Old Posted Jun 16, 2019, 6:58 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,221
Quote:
Originally Posted by SaskE30 View Post
I agree but I believe the rule is it should be labeled "site prep" until the structure breaches ground level at which point it can officially be labeled "under construction"
Is that called the “Capital Pointe” rule?
Reply With Quote
     
     
  #42  
Old Posted Jun 17, 2019, 3:14 PM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 853
Actually there was a discussion of this in the Vancouver Downtown Development

Title "One Burrard Place" Starting Post 1022, June 13, 2017

Not that it really matters.
Reply With Quote
     
     
  #43  
Old Posted Jun 17, 2019, 4:28 PM
macca's Avatar
macca macca is offline
the heat goes on
 
Join Date: Jul 2006
Location: Saskatoon, SK
Posts: 712
first luffer crane i recall seeing in saskatoon
Reply With Quote
     
     
  #44  
Old Posted Jun 17, 2019, 4:37 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 9:33 PM.
Reply With Quote
     
     
  #45  
Old Posted Jun 17, 2019, 8:53 PM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Saskatoon, SK
Posts: 652
Quote:
Originally Posted by macca View Post
first luffer crane i recall seeing in saskatoon
Was just going to mention that, didnt think they would use that model for that project.
Reply With Quote
     
     
  #46  
Old Posted Jun 18, 2019, 1:19 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
June 17 Pictures



^^^ From Sask Crescent.



^^^ Can't get the whole thing in from close up. Right after I took this picture they drilled that entire giant drillbit into the ground in about 5 mins. The hydraulic motor did not even appear to struggle one little bit.



^^^ From under the Victoria Bridge. Once Highpoint and Escala are up there will be a little cluster at the top of the Broadway Bridge.
Reply With Quote
     
     
  #47  
Old Posted Jun 18, 2019, 2:12 AM
Dalreg's Avatar
Dalreg Dalreg is offline
Registered User
 
Join Date: Mar 2006
Location: Somewhere over the rainbow
Posts: 1,891
So probably be as high as the crane cab when finished?
__________________
Blow this popsicle stand
Reply With Quote
     
     
  #48  
Old Posted Jun 18, 2019, 2:57 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Quote:
Originally Posted by Dalreg View Post
So probably be as high as the crane cab when finished?
Yep... Highpoint (which will be behind the green building in this photo) might be approx as tall as the crane, but Escala (where the crane is) is only 7 floors... maybe as tall as the cab on the crane.
Reply With Quote
     
     
  #49  
Old Posted Jul 1, 2019, 2:33 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
June 27 Pics:

The piling rig is gone and there are 4 or 5 hexagonally shaped footings poured.



Reply With Quote
     
     
  #50  
Old Posted Jul 9, 2019, 9:14 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,485
Was on the Escala website the other day and it appears most, if not all, of the river facing units have been sold! (that includes 2 of the 3 penthouses). As well, 6 of the 10 townhouse options have been sold. I would think they must be pretty happy with the sales response to a building just under construction!

https://www.liveescala.ca/building/floor-plans/
Reply With Quote
     
     
  #51  
Old Posted Jul 9, 2019, 10:48 PM
Dalreg's Avatar
Dalreg Dalreg is offline
Registered User
 
Join Date: Mar 2006
Location: Somewhere over the rainbow
Posts: 1,891
Obviously views towards the city are more important than sunshine from the south?
__________________
Blow this popsicle stand
Reply With Quote
     
     
  #52  
Old Posted Jul 10, 2019, 2:44 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,485
Funny you should mention that as I have a friend now interested in the Escala but specifically wants a south exposure to maximize natural light coming into the unit. They say the river is right outside their door to enjoy, so not as much a priority to overlook.
Reply With Quote
     
     
  #53  
Old Posted Jul 11, 2019, 1:51 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Some columns starting to appear. Its hard to tell just what is what but when looking at it in person I get the feeling that the driving space between the stalls will be very narrow.

Reply With Quote
     
     
  #54  
Old Posted Jul 13, 2019, 12:29 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Not sure what's going on here but they have dug a huge hole, undercutting what appears to be the beginnings of an elevator core (it can be seen in the picture I posted a couple of days ago as well.)

In the foreground is a bunch of rebar and broken up concrete. In the background can be glimpsed drainage pipes and sand getting spread. It looks like they are preparing the ground for the first parking floor.


Reply With Quote
     
     
  #55  
Old Posted Jul 30, 2019, 2:29 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
July 29 Pictures:



^^^ They are extending the foundation along the south wall of the pit. Rebar for two tall columns can be seen.



^^^ It looks like there will be some kind of long narrow storage or mechanical room or something between the rows of parking.



^^^ They have been preparing for the first slab of parking for a while now. Based on what I see, I am guessing there will be two levels of underground parking on the east side of the building (far side in above photo) but only one level on the west side
Reply With Quote
     
     
  #56  
Old Posted Aug 10, 2019, 2:51 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Aug. 9 Pictures

They have poured the first parking slab







Reply With Quote
     
     
  #57  
Old Posted Aug 28, 2019, 12:38 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Aug. 27 Pictures:



^^^ Big pour today. They poured the second level of parking on the SE (i.e., street facing) side of the building. There is only a small amount of underground parking left to pour.



^^^ On the right of the image can be seen the ramp from the alley into the garage. I think the forming to the left of the ramp is for "outdoor" parking accessible right from the alley. I'm not sure if its going to be covered, or have individual garage doors, or what. But it looks like there will be a significant slope down to the alley.



^^^ Another view of the ramp into the garage
Reply With Quote
     
     
  #58  
Old Posted Aug 28, 2019, 5:02 AM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 941
Why is the Escala thread still listed as 'Site Prep'? It sure looks like construction is moving along nicely!
Reply With Quote
     
     
  #59  
Old Posted Aug 28, 2019, 3:59 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,221
Quote:
Originally Posted by Draftsman View Post
Why is the Escala thread still listed as 'Site Prep'? It sure looks like construction is moving along nicely!
See the discussion at the bottom of page 2 and the top of this page in this thread. The trigger for "Under Construction" is when the construction reaches above ground level.
Reply With Quote
     
     
  #60  
Old Posted Sep 13, 2019, 1:37 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
I checked the Escala website and it looks like there are 28/45 units sold. Last time I checked (in March) there were 20/45. So it looks like some progress but who knows how accurate the website is.



^^^ Still a little bit of parking to be poured. The below grade foundation wall is basically complete.



^^^ They are starting to backfill around the foundation.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 3:48 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.