Wow, they are really cruising. I'm guessing the intent is to have it student ready by September?
Reply With Quote
     
     
  #42  
Old Posted Feb 9, 2014, 4:54 AM
Robag Robag is offline
Registered User
 
Join Date: Aug 2010
Location: Regina
Posts: 301
Quote:
Originally Posted by Treesplease View Post
Wow, they are really cruising. I'm guessing the intent is to have it student ready by September?
Actually, from what I hear from one of our maintenance guys at the U, the buildings are almost three weeks behind due to the cold weather. The cranes haven't been going every day because of temp and wind.
Reply With Quote
     
     
  #43  
Old Posted Feb 9, 2014, 4:39 PM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 948
I just noticed that this thread is still under "Site Preparation". Not that it really matters, but does anyone know how to get that changed before the towers are completed?
Reply With Quote
     
     
  #44  
Old Posted Feb 10, 2014, 12:31 AM
one_brick_at_a_time's Avatar
one_brick_at_a_time one_brick_at_a_time is online now
Registered User
 
Join Date: Apr 2009
Location: Regina/Toronto
Posts: 2,245
Once the first two towers are completed are they moving right along into the next two?
Reply With Quote
     
     
  #45  
Old Posted Feb 10, 2014, 5:02 AM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Quote:
Originally Posted by one_brick_at_a_time View Post
Once the first two towers are completed are they moving right along into the next two?
I'll find out.
Reply With Quote
     
     
  #46  
Old Posted Feb 10, 2014, 3:59 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Quote:
Originally Posted by one_brick_at_a_time View Post
Once the first two towers are completed are they moving right along into the next two?
I guess not. (Maybe 6-8 years from now though.)
Reply With Quote
     
     
  #47  
Old Posted Feb 10, 2014, 5:13 PM
James Gablan James Gablan is offline
Registered User
 
Join Date: Jun 2013
Posts: 53
6-8 years in university talk means it will never ever happen. The project will be abandoned and something completely unrelated and incompatible with the existing use will be built there.

I am looking into my crystal ball and see an electrical substation.
Reply With Quote
     
     
  #48  
Old Posted Feb 10, 2014, 5:29 PM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
Quote:
Originally Posted by SkydivePilot View Post
I guess not. (Maybe 6-8 years from now though.)
http://www.uofrresidence2012.com


A total of eight towers are slated for the site as per the drawings ,we must always have faith in these projects
Reply With Quote
     
     
  #49  
Old Posted Feb 10, 2014, 5:46 PM
Festivus Festivus is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,160
Quote:
Originally Posted by thefourthtower View Post
http://www.uofrresidence2012.com


A total of eight towers are slated for the site as per the drawings ,we must always have faith in these projects
I have still have faith in the Chateau Qu'Appelle on the corner of Albert and College. Just need to tear down that Museum first.
Reply With Quote
     
     
  #50  
Old Posted Feb 10, 2014, 6:00 PM
Dougler306 Dougler306 is online now
Registered User
 
Join Date: Oct 2011
Location: Regina
Posts: 452
I don't agree with fourthtower but i believe the U of R will stick to there master plan. As for when the next 2 towers get built..hmm perhaps after collage ave. revitalization project, as everything is based off funding. If enrollment keeps up where it is, they will have to build another one on campus, as U of R's goal is to have 35%( don't quote me) of it's students living on campus. I believe its only 10% or under right now with the current situation.

I'm sure someone mentioned it before but I was curious as how the towers will be attached to the luther building, I believe someone said a walkway over top?

Also id rather have that museum there then some stuccoed up...box like hotel...
Reply With Quote
     
     
  #51  
Old Posted Feb 10, 2014, 6:09 PM
HomeInMyShoes's Avatar
HomeInMyShoes HomeInMyShoes is offline
arf
 
Join Date: May 2005
Location: File 13
Posts: 13,984
^It was hardly a stuccoed up box-like hotel.

Chateau Qu'Appelle is one of the more interesting stories in Regina history.
__________________

-- “We heal each other with kindness, gentleness and respect.” -- Richard Wagamese
-- “Unless someone like you cares a whole awful lot, Nothing is going to get better. It's not.” -- Dr. Seuss
Reply With Quote
     
     
  #52  
Old Posted Feb 10, 2014, 7:07 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Quote:
Originally Posted by James Gablan View Post
6-8 years in university talk means it will never ever happen. The project will be abandoned and something completely unrelated and incompatible with the existing use will be built there.

I am looking into my crystal ball and see an electrical substation.
Construction of the residence at the Language Institute started in late 1988; the newer twin residences started during the winter of '02-03; and the latest was this past spring. So ya, more residences in about a decade or so.

College west was completed around 1972.

Hey, Rome wasn't built in a day.
Reply With Quote
     
     
  #53  
Old Posted Feb 12, 2014, 11:08 PM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
I believe they are now working on the 9th and 10th floors of 13 on the towers, the conjoining 6 floor wing concrete is finished I believe.

The basement parkade concrete is now done as well.
Reply With Quote
     
     
  #54  
Old Posted Feb 13, 2014, 4:40 PM
Dan0myte Dan0myte is offline
Registered User
 
Join Date: Jul 2009
Posts: 927
Quote:
Originally Posted by HomeInMyShoes View Post
^It was hardly a stuccoed up box-like hotel.

Chateau Qu'Appelle is one of the more interesting stories in Regina history.
I'm pretty sure he was saying that tongue-in-cheek. Sometimes sarcasm is hard to type.
Reply With Quote
     
     
  #55  
Old Posted Feb 13, 2014, 5:44 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by Dan0myte View Post
I'm pretty sure he was saying that tongue-in-cheek. Sometimes sarcasm is hard to type.
Interesting! Never knew there was a building like that! Or that the pilings were still there! The more you know. However I feel that it would of really added to the character of the city. If it AND the Sask were both completed.
Reply With Quote
     
     
  #56  
Old Posted Mar 13, 2014, 6:10 PM
Dougler306 Dougler306 is online now
Registered User
 
Join Date: Oct 2011
Location: Regina
Posts: 452
Small photo update of U of R towers. It appears to me that they are pouring the 13th or final for the north tower and very close on the south tower. Steel work has begun on the outside along with windows.



South Tower


North Tower


In the First image there is a large concrete object to the left, square like sticking out of the ground with 4 small pillars surrounding it on each corner, anyone have a clue what this is?? Also curious as to where a connecting pedway might go?
Reply With Quote
     
     
  #57  
Old Posted Mar 13, 2014, 7:10 PM
James Gablan James Gablan is offline
Registered User
 
Join Date: Jun 2013
Posts: 53
There is not going to be a connecting pedway.

I suspect that 10 years from now after enough people complain they will build one connecting to Campion, which will be a giant cop out because everybody will want it connected to the LI, but like most construction projects in Saskatchewan no effort was taken to account for the weather or the surrounding buildings. if you look at the floor plan there is not even a door on the west side of the towers. So everybody will exit the buildings on the south side and walk around the outside of the building.
Reply With Quote
     
     
  #58  
Old Posted Mar 13, 2014, 7:25 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,237
It appears to me that plans have changed. They do not appear to be constructing the twin 5 story annexes on the south side shown below.

Reply With Quote
     
     
  #59  
Old Posted Mar 13, 2014, 10:06 PM
Baker58 Baker58 is offline
Registered User
 
Join Date: Apr 2011
Posts: 167
Quote:
Originally Posted by Stormer View Post
It appears to me that plans have changed. They do not appear to be constructing the twin 5 story annexes on the south side shown below.

Judging by his photos and the location of the buildings on the left in picture two, I believe he is taking a picture of the site from the North side. The 5 store buildings are on the other side.
Reply With Quote
     
     
  #60  
Old Posted Mar 13, 2014, 10:20 PM
Dougler306 Dougler306 is online now
Registered User
 
Join Date: Oct 2011
Location: Regina
Posts: 452
^^ Yes that is true I was taking the photos from the east side, on the road adjacent to campion. There is the two 5 story sections on the other side. At a similar stage to the middle section between the 2 towers.

But that it is disappointing about that pedway When its -40 out, its no fun walking to campion/luther not to mention the FSIN
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 2:45 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.