Sat. Jan. 20 2018 Pics:
^^^^ Another busy Saturday. They are making good progress excavating the office tower parkade.
^^^^ Condo 16th floor columns poured. They were pouring the hotel 14th floor columns Sat. morning. Getting ready to install condo construction elevator. The renderings I saw show the office tower to be the approximate height of the condo 16th floor.
^^^^ This is the approx. size of the building as it would have been before the 4 floors were added.
^^^^ From southern part of River Landing. For those not familiar with Saskatoon, Urban Capital's proposed next project is approximately between the two highrises on the right of the image. Just to the left (and below) the Remai Modern is the pump house, where hopefully a riverside restaurant will locate. Behind that is vacant land where hopefully another tower (or two) will be built.
^^^^ From the boathouse.