Well, I've been trying to not do the "first post on the page" thing as often, but it's been two days since the last post so here's some Telus Sky.
__________________
Strong & Free
Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Only one more below grade floor to pour until The One reaches street level
Source: Benito on urbantoronto.ca
Can we expect this thing to start shooting up once at street level? Feels like progress has taken forever, especially with CIBC rising so quickly to the south.
I would expect the podium start late October and take us through until the end of March or April before the tower starts to rise. If we have a mild winter it could be sooner, if we have a bad winter it could be later.
Nice updates guys. I also agree the timeframe on construction is so long. One Bloor East takes the cake, that tower was under construction for 6 or 7 years. Beyond ridiculous, and even now it feels not 100% complete.