Let's hope that after demolition, that construction starts by the Spring or Summer. Since this tower is being built on spec, they wont be forced into waiting for a large tenant to sign a lease before starting construction (like 621 CM did).
It's exciting to see all of the activity taking off on the west end of Capitol Mall.
__________________
Places I've called home: Sacramento, San Antonio, Chicago (Edgewater), Arroyo Grande (San Luis Obispo CA.
I'll be returning to the Alamo City at the end of January 2025. I'm thrilled to be returning to the most beautiful city in Texas.
|