SA - C.H. Guenther & Sons HQ's - Former Butter Krust Bakery | 3 floors | 109,000 SF
As seen on HDRC agenda for Oct. 6th,
East elevation
East elevation
North elevation
Site layout
Quote:
HDRC CASE NO: 2010-369
IDENTIFIER: ButterKrust Bakery
ADDRESS: 2201 Broadway
LEGAL DESCRIPTION: NCB 6294 BLK LOT 15 THRU 36
ZONING: I1 RIO-1
PUBLIC PROPERTY: NA
COUNCIL DISTRICT: 2
DISTRICT: RIO-1
LANDMARK: NA
APPLICANT: Tex Liedtka
OWNER: Guenther Development LLC
TYPE OF WORK: Demolition, Renovation & New Construction
REQUEST:
The applicant is requesting conceptual approval for the following:
1) Restoration of the existing core building constructed in 1941, and added to in 1948. The roof will be removed
and replaced on all of the existing buildings that remain. The glass block and brick masonry along Broadway and
along the portions of the original west wall will be cleaned and restored .
2) Large portions of the roof deck, that is structurally unsound, will be replaced. It is necessary to raise the roof
on portions of the existing two-story building to allow room for new HVAC and lighting and attain interior
ceiling heights of 9 to 10 feet.
3) Replace horizontal windows at the bakery floor with new double panel window systems that meet the energy
code, while maintaining the original aesthetics .
4) Construct a new exterior wall along the south face of the 1948 two-story addition due to the impact of the 1965
addition. We would also like to retain the regular window and bay spacing along the south facade.
5) Proposed partial demolition and alterations to the warehouse along Avenue B, added in 1955/1956. The south
180' will be removed in its entirety to allow construction of a new three-story office building. The project
proposes to retain the northern end of the warehouse's steel structure and create a partially covered parking area,
covered outdoor pedestrian walk way and break-out space.
6) Along Avenue B, the project is proposing to retain and restore the lower 6' port ion of wall and clad the columns
with new contrasting brick. Between the columns, we envision galvanized metal planting trellis structures, similar
to those at Pearl parking areas and the Witte Museum parking garage.
7) Demolish the existing loading dock and motor pool buildings, and also demolish two existing structures, not
original to Butter Krust at t he north end of the property.
8) A new three-story, 34,000 square foot office building is proposed directly behind the existing two-story
building at the south end of t he project. The proposed new building will tie to the existing structure via a two
story open vestibule. The face of the three story structure will be 160 feet back from the west curb of Broadway.
This was done to minimize the impact to the original building scale and massing.
9) At the north end of the existing building, the project proposes a new 33,000 sf. two story office building.
Along Broadway this building will notch back to transition the old to the new. The first story will have brick
veneer that will contrast color of the existing building. The decorative brick frieze and coursing patterns used at
the windows will be incorporated in the detailing. The entrance to this building will be on the park side facing
Ave. B.
|
__________________
The Raleigh Connoisseur It is the city trying to escape the consequences of being a city
while still remaining a city. It is urban society trying to eat its
cake and keep it, too.
- Harlan Douglass, The Suburban Trend, 1925
|