright, clean gathering place for guests, with the same family-friendly pricing and service they’ve come to expect of a Lee’s Marketplace, but customized to Utah City with extra, unique touches and offerings that can only be found in this one location.”

According to a press announcement, the new market will have an elevated but approachable feel, incorporating large windows and natural light, greenery, freshness, and variety, with the ability to evolve with the needs of the growing community...

...Architecture and design are currently underway and construction on the new grocery store is anticipated to begin in 2024 with a completion date sometime in 2025...


Last edited by delts145; Apr 28, 2024 at 1:27 PM.
Reply With Quote
     
     
  #8724  
Old Posted May 1, 2024, 12:36 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
Southern Metro - LIVE CAM SHOTS OF TODAY - B.Y.U. Provo Campus - New Harris Fine Arts Center

Today's LIVE STREAMS From 3 Perspectives

https://cfac.byu.edu/arts-building


The New Fine Arts Building will also host academic spaces, galleries, performance spaces, media viewing rooms, a cinema and a production studio. The other current occupant of the HFAC — the School of Music — has moved to the new music building.

“The arts and music programs are beacons of excellence for the university,” said Shane Reese, BYU academic vice president, in the release. “We look forward to these two new beautiful buildings, which will accentuate the amazing talents of our students, faculty and staff who work in that college.”

The arts building will house a large collaborative hub for department of design students as well as multiple art and design galleries. There will also be a combination lobby and student gathering space.

A six-station lactation room will accommodate students and their families as well as patrons.

“The new building will create proximity and more opportunities for collaboration and student mentoring,” said Ed Adams, dean of the College of Fine Arts and Communications. “Our faculty and staff are now spread over five floors and are located at the far ends of the Harris Fine Arts Center from each other.”

The project is expected to be completed toward the end of 2025.

Big D Construction has been selected as the general contractor for the project, with HKS Architects as the architecture firm.

The college will temporarily occupy the former Provo High School, located on University Avenue, while the new arts building is being constructed.

The HFAC was dedicated in 1965 and houses four of the college’s six academic units. The newly completed School of Music, which also used the building has moved into the new music building upon its completion at the end of 2022.



Renderings of the new Arts Center currently beginning construction





https://universe.byu.edu/2022/06/06/...-replace-hfac/

.
Reply With Quote
     
     
  #8725  
Old Posted May 6, 2024, 12:51 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
Update - Northern Metro - Layton L.D.S. Temple

Completed - Public Open House, Friday 19, April - Saturday 1, June


On July 15, 2019, it was announced that this L.D.S. Temple will be constructed on an 11.8-acre property located at the corner of Oak Hills Drive and Rosewood Lane on the southeast side of Layton. Also noted that the plans called for a three-story temple of 90,000 square feet.

Timline Photo Highlights below along with the completed interiors. For A Complete Photo Timeline, @ https://churchofjesuschristtemples.o...e/photographs/



Project Overview

Quote:
Mason Nichols is a Grand Rapids, Mich.-based writer and editor who has covered the precast concrete industry since 2013. - https://www.pci.org/PCI/PCI/Project_...aspx?ID=259731

Situated on nearly 12 acres and encompassing more than 95,000 ft2, the Layton Utah Temple is the nineteenth temple of The Church of Jesus Christ of Latter-day Saints built in Utah and the second built in Davis County. The structure, which features 386 precast concrete panels and 56 glass-fiber-reinforced concrete (GFRC) panels, rises approximately 80 ft to the top of its highest wall and about 202 ft above grade at the west tower spire. A statue on top of the west tower brings the height to 215 ft.


Durability, Reliability, Community
The temple is located in an area at high risk for earthquakes. To meet the project’s seismic design requirements, more than half of the precast concrete panel skin was installed over poured concrete shear walls. With this approach, the exterior precast panel system had to be designed to adapt to both rainscreen and spray-applied foam insulation vapor envelope techniques. According to Jeff Dodge, AIA, LEED AP, senior associate with Naylor Wentworth Lund Architects, precast concrete was the material of choice for the work for several reasons.

“Precast concrete offered a cost-effective approach to exterior wall construction, especially when used in conjunction with spray-applied foam insulation as both a thermal and moisture barrier,” he said. “It was also selected for material durability and long-term ease of maintenance. Additionally, because the temple is located along flight paths of Hill Air Force Base, we also selected precast for its acoustical properties and inherent mass.”

Willis Construction Co. of San Juan Bautista, California, manufactured the precast concrete building envelope with carved seedling and cherry blossom details inspired by local orchard. This design treatment is also present inside of the temple, carrying the motif throughout the entire structure. The precast concrete and GFRC panels boast a light sandblasted finish and were matched for color, giving the temple its bright, welcoming appearance.

“A religious building such as this one is a beautiful asset to the community,” Dodge said. “It will provide many years of worship opportunities to the church where worshiping God within the walls of the temple is central to their faith. Temples also draw visitors from all over the world, which promotes the positive visibility of the local community and the strong values prevalent therein.”

17 June 2020 Courtesy of Rory Wallwork
Complete Photo Timeline @ https://churchofjesuschristtemples.o...e/photographs/



3 October 2020 Courtesy of Rory Wallwork


November 22, 2020 Courtesy of Marshall Thompson


15 January 2021 Courtesy of Rory Wallwork


8 April 2021 Courtesy of Greg


20 June 2021 Courtesy of Marshall Thompson


9 February 2022 Courtesy of Clint Morris


9 March 2022


9 March 2022


17 March 2022


12 April 2022


28 May 2022


26 September 2022 Courtesy of Rory Wallwork


6 November 2022 Courtesy of Marshall Thompson



June 2023, Courtesy of Rory Wallwork




August 2023, Courtesy of Paul Wardrop




September 2023, Courtesy of Tyler Lloyd





Structure Exterior & Interiors Completed - Open House & Photo Tour TBA


October 2023, Courtesy of Josh Packer




October 2023, Courtesy of Jon Hansen




November 2023, Courtesy of Rory Wallwork




May 2024, Courtesy of Jake Garn





May 2024, INTERIORS,

Courtesy of 2024 | INTELLECTUAL RESERVE, INC. @ https://churchofjesuschristtemples.o...e/photographs/


Foyer


Tiffany Studio stained-glass window, circa 1915, purchased from a United Presbyterian Church in Armenia, New York, entitled “The Resurrection”


Waiting Area


Grand Staircase


Hallway


Chapel


Bride's Room


Baptistry


Baptistry Artwork Detail


Instruction Room


Sealing Room


Chandelier and Art Glass Detail


Celestial Room


Celestial Room


Complete Photo Timeline @ https://churchofjesuschristtemples.o...e/photographs/

.
Reply With Quote
     
     
  #8726  
Old Posted May 7, 2024, 1:51 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
Sugar House District Update, The Residences at Sugar Alley

Sugar Alley is a 186-unit mixed-use development located in Salt Lake City’s booming Sugarhouse District.
Class A amenities will be accompanied with 17,332 square feet of ground-floor retail.




Rendering of the Eastern side of Sugar Alley as seen from Highland Drive.



Rendering of the Eastern side of Sugar Alley as seen from Highland Drive.



Rendering of the Eastern side of Sugar Alley as seen from Highland Drive and the corner of the soon-to-be-continued Wilmington Ave.,
which will separate Sugarmont Apartments and Sugar Alley.




Rendering of the Sugar Alley 'Residences at Sugar Alley' entry/ lobby interior for the apartments.



Rendering of the Sugar Alley 'Residences at Sugar Alley' entry/ lobby for the apartments. East side as seen from Highland Drive.



Rendering of the Sugar Alley pedestrian walkway and street cafes/ restaurants separating Sugar Alley and 'The Vue at Sugar House Crossing.'
Northeast corner of Sugar Alley as seen from Highland Drive.




Rendering of the Sugar Alley pedestrian walkway and street cafes/ restaurants separating Sugar Alley and 'The Vue at Sugar House Crossing.'
Northwest corner of Sugar Alley.






August 2022 - Last round of progress photos before the devastating October fire










Photos Courtesy of Kier Construction @ https://www.kier.org/our-work/multi-...y-micro-units/



November 2022 - Post-fire destruction - Demolition and removal of destroyed materials down to the concrete podium


February 8, 2023


Massive $59M Sugar House fire most likely caused by heaters or electrical issue, report says


KSL.com - By Pat Reavy Full Article @ - https://www.ksl.com/article/50574855...e-report-says-

SALT LAKE CITY — The cause of a massive fire at an apartment complex under construction in Sugar House last fall, which prompted hundreds of tenants to be evacuated from an adjacent complex for days and some businesses to close for two weeks, is officially considered to be "undetermined."

That's according to a final report on the incident.

However, the most likely culprits are either large space heaters that were placed on the upper floors just days prior to the fire igniting, or an electrical problem, according to investigators from the Salt Lake City Fire Department and the Bureau of Alcohol, Tobacco, Firearms and Explosives...






July 18,2023
Cleanup Progressing and Reconstruction Beginning

Sugar House Community Council Update: Re-construction is underway with work occurring both on and off the site. Minor repairs are being made on the parking garage while new wall panels are currently under construction at another construction site. Due to this and other factors the re-build is expected to be completed much faster than the original construction, in about eighteen months. This will be a five-story building containing 200 luxury apartments with the ground floor dedicated to retail, including restaurants and a bike shop.








Photos By Paniolo Man


August 30, 2023

Photo By Taylor Anderson @ BuildingSaltLake.com - https://buildingsaltlake.com/constru...-october-fire/



September 24, 2023




Photos By Paniolo Man



November 10, 2023


Photo By Paniolo Man



March 29, 2024


Photo By Paniolo Man



April, 2024












Photos By Kier Construction @ https://www.kier.org/our-work/multi-...t-sugar-alley/

.
Reply With Quote
     
     
  #8727  
Old Posted May 7, 2024, 8:57 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
Quote:
Originally Posted by Orlando View Post
Utah’s Tech Hub Powers America’s Hottest Job Market, Wall Street Journal Ranking Finds...

https://www.wsj.com/economy/jobs/uta...finds-e67d0171


.......
Reply With Quote
     
     
  #8728  
Old Posted May 7, 2024, 9:39 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
Quote:
Originally Posted by Atlas View Post
I have updated the SLC Wikipedia page with a new skyline shot taken yesterday, taken from exactly the same angle as the old one.

Old: 2012


New: 2024

Photo By Atlas

.
Reply With Quote
     
     
  #8729  
Old Posted Yesterday, 1:32 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,404
Quote:
Originally Posted by Atlas View Post

Edit: nice aerial (source)

.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 5:59 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.