HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jan 22, 2019, 8:02 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,743
Quote:
Originally Posted by CoryB View Post
A sad reality of those Perimeter plans is the province wants to down grade Portage (HWY 1) and the Perimeter to a diamond as a cost savings measure.

By making Portage into a diamond the existing bridge decking can be slightly reworked to handle six lanes of through traffic by repurposing the merge/exit lane into a through lane. If they kept it as-is there would be major reworking needed to accommodate six through lanes.
I don't mind it. To me, interchanges - clover leaf or system should be reserved for Hwy to Hwy. If the truck traffic comes off because of the Bypasses (i know, they may never be built) it will only handle commuter traffic.

Most of the major US cities that I have been to driving all generally use some form of diamonds for road access to freeway. Toronto, Minneapolis, Denver, Chicago, Miami, San Fransisco, etc, etc
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 9:41 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.