  #101  
Old Posted Jul 2, 2017, 10:29 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
crane



     
     
  #102  
Old Posted Jul 10, 2017, 7:44 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
     
     
  #103  
Old Posted Jul 11, 2017, 2:15 AM
minesweeper minesweeper is offline
Registered User
 
Join Date: Jul 2011
Location: San Francisco
Posts: 613
Quote:
Originally Posted by pseudolus View Post
Saw multiple concrete trucks at the far edge of the Salesforce Tower cam today. The big foundation mat pour, finally?
Some stats on the mat pour from last month:

Quote:
The Balfour Beatty US California Division has successfully completed a concrete pour consisting of 8,218 cubic yards of concrete at the 42-story Transbay Block 9 residential tower project site at 500 Folsom St. in San Francisco. The amount of concrete poured is equivalent to 32 miles of a four-foot-wide sidewalk. The non-stop pour started at 1:59 a.m. on Saturday, June 17 and concluded at 1:56 a.m. on Sunday, June 18. The milestone marks the largest concrete pour on record for the company’s California vertical construction business unit.

Forty-five trucks, driven by 90 drivers on alternating schedules, delivered 888 truckloads of the concrete to five concrete pumps strategically located on the project site. The pour covered a 30,000-square-foot surface area to form the mat foundation situated 75 feet—or six floors—below the ground surface. Concrete thickness of the mat foundation ranged from 10 feet beneath the tower to five feet outside the tower. The mat is also comprised of 2.5 million pounds of reinforcing rebar.
And a video:

Video Link
     
     
  #104  
Old Posted Jul 12, 2017, 4:33 AM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,552
minesweeper - a fantastic video. I've watched concrete pours in my neighborhood in real time. The fast video shows better how complicated the process is.
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
     
     
  #105  
Old Posted Aug 1, 2017, 4:54 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
I also liked the video, thanks!

here are a couple looks into the hole



     
     
  #106  
Old Posted Aug 6, 2017, 6:32 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150


     
     
  #107  
Old Posted Aug 19, 2017, 5:18 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
     
     
  #108  
Old Posted Aug 27, 2017, 7:16 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
     
     
  #109  
Old Posted Sep 10, 2017, 10:13 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
still have to look into the hole for this one

     
     
  #110  
Old Posted Sep 18, 2017, 9:42 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
     
     
  #111  
Old Posted Sep 25, 2017, 9:08 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
     
     
  #112  
Old Posted Oct 8, 2017, 9:00 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
looking into the ever-shallower hole...



the core has emerged above sidewalk level, chasing that of its big sister 400 Folsom into the sky

     
     
  #113  
Old Posted Jan 7, 2018, 12:25 AM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,552
January 6, 2018

There has not been a photo of this construction site posted since October 2017 so I took a walk to see the progress. This is a building that will break the skyline in my view in a few months.

500 Folsom Street by Apollo's Light, on Flickr
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
     
     
  #114  
Old Posted Jan 8, 2018, 8:29 PM
gillynova's Avatar
gillynova gillynova is offline
Registered User
 
Join Date: Mar 2017
Location: Austin / Bay Area
Posts: 2,153
Can't wait to see the progress of this by the end of this year
     
     
  #115  
Old Posted Jan 9, 2018, 7:22 PM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Registered User
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,177
Quote:
Having broken ground at the end of 2016, the 55-story tower and two podium buildings rising along Folsom Street, on Transbay Block 8 between Fremont and First, are now expected to be ready for occupancy in the second quarter of 2019.
http://www.socketsite.com/archives/2...y-block-8.html
     
     
  #116  
Old Posted Jan 14, 2018, 10:04 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
Quote:
Originally Posted by Pedestrian View Post
that refers to 400 Folsom, not 500 Folsom
     
     
  #117  
Old Posted Jan 14, 2018, 10:07 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
not too much change since Jerry's pic...



might as well throw in one of the 'three cores' shots here, since 500 Folsom is the one in the foreground

     
     
  #118  
Old Posted Jan 28, 2018, 8:26 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
     
     
  #119  
Old Posted Feb 11, 2018, 2:52 AM
botoxic botoxic is offline
Registered User
 
Join Date: Dec 2006
Location: The Mission
Posts: 690
This one is painfully slow. Hard to remember it actually started before its neighbor.

Quote:
Originally Posted by ConstructDTLA View Post
     
     
  #120  
Old Posted Feb 11, 2018, 9:11 PM
Fvn Fvn is offline
Registered User
 
Join Date: Nov 2017
Posts: 694
IIRC they had to do some deep grouting (due to neighboring buildings) before they could start the excavation/shoring work. The basement is twice as deep and the shoring system is cutter soil mix wall and secant piles which takes longer to install then a soldier pile wall takes (what its neighbor has). It's at grade now though by the looks of it and should start to fly.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 4:09 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.