Posted Aug 6, 2008, 6:45 PM
|
|
Registered User
|
|
Join Date: May 2008
Location: The Triangle
Posts: 1,316
|
|
Excavation was done, and the columns were set in. They are dug around pretty low, maybe they are working on drainage? not sure. But there are medal beams down below ready to be set. Perhaps the base is going to be set soon, I'm sure its going to be more than just a trash slab. I don't think the restaraunt is going to be built too low below street level since there are no flood gates north, probably same depth as Acenar.
|