SAN ANTONIO │ San Pedro Creek │ 2-Mile Redevelopment │ Under Construction




Quote:
With redevelopment of the San Antonio River nearing completion, Bexar County is turning its attention to San Pedro Creek.

Commissioners Court on Tuesday plans to dramatically reverse the fortunes of San Pedro Creek . Backed by a court majority, County Judge Nelson Wolff will propose a $175 million ecosystem restoration on a 1.5 mile segment of the 3 mile creek.

The court will seek engineering designs now that a $760,000 study has concluded the project is challenging yet doable. Officials want the creek to be a linear urban park, retaining its flood-control role while providing new recreational amenities like those on the river's Museum Reach and Mission Reach.

Right-of-way would have to be acquired and myriad stakeholders consulted, but construction could start in 2016. By 2018, the creek would have walkways, landscaping and perhaps a performance venue in the stretch between Fox Tech High and South Alamo Street.

Smith said the county has $125 million available to launch the effort.



Last edited by sirkingwilliam; May 21, 2013 at 6:16 AM.
Reply With Quote
     
     
  #2  
Old Posted May 21, 2013, 4:45 AM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,887
delete

Last edited by sirkingwilliam; May 21, 2013 at 5:21 AM.
Reply With Quote
     
     
  #3  
Old Posted May 21, 2013, 5:16 AM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,887
Rendering of the proposed new linear park planned for downtown.



Larger version
Reply With Quote
     
     
  #4  
Old Posted May 21, 2013, 5:22 AM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,887
Credit: hannah_banana

SAN ANTONIO FEDERAL COURTHOUSE


Quote:
San Antonio, TX

A GSA Design Excellence project, the new San Antonio Courthouse is designed to generate civic pride and a dignified presence that captures the cultural spirit of San Antonio through its use of local vernacular and natural materials.

The project replaces an outdated courthouse with a modern, 110,000-square-foot state of the art facility. A key element of our design focuses on interior courtyard and connection to the adjacent San Pedro Creek. The $85 million project is currently in design development and slated for completion in 2016.



Reply With Quote
     
     
  #5  
Old Posted May 21, 2013, 5:57 AM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,887
Here's a map I made detailing both the urban segment of the Riverwalk (blue) and the 1.5 mile segment of the San Pedro Creek (red) that will become a linear park.

Reply With Quote
     
     
  #6  
Old Posted May 21, 2013, 6:05 AM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,887
Reply With Quote
     
     
  #7  
Old Posted May 21, 2013, 1:34 PM
Keep-SA-Lame's Avatar
Keep-SA-Lame Keep-SA-Lame is offline
COGSADCAJA- Publicist
 
Join Date: Oct 2008
Location: San Antonio
Posts: 1,105
Woah, $175 million?! Don't get me wrong, I love the renderings and have been dying for them to do something with San Pedro Creek(it's about damn time they've done something), but that is a lot of money for 1.5 miles of park.
Reply With Quote
     
     
  #8  
Old Posted May 21, 2013, 3:27 PM
kornbread kornbread is offline
Registered User
 
Join Date: Oct 2005
Location: Texas
Posts: 825
I would imagine a decent chunk of that cost will go towards aquiring right of way and reconstruction around roads.
Reply With Quote
     
     
  #9  
Old Posted May 21, 2013, 4:48 PM
cole world11 cole world11 is offline
Registered User
 
Join Date: Sep 2012
Location: MSP
Posts: 122
Quote:
Originally Posted by Keep-SA-Lame View Post
Woah, $175 million?! Don't get me wrong, I love the renderings and have been dying for them to do something with San Pedro Creek(it's about damn time they've done something), but that is a lot of money for 1.5 miles of park.
It is but might as well do it right I suppose
Reply With Quote
     
     
  #10  
Old Posted May 21, 2013, 7:16 PM
Keep-SA-Lame's Avatar
Keep-SA-Lame Keep-SA-Lame is offline
COGSADCAJA- Publicist
 
Join Date: Oct 2008
Location: San Antonio
Posts: 1,105
Downtown Blog posted a bunch of new images:

http://blog.mysanantonio.com/downtow...om-river-walk/
Reply With Quote
     
     
  #11  
Old Posted May 21, 2013, 7:18 PM
WorldTexas WorldTexas is offline
Registered User
 
Join Date: Jan 2010
Posts: 225
Quote:
Originally Posted by cole world11 View Post
It is but might as well do it right I suppose
This is just what the west end of downtown needs. Go big or go home!
Reply With Quote
     
     
  #12  
Old Posted May 21, 2013, 7:59 PM
jaga185's Avatar
jaga185 jaga185 is offline
James
 
Join Date: May 2004
Location: San Antonio, Tx
Posts: 2,462
I agree that this is what the west end of downtown needs. It's kind of dreary. Maybe there could be a way to connect the San Pedro creek to the Riverwalk in a green way. I'm trying to look for a good route for it happen, but it's kind of hard.
Reply With Quote
     
     
  #13  
Old Posted May 21, 2013, 8:25 PM
electricron's Avatar
electricron electricron is offline
Registered User
 
Join Date: Aug 2008
Location: Granbury, Texas
Posts: 3,523
Lightbulb

Quote:
Originally Posted by jaga185 View Post
I agree that this is what the west end of downtown needs. It's kind of dreary. Maybe there could be a way to connect the San Pedro creek to the Riverwalk in a green way. I'm trying to look for a good route for it happen, but it's kind of hard.
Much of the way, they're only 4 short blocks apart. Just wide sidewalks shaded with awnings on several streets should be sufficient - plus the future streetcar line could provide a unique connection. I don't think the connections have to be green.
Reply With Quote
     
     
  #14  
Old Posted May 22, 2013, 12:41 AM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,887
I made an imgur album with all the images for this thing.

http://imgur.com/a/UFkQP

Last edited by sirkingwilliam; May 23, 2013 at 12:31 AM.
Reply With Quote
     
     
  #15  
Old Posted May 22, 2013, 1:33 AM
miaht82's Avatar
miaht82 miaht82 is offline
Registered User
 
Join Date: May 2008
Location: The Triangle
Posts: 1,316
Quote:
Originally Posted by electricron View Post
Much of the way, they're only 4 short blocks apart. Just wide sidewalks shaded with awnings on several streets should be sufficient - plus the future streetcar line could provide a unique connection. I don't think the connections have to be green.
To piggyback off of this idea...
The best place (with least amount of work to do) would be along Houston St.; wide sidewalk exist between Camaron and Flores, "park" is in front of Frost, and as long as sidewalks are kept wide and tree-lined in front of the Rand Bldg., it would only be a short half-block to get to the River.

Second would be Nueva (isn't that where SC route is planned for?).
The space behind the new Justice Center and County Courthouse has wide sidewalks and are both tree-filled now; it would just require improvement to the back side of the City Towers (once built) and acquiring some land before or after the River to give access on the North side of Nueva.

Since SP Creek eventually dumps into the SA River off Probandt and Mitchell, I would say just keep the ecosystem restoration and some trails going all the way South (that might be the long term plan), and join the two up. Give the people a riverside running/biking track.

As for the price?
Considering SP Creek is underground from Cesar Chavez to just South of El Paso St., that's quite a bit of land (from hotels) to be purchased in that small stretch.

Looks good.
__________________
The Raleigh Connoisseur
It is the city trying to escape the consequences of being a city
while still remaining a city. It is urban society trying to eat its
cake and keep it, too.
- Harlan Douglass, The Suburban Trend, 1925

Last edited by miaht82; May 22, 2013 at 1:45 AM.
Reply With Quote
     
     
  #16  
Old Posted May 22, 2013, 1:37 PM
El Santo El Santo is offline
Registered User
 
Join Date: May 2013
Posts: 2
A soccer stadium at the old Fox Tech fields would be an awesome addition to DT SA.
Reply With Quote
     
     
  #17  
Old Posted May 22, 2013, 6:44 PM
Spoiler's Avatar
Spoiler Spoiler is offline
Registered User
 
Join Date: Dec 2011
Posts: 910
Quote:
Originally Posted by miaht82 View Post
Considering SP Creek is underground from Cesar Chavez to just South of El Paso St., that's quite a bit of land (from hotels) to be purchased in that small stretch.
Plans don't include uncovering that stretch of creek, just building a shaded walkway.
Reply With Quote
     
     
  #18  
Old Posted May 22, 2013, 7:56 PM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,887
Quote:
Originally Posted by Spoiler View Post
Plans don't include uncovering that stretch of creek, just building a shaded walkway.
Look again, there are two options for that segment.
Reply With Quote
     
     
  #19  
Old Posted May 22, 2013, 8:24 PM
Spoiler's Avatar
Spoiler Spoiler is offline
Registered User
 
Join Date: Dec 2011
Posts: 910
Oops, my bad!

Can someone who is better at reading these plans tell me if the path goes below the streets or not? To me, it looks like the answer is no.

Last edited by Spoiler; May 22, 2013 at 8:48 PM.
Reply With Quote
     
     
  #20  
Old Posted May 22, 2013, 9:56 PM
miaht82's Avatar
miaht82 miaht82 is offline
Registered User
 
Join Date: May 2008
Location: The Triangle
Posts: 1,316
Quote:
Originally Posted by Spoiler View Post
Oops, my bad!

Can someone who is better at reading these plans tell me if the path goes below the streets or not? To me, it looks like the answer is no.
There are a couple of options where it would be below street level. One has a more "natural" look (like the Mission Reach), and the other is a mix (Museum Reach). And like you pointed out in one of the options, there is also the option in that stretch to not expose the creek, just for a walkway to connect and to be spruced up.

Here you can see that it goes below Commerce:



I'm assuming if a path below street level were the case, that it would be able to be closed if overflow were to come up. It already appears that the flow would have to be adjusted seeing as how it is currently a crik or a "leak", not so much a creek.
__________________
The Raleigh Connoisseur
It is the city trying to escape the consequences of being a city
while still remaining a city. It is urban society trying to eat its
cake and keep it, too.
- Harlan Douglass, The Suburban Trend, 1925
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > San Antonio
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 4:38 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.