Old Posted Jul 4, 2013, 6:29 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Ohhh alright. I thought the plan was to build it on top. But that would be a further expansion, right? They put up this part, then build the hotel tower along with a much small section of convention space to adjoin to what is already going up?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #122  
Old Posted Jul 4, 2013, 7:02 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
With equipment/offices and work taking place could this thread be edited to "Under Construction?

Excavators are in the process of removing the parking lot as we post.
__________________
♥ ♥
Reply With Quote
     
     
  #123  
Old Posted Jul 4, 2013, 7:29 PM
chrisallard5454's Avatar
chrisallard5454 chrisallard5454 is offline
Registered User
 
Join Date: May 2009
Location: Winnipeg
Posts: 2,047
Quote:
Originally Posted by Cyrodill View Post
With equipment/offices and work taking place could this thread be edited to "Under Construction?

Excavators are in the process of removing the parking lot as we post.
Not that the title matters at all, but construction as per SSP regulations isn't official until the building starts rising above grade. So once the foundation is poured, piles go in, and then the first floor is made, then you can request "Construction" status.
__________________
2017 Tryout for DEL 2 Kassel Huskies
Reply With Quote
     
     
  #124  
Old Posted Jul 4, 2013, 7:32 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,441
Quote:
Originally Posted by Cyrodill View Post
With equipment/offices and work taking place could this thread be edited to "Under Construction?

Excavators are in the process of removing the parking lot as we post.
Dare I propose champagne as this represents the actual, physical removal of a MAJOR surface parking lot from downtown?
Reply With Quote
     
     
  #125  
Old Posted Jul 4, 2013, 7:37 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Is that really SSP regulations? The only forum that actually follows that guideline is the BC/Vancouver section. Hell, Toronto lists their buildings as UC before the shovel is even in the ground. I'd say once heavy work starts it is construction, but at least once piles are driven, that should certainly be construction. I think even Vancouver says once excavation is complete and concrete pour starts, that is construction. I've never heard a single person (until now) say that UC is only after a building is above grade.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #126  
Old Posted Jul 4, 2013, 7:38 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by Mininari View Post
Dare I propose champagne as this represents the actual, physical removal of a MAJOR surface parking lot from downtown?
Yes Miniari, I coudn't agree more ,one lot to be eradicated!

Sorry that SSP regulations forbid me to say it was under construction as an expert has pointed it out to me.
__________________
♥ ♥
Reply With Quote
     
     
  #127  
Old Posted Jul 4, 2013, 7:40 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by Chadillaccc View Post
Is that really SSP regulations? The only forum that actually follows that guideline is the BC/Vancouver section. Hell, Toronto lists their buildings as UC before the shovel is even in the ground. I'd say once heavy work starts it is construction, but at least once piles are driven, that shuld certainly be construction. I think even Vancouver says once excavation is complete and concrete pour starts, that is construction. I've never heard a single person (until now) say that UC is only after a building is above grade.

Thx for clarifying that for me Chad.
__________________
♥ ♥
Reply With Quote
     
     
  #128  
Old Posted Jul 4, 2013, 7:47 PM
chrisallard5454's Avatar
chrisallard5454 chrisallard5454 is offline
Registered User
 
Join Date: May 2009
Location: Winnipeg
Posts: 2,047
Quote:
Originally Posted by Chadillaccc View Post
Is that really SSP regulations? The only forum that actually follows that guideline is the BC/Vancouver section. Hell, Toronto lists their buildings as UC before the shovel is even in the ground. I'd say once heavy work starts it is construction, but at least once piles are driven, that should certainly be construction. I think even Vancouver says once excavation is complete and concrete pour starts, that is construction. I've never heard a single person (until now) say that UC is only after a building is above grade.
Hey, only re-iterating what I was informed of by a moderator when I asked the same question. I agree with you, but those are the "Rules". I personally don't care either way.
__________________
2017 Tryout for DEL 2 Kassel Huskies
Reply With Quote
     
     
  #129  
Old Posted Jul 4, 2013, 7:57 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I know. I wasn't being rude or judgey, just saying my feelings and observations on the matter. Sorry if I coneyed rudeness!
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #130  
Old Posted Jul 4, 2013, 8:34 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
It was a simple question. Maybe a MOD on "Our" boards will clarify the reg.? Not that it means anything? It appears "some" posters want to moderate, I've been told many times that's a no, no by Many posters.? Hey what do I know ..I'm not a "MOD".
__________________
♥ ♥
Reply With Quote
     
     
  #131  
Old Posted Jul 4, 2013, 9:31 PM
SKYSTHELIMIT's Avatar
SKYSTHELIMIT SKYSTHELIMIT is offline
Registered User
 
Join Date: Apr 2008
Location: Vancouver
Posts: 866
Quote:
Originally Posted by Chadillaccc View Post
Is that really SSP regulations? The only forum that actually follows that guideline is the BC/Vancouver section. Hell, Toronto lists their buildings as UC before the shovel is even in the ground. I'd say once heavy work starts it is construction, but at least once piles are driven, that should certainly be construction. I think even Vancouver says once excavation is complete and concrete pour starts, that is construction. I've never heard a single person (until now) say that UC is only after a building is above grade.
I thought this rule came about surrounding the debacle on fourth in Calgary which was a pit for so many years and having a few starts and stops that the mods became gun shy with the title "Under Construction" but either way we know this is going ahead and it is very exciting.
__________________
West Coastin'
Reply With Quote
     
     
  #132  
Old Posted Jul 4, 2013, 9:44 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by skysthelimit View Post
i thought this rule came about surrounding the debacle on fourth in calgary which was a pit for so many years and having a few starts and stops that the mods became gun shy with the title "under construction" but either way we know this is going ahead and it is very exciting.

exactly.
__________________
♥ ♥
Reply With Quote
     
     
  #133  
Old Posted Jul 4, 2013, 9:53 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,742
Pretty sure I've seen some other threads with "SITE PREP" as the status of the project. Seems fitting here. Denotes that there's action happening but not full on construction of the building.
Reply With Quote
     
     
  #134  
Old Posted Jul 4, 2013, 11:55 PM
vid's Avatar
vid vid is offline
I am a typical
 
Join Date: Apr 2004
Location: Thunder Bay
Posts: 41,172
The rules for the diagram system state the building must have a completed foundation and be rising above grade for the status of "Under Construction".

Within the forums, I think it is up to local moderators.
Reply With Quote
     
     
  #135  
Old Posted Jul 5, 2013, 3:08 AM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 5,888
As much as I would like to see surface lots put to better use I am not cheering for developments that are reducing available parking after completion while also increasing demand. This is not a sustainable practice and will catch up to us sooner than later if Winnipeg keeps allowing it. Cheering on the removal of surface parking lots it sort of similar to saying we should get rid of all the substations downtown as they are ugly and lead to dead blocks. Both parking and substations are important infrastructure pieces that are needed to make a successful community.
Reply With Quote
     
     
  #136  
Old Posted Jul 5, 2013, 3:45 AM
chrisallard5454's Avatar
chrisallard5454 chrisallard5454 is offline
Registered User
 
Join Date: May 2009
Location: Winnipeg
Posts: 2,047
Quote:
Originally Posted by CoryB View Post
As much as I would like to see surface lots put to better use I am not cheering for developments that are reducing available parking after completion while also increasing demand. This is not a sustainable practice and will catch up to us sooner than later if Winnipeg keeps allowing it. Cheering on the removal of surface parking lots it sort of similar to saying we should get rid of all the substations downtown as they are ugly and lead to dead blocks. Both parking and substations are important infrastructure pieces that are needed to make a successful community.
So are proper Bike Lanes, Rapid Transit, Car Pool Specific Locations, and Shuttle Locations. But there don't seem to be any of these locations downtown. (Except Assiniboine Avenue).

I would say that we have bigger problems than lack of parking at the moment or any time in the future. The single person car is a phenomenon that will soon switch to more efficient means of space.
__________________
2017 Tryout for DEL 2 Kassel Huskies
Reply With Quote
     
     
  #137  
Old Posted Jul 5, 2013, 4:49 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Quote:
Originally Posted by vid View Post
The rules for the diagram system state the building must have a completed foundation and be rising above grade for the status of "Under Construction".

Within the forums, I think it is up to local moderators.
Maybe that is the rules, but obviously not what is followed. Vancouver's Turn (Trump Vancouver) has been listed as UC since they re-started excavation last year. It only reached grade a few weeks ago. I can cite dozens of other precedents, including Heritage Landing, Centre Pointe, and Glass House.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #138  
Old Posted Jul 5, 2013, 1:25 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,728
Quote:
Originally Posted by CoryB View Post
As much as I would like to see surface lots put to better use I am not cheering for developments that are reducing available parking after completion while also increasing demand. This is not a sustainable practice and will catch up to us sooner than later if Winnipeg keeps allowing it. Cheering on the removal of surface parking lots it sort of similar to saying we should get rid of all the substations downtown as they are ugly and lead to dead blocks. Both parking and substations are important infrastructure pieces that are needed to make a successful community.
There will be approx 150 parking stalls included in the new addition replacing the lost stalls of the old parking lot.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #139  
Old Posted Jul 5, 2013, 2:05 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 5,888
Quote:
Originally Posted by Biff View Post
There will be approx 150 parking stalls included in the new addition replacing the lost stalls of the old parking lot.
Yes, the convention centre expansion included parking, unlike Project W, the issue though is 150 spaces is less than what was there before and that parking lot was often full, even on weekends. The additional convention centre space is hoping to attract more people, which in turn means more cars yet the amount of space available has decreased.

Also just because other things are currently lacking downtown as chrisallard5454 points out that does not mean we should turn a blind eye to what is going to make downtown a vibrant community long term.
Reply With Quote
     
     
  #140  
Old Posted Jul 5, 2013, 5:19 PM
chrisallard5454's Avatar
chrisallard5454 chrisallard5454 is offline
Registered User
 
Join Date: May 2009
Location: Winnipeg
Posts: 2,047
Quote:
Originally Posted by CoryB View Post
Yes, the convention centre expansion included parking, unlike Project W, the issue though is 150 spaces is less than what was there before and that parking lot was often full, even on weekends. The additional convention centre space is hoping to attract more people, which in turn means more cars yet the amount of space available has decreased.

Also just because other things are currently lacking downtown as chrisallard5454 points out that does not mean we should turn a blind eye to what is going to make downtown a vibrant community long term.
And yet our most vibrant community, with possibly the largest constant population is Osbourne Village. It manages to be so without an abundance of parking. How many parkades exist in the Village? How many parking lots exist, outside of private resident lots and Safeway? There may be a few, but nowhere near the amount that is downtown.

Winnipeg still seems to have a lot more parking lots than any other Canadian city I have been to, so you really have nothing to worry about.

If worst came to worst and every lot was developed (which would be a godsend for me personally) then the city would just be forced to come up with better transit services to people who currently drive.

Oh, and Glasshouse is building a five story parkade, so there is the offset that you are looking for.
__________________
2017 Tryout for DEL 2 Kassel Huskies
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 1:40 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.