HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #301  
Old Posted Feb 5, 2020, 11:04 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
https://news.ontario.ca/mto/en/2020/...in-kenora.html

Too bad no timeline (I don’t know if we can trust the original one.)
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #302  
Old Posted Feb 5, 2020, 11:11 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
It says targeting shovels in the ground this summer. Although when I googled this earlier today. There were articles stretching back years saying that same thing. "oh right away, shovels in the ground within months." Going on like that for years.
Reply With Quote
     
     
  #303  
Old Posted Feb 6, 2020, 7:16 PM
rrskylar's Avatar
rrskylar rrskylar is offline
BANNED
 
Join Date: Sep 2004
Location: WINNIPEG
Posts: 7,641
Quote:
Originally Posted by drew View Post
Manitoba's remaining 2-lane part of the TransCanada is much shorter and has much "easier" terrain to contend with in comparison to the stretch from Kenora to MB.

I imagine we are several years away before MB feels any pressure to complete this section, but I would put money down that the highway on both sides of the border will be complete at the same time.

Manitoba has been upgrading the TCH between Winnipeg and Falcon lake over the last several years. I think, in preparation for an increase in the speed limit, and the eventual twinning of the highway.
Bolded: Not so sure about that, couple large hills, a narrow stretch between two lakes, not much different from the Ontario side aside from the blasting that will be required.
Reply With Quote
     
     
  #304  
Old Posted Feb 7, 2020, 12:08 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
That part, we may have to realign PR 301 closer to Falcon Lake to make way for the EB lanes of TCH.

By the way, how do you guys like my signature?
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #305  
Old Posted Feb 7, 2020, 4:20 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
I just saw this:
https://winnipeg.ctvnews.ca/province...lake-1.4800737
In passing reference, MIT said that twinning of the remaining 2-lane section might be back on the table.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #306  
Old Posted Feb 7, 2020, 4:40 PM
Andy6's Avatar
Andy6 Andy6 is offline
Starring as himself
 
Join Date: Mar 2002
Location: Toronto Yorkville
Posts: 9,739
Quote:
Originally Posted by Dengler Avenue View Post
I just saw this:
https://winnipeg.ctvnews.ca/province...lake-1.4800737
In passing reference, MIT said that twinning of the remaining 2-lane section might be back on the table.
It’s just going to be very expensive compared to all the other things the province’s very limited resources could be spent on. But I think they will probably move in this now that Ontario apparently is finally doing so, after half a century of dawdling.
__________________
crispy crunchy light and snappy
Reply With Quote
     
     
  #307  
Old Posted Feb 7, 2020, 4:48 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
I really hope the minority federal government will put in a good amount of cash for both projects.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #308  
Old Posted Feb 7, 2020, 5:03 PM
drew's Avatar
drew drew is offline
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,013
Quote:
Originally Posted by Andy6 View Post
It’s just going to be very expensive compared to all the other things the province’s very limited resources could be spent on. But I think they will probably move in this now that Ontario apparently is finally doing so, after half a century of dawdling.
The "gotta save face highway project" trumps all other road projects in MB. As was evidenced by the timing of when the Virden to Sask. border twinning was complete.
Reply With Quote
     
     
  #309  
Old Posted Feb 7, 2020, 5:07 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by drew View Post
The "gotta save face highway project" trumps all other road projects in MB. As was evidenced by the timing of when the Virden to Sask. border twinning was complete.
Ha. The political liability of going from a 4 lane road in a neighbouring jurisdiction to a 2 lane road in Manitoba is too great for any politician to bear.
Reply With Quote
     
     
  #310  
Old Posted Feb 7, 2020, 6:11 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
The Province will be holding public consults on the Portage Bypass bridge replacement thing. I wonder if they'll include plans for the #1/16 interchange and the other interchange in between the two locations.
Reply With Quote
     
     
  #311  
Old Posted Feb 7, 2020, 6:12 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
Quote:
Originally Posted by drew View Post
The "gotta save face highway project" trumps all other road projects in MB. As was evidenced by the timing of when the Virden to Sask. border twinning was complete.
Gotta keep up with the Jones! haha

All the article says is a one liner at the end that someone at the Province said they are investigating future twinning. Which is extremely broad.
Reply With Quote
     
     
  #312  
Old Posted Feb 7, 2020, 6:13 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
Even if there’s nothing on 1 & 16, one should still go in and say, “While you’re at it, you must also build the interchange there. The fatality rates over the past few years are simply unacceptable.”
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #313  
Old Posted Feb 7, 2020, 8:50 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by bomberjet View Post
The Province will be holding public consults on the Portage Bypass bridge replacement thing. I wonder if they'll include plans for the #1/16 interchange and the other interchange in between the two locations.
I saw the press release on this thing... honestly what kind of "consultation" do you need on replacing an existing woefully inadequate overpass? It's like holding a consultation on fixing a burned out lightbulb... just do it. This seems like a stalling tactic more than anything... "look guys! we're working on it!"
Reply With Quote
     
     
  #314  
Old Posted Feb 7, 2020, 8:58 PM
drew's Avatar
drew drew is offline
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,013
^ likely stalling for time.
Reply With Quote
     
     
  #315  
Old Posted Feb 7, 2020, 9:49 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
So just take the time. What could they possibly need to change, unless it's a rethink of the larger area. Which Biff said may be in the cards. At there was the thought.
Reply With Quote
     
     
  #316  
Old Posted Feb 12, 2020, 4:43 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
https://www.grandforksherald.com/new...ravel-advised1
Not a Manitoban highway, but still closely related.
The news article says that I-29 is closed from the border to Fargo, but Google Maps shows the closure to be North-Dakota-wide (except certain pockets).
That’s 350 km of 4-lane divided freeway closed! It’s actually as bad as when Ontario Provincial Police closes large section of TCH (11 or 17, many times both).
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #317  
Old Posted Feb 12, 2020, 6:25 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
Not saying it's routine, but usually happens every winter. Same with #1 west of Winnipeg. Closes sometimes from Winnipeg to the SK border. There's even gates that are closed. Such as at the west end of Headingly.

Mostly winds this time. Haven't had blizzard conditions yet this year. No big storms either.
Reply With Quote
     
     
  #318  
Old Posted Feb 12, 2020, 7:51 PM
1ajs's Avatar
1ajs 1ajs is online now
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 25,881
as someones whos been stranded during road closers on i29 its pritty bad when they finaly close it...
Reply With Quote
     
     
  #319  
Old Posted Feb 12, 2020, 11:21 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,782
Looks like a lot of highways were closed overnight and this morning. Hwy 75. #1 to Brandon. And some others.
Reply With Quote
     
     
  #320  
Old Posted Apr 6, 2020, 3:22 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
Not sure if this is the best time to ask this.
Highway projects after the pandemic, anyone?
I mean, does anyone think we will see a few mega ones after the pandemic is over?
Same old ones on my mind: PTH 100 (complete grade separation), PTH 190, TCH (traffic light removals and twinning), PTH 75 (complete grade separation and Morris bypass).
PS: Interestingly, PTH 32 twinning is happening even right now.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 2:13 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.