Updated proposal (June 2023)
Since the original submission in October 2021, the Master Plan has been revised in response to community meetings, stakeholder consultations, Urban Design Review Panel feedback, and technical reviews of the application. The Master Plan has been refined to include a large central public park space that, together with additional private greenspace, provides an east-west connection between the creek lands and the proposed multi-use pathway connection to Robertson Road.
The proposed Concept Plan for the Stillwater lands proposes a mid-rise built form south of the park with a series of low- and mid-rise buildings providing a suitable transition to the low-rise Bellwood Estates community to the south. North of the park, higher density development is proposed with seven (7) high-rise buildings envisioned atop six (6) storey podiums. The podiums would frame both the new public streets and internal courtyard spaces. A new public road connection continues to be proposed to Moodie Drive in the west which will serve as the road access for the proposed development. Active transportation connections are provided to Moodie Drive and Robertson Road to encourage cycling, walking, and transit use.
http://webcast.ottawa.ca/plan/All_Im...02-21-0120.PDF
http://webcast.ottawa.ca/plan/All_Im...02-21-0120.PDF