HomeDiagramsDatabaseMapsForum
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan

Reply

 
Thread Tools Display Modes
     
     
  #1361  
Old Posted Jul 26, 2019, 3:04 PM
plrh plrh is offline
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 275
Quote:
Originally Posted by Winnipegger View Post
Is there actually that big of a water line running through Centreport right now? I was always under the impression that the Centreport area had bedrock/lime stone close to the surface which made it extremely difficult and expensive to service most of the area relative to other parts of the city, leading to it growing slower than originally anticipated by politicians.
Yes, just this year in fact. Tricore is still finishing bringing water to the existing businesses north of Inkster and west of route 90. The line runs down Centreport Way from all the way from St Eustache to that new booster station that is by the Prairie Dog Central.

It is much more expensive than in most of the city to dig there. Sometimes you need to blast the rock. But big excavators can handle most of the material.
Reply With Quote
     
     
  #1362  
Old Posted Jul 26, 2019, 4:25 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 272
Quote:
Originally Posted by plrh View Post
BUSIEST CONSTRUCTION SEASON EVER AT CENTREPORT

https://www.centreportcanada.ca/uplo...1563905282.pdf

Also, that new Pea Processing facility from Burcon is going up on Route 90 and Farmer Rd.
they are claiming that Torque Brewery is in CentrePort???
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:08 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2019, vBulletin Solutions, Inc.