They did not complete setting up the second crane at Brookfield over the weekend. Thoughts are it needed to be serviced??
Crane base is in at Smith so that one should be up within a couple weeks
Quote:
Originally Posted by jstarr
Crane is going up today at Smith, as well as the second crane is going back up at Brookfield as per the webcam.
Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.